Difference between revisions of "EnDev Indonesia Site Criteria Checklist for Solar / Micro Hydro Power Plants"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 12: Line 12:
 
[[:File:https://energypedia.info/wiki/File:EnDev_Indonesia_Site_Criteria_Checklists_for_PLTS_and_PLTMH.pdf|EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH]]
 
[[:File:https://energypedia.info/wiki/File:EnDev_Indonesia_Site_Criteria_Checklists_for_PLTS_and_PLTMH.pdf|EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH]]
  
 +
[[Category:Indonesia]]
 +
[[Category:Mini-grid]]
 +
[[Category:Photovoltaic_(PV)]]
 +
[[Category:Solar]]
 +
[[Category:Micro_Hydro]]
 +
[[Category:Rural_Development]]
 
[[Category:Rural_Electrification]]
 
[[Category:Rural_Electrification]]
[[Category:Rural_Development]]
 
[[Category:Micro_Hydro]]
 
[[Category:Solar]]
 
[[Category:Photovoltaic_(PV)]]
 
[[Category:Mini-grid]]
 
[[Category:Indonesia]]
 

Revision as of 04:40, 17 July 2014

Purpose of this checklist is to assess the suitability of a site to accommodate PLTS or PLTMH facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment.


Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs).


More information

EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH