Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Changuara/Chirodzo (Bernado Corneiro)

From energypedia
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.


Back to the Hydropower Sites Database

General Information

Country: Mozambique
City/Town: Messica, Changuara/Chirodzo, Manica
Coordinates (Powerhouse):
Year of Commission:
Basin Name:
Stream Name: Messica
Developer:
Operator: Bernado Corneiro
Project Status:
Any other uses of the water source: to be assessed - owner works at Ifloma
Contact:
Comment:
Link to Photos:

Technical Information

Power: (kW) 6
Energy (kWh/a):
Capacity Factor (%):
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s):
Minimum Flow of the Stream (m³/s):
Head (m):
Turbine Type:
Turbine Manufacturer:
Generator Type:
Generator Capacity (kW):
Generator Manufacturer:
Comment:

Mini/Island Grid Information

Mini Grid: Yes
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m):
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment:

Dam Information

Dam Type:

Dam Construction Material:
Dam Height [m]:
Length of Dam [m]:
Storage Volume of Reservoir (m³):
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€):
Donor/Financier & Percentage:
Tariff Levels:
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown: