Difference between revisions of "EnDev Indonesia Site Criteria Checklist for Solar / Micro Hydro Power Plants"
From energypedia
***** (***** | *****) |
***** (***** | *****) m |
||
Line 2: | Line 2: | ||
= Introduction = | = Introduction = | ||
− | [[File:EnDev Indonesia Site Criteria Checklists for PLTS and | + | [[File:EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf|thumb|right|180px|alt=EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf]]Purpose of this checklist is to assess the suitability of a site to accommodate PLTS or PLTMH facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment. |
<br/> | <br/> | ||
Line 10: | Line 10: | ||
<br/> | <br/> | ||
+ | <br/> | ||
= Further Information = | = Further Information = | ||
− | *[[:File: | + | *[[:File:EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf|EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH]] |
<br/> | <br/> | ||
+ | <br/> | ||
= Reference = | = Reference = |
Revision as of 08:30, 18 July 2014
Introduction
Purpose of this checklist is to assess the suitability of a site to accommodate PLTS or PLTMH facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment.
Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs).
Further Information