Difference between revisions of "EnDev Indonesia Site Criteria Checklist for Solar / Micro Hydro Power Plants"
***** (***** | *****) m (Wiki Gardener moved page EnDev Indonesia Site Criteria Checklist to EnDev Indonesia Site Criteria Checklist for Solar / Micro Hydro Power Plants without leaving a redirect) |
***** (***** | *****) m |
||
Line 1: | Line 1: | ||
− | |||
= Overview = | = Overview = | ||
Line 29: | Line 28: | ||
<references /><br/> | <references /><br/> | ||
+ | [[Category:Indonesia]] | ||
+ | [[Category:Tools]] | ||
+ | [[Category:Mini-grid]] | ||
+ | [[Category:Solar]] | ||
+ | [[Category:Micro_Hydro]] | ||
+ | [[Category:Rural_Development]] | ||
+ | [[Category:Hydro]] | ||
[[Category:Rural_Electrification]] | [[Category:Rural_Electrification]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Latest revision as of 09:30, 20 July 2018
Overview
Purpose of the "EnDev Indonesia Site Criteria Checklist" is to assess the suitability of a site to accommodate Pembangkit Listrik Tenaga Surya (PLTS) - (Solar Power Plants) orPembangkit Listrik Tenaga Mikro Hidro (PLTMH) - (Micro Hydro Power Plant) facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment.
Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs).
Download
Download: EnDev Indonesia Site Criteria Checklist (Solar / Micro Hydro Power Plant):
Further Information
Reference