Difference between revisions of "Micro Hydro Power (MHP) - Ethiopia, Ererte"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 1: Line 1:
 
'''Location of the site''':<br>
 
'''Location of the site''':<br>
  
*Country: Ethiopia
+
*Country: Ethiopia  
*District: Bona Zuria
+
*District: Bona Zuria  
*Kebele: Beshiro Gute
+
*Kebele: Beshiro Gute  
 
*GPS coordinate: 6º33’26.8’’N 38º40’8.4’’ E  
 
*GPS coordinate: 6º33’26.8’’N 38º40’8.4’’ E  
 
*Start of Construction: August 2009  
 
*Start of Construction: August 2009  
Line 12: Line 12:
 
<br>
 
<br>
  
'''Technical Specification:'''  
+
'''Technical Specification:'''<br>
 
 
<br>
 
  
 
*Canal: Lined stone masonry having a length of 53m  
 
*Canal: Lined stone masonry having a length of 53m  
 
*Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured&nbsp;  
 
*Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured&nbsp;  
 
*Turbine:<br>T-15 cross flow turbine /Manufactured locally  
 
*Turbine:<br>T-15 cross flow turbine /Manufactured locally  
*Generator:<br>
+
*Generator:
 
*Grid:<br>Wooden pole, ABC cable(2.76Km)
 
*Grid:<br>Wooden pole, ABC cable(2.76Km)
  
<br>
 
  
&nbsp;
 
  
 
{| class="FCK__ShowTableBorders" cellspacing="1" cellpadding="1" width="100%" border="0"
 
{| class="FCK__ShowTableBorders" cellspacing="1" cellpadding="1" width="100%" border="0"

Revision as of 14:36, 20 December 2010

Location of the site:

  • Country: Ethiopia
  • District: Bona Zuria
  • Kebele: Beshiro Gute
  • GPS coordinate: 6º33’26.8’’N 38º40’8.4’’ E
  • Start of Construction: August 2009
  • Date of Commissioning:
  • Ownership:
    Robot Electric Users Cooperative/community based cooperative society
  • Tariff Structure:
    Flat rate/monthly based per appliance


Technical Specification:

  • Canal: Lined stone masonry having a length of 53m
  • Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured 
  • Turbine:
    T-15 cross flow turbine /Manufactured locally
  • Generator:
  • Grid:
    Wooden pole, ABC cable(2.76Km)


Ererti Fall.JPG
Ererti MHP site.JPG
Ererti MHP weir ,Intake and canal.JPG
Locally Manufactured T-15 Turbine.JPG