Dam Review Panel (DRP)

From energypedia
Revision as of 21:03, 27 February 2015 by ***** (***** | *****)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)



Dam Review Panel (DRP)

Title of Document Dam Review Panel (DRP)
Abstract The objective of the Terms of Reference (ToR) is to guide the direction of activities of a Dam Review Panel (DRP) for existing dams.

The primary objective of activating a DRP is to provide an independent and high-level technical evaluation of the dam safety status of the existing dams. The reports of the DRP are to become the basis for conducting any identified remedial or rehabilitative actions necessary to upgrade the dam safety.

File Download

English: ToR for Dam Review Panel.docx

Original Source
Year
Region/Country
Language(s) English
Document Type Terms of Reference - Job Descriptions/Project Staff
Technology Hydro
Connection Type


Hydro


Property "REPRC abstractsearch" (as page type) with input value "ßthe objective of the terms of reference (tor) is to guide the direction of activities of a dam review panel (drp) for existing dams.</br>the primary objective of activating a drp is to provide an independent and high-level technical evaluation of the dam sa" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.