Difference between revisions of "Micro Hydro Power (MHP) - Ethiopia, Ererte"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 4: Line 4:
 
*<u>District</u>: Hula  
 
*<u>District</u>: Hula  
 
*<u>Kebele</u>: Beshiro Gute  
 
*<u>Kebele</u>: Beshiro Gute  
*<u>River</u>:<br>
+
*<u>River</u>: Ererte<br>  
 
*[[GPS coordinates - MHP sites EnDev|<u>GPS coordinate</u>]]<u>:</u> 6º33’26.8’’N 38º40’8.4’’ E
 
*[[GPS coordinates - MHP sites EnDev|<u>GPS coordinate</u>]]<u>:</u> 6º33’26.8’’N 38º40’8.4’’ E
  
<br>
+
<br>  
  
The MHP plant Ererte has a capacity of 33 kW and was inaugurated in May 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700.
+
The MHP plant Ererte has a capacity of 33 kW and was inaugurated in May 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700.  
  
 
<br> '''Start of Construction: '''August 2009  
 
<br> '''Start of Construction: '''August 2009  
Line 27: Line 27:
 
*Canal: Lined stone masonry having a length of 53m  
 
*Canal: Lined stone masonry having a length of 53m  
 
*Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured&nbsp;  
 
*Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured&nbsp;  
*Turbine:<br>T-15 cross flow turbine /Manufactured locally  
+
*Turbine: T-15 cross flow turbine /Manufactured locally  
 
*Generator:  
 
*Generator:  
*Grid:<br>Wooden pole, ABC cable(2.76Km)
+
*Grid: Wooden pole, ABC cable(2.76Km)
  
 
<br>  
 
<br>  
Line 44: Line 44:
 
&nbsp;  
 
&nbsp;  
  
[[Category:Hydro]][[Category:Ethiopia]]
+
[[Category:Hydro]] [[Category:Ethiopia]]

Revision as of 15:15, 26 July 2011

Location of the site:

  • Country: Ethiopia
  • District: Hula
  • Kebele: Beshiro Gute
  • River: Ererte
  • GPS coordinate: 6º33’26.8’’N 38º40’8.4’’ E


The MHP plant Ererte has a capacity of 33 kW and was inaugurated in May 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700.


Start of Construction: August 2009

Date of Commissioning:


Ownership: Robot Electric Users Cooperative/community based cooperative society

Tariff Structure: Flat rate/monthly based per appliance


Technical Specification:

  • Canal: Lined stone masonry having a length of 53m
  • Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured 
  • Turbine: T-15 cross flow turbine /Manufactured locally
  • Generator:
  • Grid: Wooden pole, ABC cable(2.76Km)


Ererti Fall.JPG
Ererti MHP site.JPG
Ererti MHP weir ,Intake and canal.JPG
Locally Manufactured T-15 Turbine.JPG