Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Design of Micro-Hydro Funding Facility and Community Mobilization Support"

From energypedia
***** (***** | *****)
***** (***** | *****)
m (Text replace - "PRC" to "REPRC")
 
(6 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
{{Project Resource Center
 
{{Project Resource Center
|PRC title=Design of Micro-Hydro Funding Facility and Community Mobilization Support
+
|REPRC title=Design of Micro-Hydro Funding Facility and Community Mobilization Support
|PRC language=English
+
|REPRC language=English
|PRC file en=Design of Micro-hydro Funding Facility and Community Mobilization Support.docx
+
|REPRC file ar=
|PRC file fr=
+
|REPRC file cn=
|PRC file ar=
+
|REPRC file en=Design of Micro-hydro Funding Facility and Community Mobilization Support.docx
|PRC file sp=
+
|REPRC file fr=
|PRC file cn=
+
|REPRC file pr=
|PRC file ru=
+
|REPRC file ru=
|PRC file pr=
+
|REPRC file sp=
|PRC file other=
+
|REPRC file other=
|PRC type general=Terms of Reference
+
|REPRC type general=Terms of Reference
|PRC type terms=Design of Financing Mechanisms
+
|REPRC type terms=Institutional Arrangements for Implementation
|PRC type other=
+
|REPRC type other=
|PRC technology=Hydro
+
|REPRC technology hydro=Hydro
|PRC technology hydro=Micro/Pico
+
|REPRC technology hydro sub=Micro/Pico
|PRC connection=Off-grid
+
|REPRC connection=Off-grid
|PRC abstract=Design of Micro-Hydro Funding Facility and Community Mobilization Support
+
|REPRC abstract=The objective of the assignment described in this Terms of Reference (TOR) is to assist the Project Management Unit (PMU) at the national and provincial levels to design the institutional arrangements for a pilot funding facility for micro hydro projects, and the needed provincial level support to the communities to enable the pilot program to proceed.
 
 
 
 
 
 
The following TOR is for the specific purpose of designing a pilot funding facility for micro-hydro projects, financed out of grant and/or loan funds from the [Donor] operation. Preparation of pilot projects is done through a separate consultant work. Aside from briefly raising key questions to be addressed, the TOR puts the responsibility on the consultants to make the final identification of issues and options, and to recommend subsequent steps in the assignment.
 
 
}}
 
}}
  
Line 26: Line 22:
 
[[Category:Project_Resource_Center]]
 
[[Category:Project_Resource_Center]]
 
[[Category:Micro_Hydro]]
 
[[Category:Micro_Hydro]]
 +
[[Category:REPRC_Hydro]]
 
[[Category:Off-grid]]
 
[[Category:Off-grid]]

Latest revision as of 14:58, 26 February 2014



Design of Micro-Hydro Funding Facility and Community Mobilization Support

Title of Document Design of Micro-Hydro Funding Facility and Community Mobilization Support
Abstract The objective of the assignment described in this Terms of Reference (TOR) is to assist the Project Management Unit (PMU) at the national and provincial levels to design the institutional arrangements for a pilot funding facility for micro hydro projects, and the needed provincial level support to the communities to enable the pilot program to proceed.
File Download

English: Design of Micro-hydro Funding Facility and Community Mobilization Support.docx

Original Source
Year
Region/Country
Language(s) English
Document Type Terms of Reference - Institutional Arrangements for Implementation
Technology Hydro Micro/Pico
Connection Type Off-grid


Hydro