Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Dam Review Panel (DRP)"

From energypedia
***** (***** | *****)
(Created page with "{{Project Resource Center |REPRC title=Dam Review Panel (DRP) |REPRC language=English |REPRC file ar= |REPRC file cn= |REPRC file en=ToR for Dam Review Panel.docx |REPRC file ...")
 
***** (***** | *****)
 
Line 11: Line 11:
 
|REPRC file other=
 
|REPRC file other=
 
|REPRC type general=Terms of Reference
 
|REPRC type general=Terms of Reference
|REPRC type terms=Institutional Arrangements for Implementation, Job Descriptions/Project Staff
+
|REPRC type terms=Job Descriptions/Project Staff
 
|REPRC type other=
 
|REPRC type other=
 
|REPRC technology hydro=Hydro
 
|REPRC technology hydro=Hydro
 
|REPRC abstract=The objective of the Terms of Reference (ToR) is to guide the direction of activities of a Dam Review Panel (DRP) for existing dams.
 
|REPRC abstract=The objective of the Terms of Reference (ToR) is to guide the direction of activities of a Dam Review Panel (DRP) for existing dams.
The primary objective of activating a DRP is to provide an independent and high-level technical evaluation of the dam safety status of the existing dams. The reports of the DRP are to become the basis for conducting any identified remedial or rehabilitative actions necessary to upgrade the dam safety.  
+
The primary objective of activating a DRP is to provide an independent and high-level technical evaluation of the dam safety status of the existing dams. The reports of the DRP are to become the basis for conducting any identified remedial or rehabilitative actions necessary to upgrade the dam safety.
 
}}
 
}}
 +
 +
[[Category:Hydro]]

Latest revision as of 21:03, 27 February 2015



Dam Review Panel (DRP)

Title of Document Dam Review Panel (DRP)
Abstract The objective of the Terms of Reference (ToR) is to guide the direction of activities of a Dam Review Panel (DRP) for existing dams.

The primary objective of activating a DRP is to provide an independent and high-level technical evaluation of the dam safety status of the existing dams. The reports of the DRP are to become the basis for conducting any identified remedial or rehabilitative actions necessary to upgrade the dam safety.

File Download

English: ToR for Dam Review Panel.docx

Original Source
Year
Region/Country
Language(s) English
Document Type Terms of Reference - Job Descriptions/Project Staff
Technology Hydro
Connection Type


Hydro


Property "REPRC abstractsearch" (as page type) with input value "ßthe objective of the terms of reference (tor) is to guide the direction of activities of a dam review panel (drp) for existing dams.</br>the primary objective of activating a drp is to provide an independent and high-level technical evaluation of the dam sa" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.