Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "EnDev Indonesia Site Criteria Checklist for Solar / Micro Hydro Power Plants"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
 
(2 intermediate revisions by one other user not shown)
Line 1: Line 1:
 
 
= Overview =
 
= Overview =
  
Line 10: Line 9:
 
= Download =
 
= Download =
  
[[File:EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf|thumb|left|180px|Download: EnDev Indonesia Site Criteria Checklist (Solar / Micro Hydro Power Plant)|alt=EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf]]
+
<u>Download: EnDev Indonesia Site Criteria Checklist (Solar / Micro Hydro Power Plant):</u>
 +
 
 +
[[File:EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf|left|180px|alt=EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf]]<br/>
  
 
<br/>
 
<br/>
Line 25: Line 26:
 
*[[:File:EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf|EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH]]
 
*[[:File:EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf|EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH]]
  
<references />
+
<references /><br/>
  
 
[[Category:Indonesia]]
 
[[Category:Indonesia]]
 +
[[Category:Tools]]
 
[[Category:Mini-grid]]
 
[[Category:Mini-grid]]
 
[[Category:Solar]]
 
[[Category:Solar]]

Latest revision as of 09:30, 20 July 2018

Overview

Purpose of the "EnDev Indonesia Site Criteria Checklist" is to assess the suitability of a site to accommodate Pembangkit Listrik Tenaga Surya (PLTS) - (Solar Power Plants) orPembangkit Listrik Tenaga Mikro Hidro (PLTMH) - (Micro Hydro Power Plant) facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment.

Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs).


Download

Download: EnDev Indonesia Site Criteria Checklist (Solar / Micro Hydro Power Plant):

EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf



Further Information


Reference