Difference between revisions of "EnDev Indonesia Site Criteria Checklist for Solar / Micro Hydro Power Plants"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
 
 
= Overview =
 
= Overview =
  
Line 29: Line 28:
 
<references /><br/>
 
<references /><br/>
  
 +
[[Category:Indonesia]]
 +
[[Category:Tools]]
 +
[[Category:Mini-grid]]
 +
[[Category:Solar]]
 +
[[Category:Micro_Hydro]]
 +
[[Category:Rural_Development]]
 +
[[Category:Hydro]]
 
[[Category:Rural_Electrification]]
 
[[Category:Rural_Electrification]]
[[Category:Hydro]]
 
[[Category:Rural_Development]]
 
[[Category:Micro_Hydro]]
 
[[Category:Solar]]
 
[[Category:Mini-grid]]
 
[[Category:Indonesia]]
 

Latest revision as of 09:30, 20 July 2018

Overview

Purpose of the "EnDev Indonesia Site Criteria Checklist" is to assess the suitability of a site to accommodate Pembangkit Listrik Tenaga Surya (PLTS) - (Solar Power Plants) orPembangkit Listrik Tenaga Mikro Hidro (PLTMH) - (Micro Hydro Power Plant) facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment.

Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs).


Download

Download: EnDev Indonesia Site Criteria Checklist (Solar / Micro Hydro Power Plant):

EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf



Further Information


Reference