Difference between revisions of "Design of Micro-Hydro Funding Facility and Community Mobilization Support"
From energypedia
***** (***** | *****) m |
***** (***** | *****) |
||
Line 1: | Line 1: | ||
− | |||
{{Project Resource Center | {{Project Resource Center | ||
|PRC title=Design of Micro-Hydro Funding Facility and Community Mobilization Support | |PRC title=Design of Micro-Hydro Funding Facility and Community Mobilization Support | ||
|PRC language=English | |PRC language=English | ||
+ | |PRC file ar= | ||
+ | |PRC file cn= | ||
|PRC file en=Design of Micro-hydro Funding Facility and Community Mobilization Support.docx | |PRC file en=Design of Micro-hydro Funding Facility and Community Mobilization Support.docx | ||
|PRC file fr= | |PRC file fr= | ||
− | |PRC file | + | |PRC file pr= |
+ | |PRC file ru= | ||
|PRC file sp= | |PRC file sp= | ||
− | |||
− | |||
− | |||
|PRC file other= | |PRC file other= | ||
|PRC type general=Terms of Reference | |PRC type general=Terms of Reference | ||
Line 17: | Line 16: | ||
|PRC technology hydro=Micro/Pico | |PRC technology hydro=Micro/Pico | ||
|PRC connection=Off-grid | |PRC connection=Off-grid | ||
− | |PRC abstract= | + | |PRC abstract=The following TOR is for the specific purpose of designing a pilot funding facility for micro-hydro projects, financed out of grant and/or loan funds from the [Donor] operation. Preparation of pilot projects is done through a separate consultant work. Aside from briefly raising key questions to be addressed, the TOR puts the responsibility on the consultants to make the final identification of issues and options, and to recommend subsequent steps in the assignment. |
− | |||
− | |||
− | |||
− | The following TOR is for the specific purpose of designing a pilot funding facility for micro-hydro projects, financed out of grant and/or loan funds from the [Donor] operation. Preparation of pilot projects is done through a separate consultant work. Aside from briefly raising key questions to be addressed, the TOR puts the responsibility on the consultants to make the final identification of issues and options, and to recommend subsequent steps in the assignment. | ||
}} | }} | ||
+ | [[Category:Hydro]] | ||
+ | [[Category:Project_Resource_Center]] | ||
+ | [[Category:Micro_Hydro]] | ||
+ | [[Category:PRC_Hydro]] | ||
[[Category:Off-grid]] | [[Category:Off-grid]] | ||
− | |||
− | |||
− | |||
− |
Revision as of 16:05, 26 November 2013
Title of Document | ' |
Abstract | |
File Download | |
Original Source | |
Year | |
Region/Country | |
Language(s) | |
Document Type | |
Technology | |
Connection Type |