Difference between revisions of "Carbon Markets for Photovoltaic (PV) Systems"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 42: Line 42:
 
<span style="font-size: 10pt; color: black; mso-fareast-font-family: 'times new roman'; mso-bidi-font-family: arial; mso-fareast-language: de"><font face="Arial">For further details on current emissions reductions&nbsp;projects on pico PV see the following: </font>[http://energypedia.info/index.php/File:CDM_Pico_PV_Projects-04082010.pdf <span style="color: #002bb8; mso-bidi-font-size: 11.0pt"><font face="Arial">Pico PV Systems and&nbsp;Emissions Reductions 082010.&nbsp;</font></span>]</span>
 
<span style="font-size: 10pt; color: black; mso-fareast-font-family: 'times new roman'; mso-bidi-font-family: arial; mso-fareast-language: de"><font face="Arial">For further details on current emissions reductions&nbsp;projects on pico PV see the following: </font>[http://energypedia.info/index.php/File:CDM_Pico_PV_Projects-04082010.pdf <span style="color: #002bb8; mso-bidi-font-size: 11.0pt"><font face="Arial">Pico PV Systems and&nbsp;Emissions Reductions 082010.&nbsp;</font></span>]</span>
 
</div>
 
</div>
 +
<br>General information on carbon&nbsp;finance related issues, CDM and voluntary markets
  
 
+
[[Programme of Activities (PoA)|Information on Programme of Activities (PoA)]]
General information on carbon market related issues, CDM and voluntary markets
 
 
 
[[Programme_of_Activities_(PoA)|Information on Programme of Activities (PoA)]]
 

Revision as of 14:55, 17 August 2010

PV Solar home systems (SHS) are an eligable technology for carbon finance projects. However, their GHG savings  (carbon credit) potential is small compared to overall PV system costs.

Studies and Research Papers

Approaches to Integrate Carbon Finance into Energy Efficient Lighting Initiatives- Lighting Africa Presentation on Carbon Finance issues in off-grid lighting projects.

Selected PV Solar Home System Carbon Finance Projects (August 2010)

Selected Pico PV and Solar Lantern Carbon Finance Projects (August 2010) 

Pico PV (or micro PV systems), such as solar lanterns, are usually very small SHS with a module capacity of up to 10W and lamps or lanterns (often only one) with integrated batteries.  Currently there are two CDM projects (both in India) registered under the UNFCCC . Four more (Malawi, Zambia, Tanzania and India) are either already registered or pending under the Gold Standard. 


CDM


VCM - Gold Standard

  • SolarAid Microsolar Solar Lantern Project for Malawi: VERs already issued. Replacement of 39,000 kerosene lamps through solar lamps with 1.8 W module and other renewable energy devices. Crediting period: 26 May 10 - 25 May 19. Focus on capacity development and partly local production. Total of approx. 19,000 VERs planned. Monitoring of the first project year showed 1.635 units sold (and in use).    
  • SolarAid Microsolar Solar Lantern Project for Zambia: Verification pending. Crediting perdiod: 10 years. Project design same as Malawi Project. Total of approx. 25,000 VERs planned.
  • D.light Rural Lighting Project Tanzania: 3.640,000 lamps of different models to be sold. Estimated total amount of VERs (depending on lamp types sold) approx. 500,000 VERs. Crediting period: 10 years. 
  • D.Light Rural Lighting Project India - PRE-CDM-VERs (of GS 600): PRE-CDM-VERs of above mentioned CDM project.

 

For further details on current emissions reductions projects on pico PV see the following: Pico PV Systems and Emissions Reductions 082010. 


General information on carbon finance related issues, CDM and voluntary markets

Information on Programme of Activities (PoA)