***** (***** | *****) m (New page: <div id="PageContent"> = Checklist for building a biogas plant = #'''Finishing the planning''', i.e. [http://intranet.gtz.de/umwelt/cd-rom44-2003/documents/af4454/Gate/biogas/appldev/pla...) |
***** (***** | *****) m |
||
Line 2: | Line 2: | ||
= Checklist for building a biogas plant = | = Checklist for building a biogas plant = | ||
− | #'''Finishing the planning''', i.e. [http://intranet.gtz.de/umwelt/cd-rom44-2003/documents/af4454/Gate/biogas/appldev/planning/siting.html site evaluation], [http://intranet.gtz.de/umwelt/cd-rom44-2003/documents/af4454/Gate/biogas/appldev/planning/detincdem.html determination of energy demand and biomass supply] / biogas yield, [http://intranet.gtz.de/umwelt/cd-rom44-2003/documents/af4454/Gate/biogas/appldev/planning/sizing.html plant sizing], selection of plant [http://intranet.gtz.de/umwelt/cd-rom44-2003/documents/af4454/Gate/biogas/appldev/design/digestypes2.html#APPRDES design], how and where to use the biogas, etc., in accordance with the [http://intranet.gtz.de/umwelt/cd-rom44-2003/documents/af4454/Gate/biogas/appldev/planning/planguide.html planning guide]<br> | + | #'''Finishing the planning''', i.e. [http://intranet.gtz.de/umwelt/cd-rom44-2003/documents/af4454/Gate/biogas/appldev/planning/siting.html site evaluation], [http://intranet.gtz.de/umwelt/cd-rom44-2003/documents/af4454/Gate/biogas/appldev/planning/detincdem.html determination of energy demand and biomass supply] / biogas yield, [http://intranet.gtz.de/umwelt/cd-rom44-2003/documents/af4454/Gate/biogas/appldev/planning/sizing.html plant sizing], selection of plant [http://intranet.gtz.de/umwelt/cd-rom44-2003/documents/af4454/Gate/biogas/appldev/design/digestypes2.html#APPRDES design], how and where to use the biogas, etc., in accordance with the [http://intranet.gtz.de/umwelt/cd-rom44-2003/documents/af4454/Gate/biogas/appldev/planning/planguide.html planning guide]<br> |
− | + | '''Stipulate the plant's location and elaborate a site plan''', including all buildings, gas pipes, gas appliances and fields to be fertilized with digested slurry | |
− | + | '''Draft a technical drawing showing all plant components''', i.e. mixing pit, connection to stabling, inlet / outlet, digester, gas-holder, gas pipes, slurry storage<br> | |
− | + | '''Preparation of material / personnel requirements list and procurement of materials needed for the chosen plant''': | |
− | + | *bricks / stones / blocks for walls and foundation | |
− | + | *sand, gravel | |
− | + | *inlet / outlet pipes | |
− | + | *metal parts (sheet metal, angle irons, etc.) | |
− | + | *gas pipes and fittings | |
− | + | *paint and sealants | |
− | + | *gas appliances | |
− | + | *tools | |
− | + | *mason and helper | |
− | + | *unskilled labor | |
− | + | *workshop for metal (gas-holder) and pipe installation | |
− | + | '''Material / personnel assignment planning''', i.e. procedural planning and execution of: | |
− | + | *excavation | |
− | + | *foundation slab | |
− | + | *digester masonry | |
− | + | *gasholder | |
− | + | *rendering and sealing the masonry | |
− | + | *mixing pit - slurry storage pit | |
− | + | *drying out the plant | |
− | + | *installing the gas pipe | |
− | + | *acceptance inspection | |
− | + | '''Regular building supervision''' | |
− | + | '''Commissioning''' | |
− | + | *functional inspection of the biogas plant and its components | |
− | + | *starting the plant | |
− | + | '''Filling the plant''' | |
− | + | '''Training the user''' | |
− |
Revision as of 15:45, 4 March 2009
Checklist for building a biogas plant
- Finishing the planning, i.e. site evaluation, determination of energy demand and biomass supply / biogas yield, plant sizing, selection of plant design, how and where to use the biogas, etc., in accordance with the planning guide
Stipulate the plant's location and elaborate a site plan, including all buildings, gas pipes, gas appliances and fields to be fertilized with digested slurry
Draft a technical drawing showing all plant components, i.e. mixing pit, connection to stabling, inlet / outlet, digester, gas-holder, gas pipes, slurry storage
Preparation of material / personnel requirements list and procurement of materials needed for the chosen plant:
- bricks / stones / blocks for walls and foundation
- sand, gravel
- inlet / outlet pipes
- metal parts (sheet metal, angle irons, etc.)
- gas pipes and fittings
- paint and sealants
- gas appliances
- tools
- mason and helper
- unskilled labor
- workshop for metal (gas-holder) and pipe installation
Material / personnel assignment planning, i.e. procedural planning and execution of:
- excavation
- foundation slab
- digester masonry
- gasholder
- rendering and sealing the masonry
- mixing pit - slurry storage pit
- drying out the plant
- installing the gas pipe
- acceptance inspection
Regular building supervision Commissioning
- functional inspection of the biogas plant and its components
- starting the plant
Filling the plant Training the user