= Introduction =
+
= Overview =
  
[[File:EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf|thumb|right|180px|alt=EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf]]Purpose of this checklist is to assess the suitability of a site to accommodate PLTS or PLTMH facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment.
+
{| cellspacing="1" cellpadding="5" border="1" style="width: 100%"
 
+
|-
<br/>
+
|  
 +
Purpose of this checklist is to assess the suitability of a site to accommodate PLTS or PLTMH facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment.<br/>
  
 
Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs).
 
Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs).
  
<br/>
+
| [[File:EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf|thumb|right|180px|alt=EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf]]
 +
|}
  
 
<br/>
 
<br/>
Line 14: Line 16:
 
= Further Information =
 
= Further Information =
  
*[[Indonesia_Energy_Situation|Indonesia Energy Situation]]
+
*[[Indonesia Energy Situation|Indonesia Energy Situation]]
 +
*[[Energising_Development_(EnDev)|Energising Development (EnDev)]]
 +
 
 +
 
  
 
= Reference =
 
= Reference =
  
 +
*[[:File:EnDev_Indonesia_Site_Criteria_Checklists_for_PLTS_and_PLTMH.pdf|EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH]]
 +
 +
<references />
 +
 +
[[Category:Indonesia]]
 +
[[Category:Mini-grid]]
 +
[[Category:Photovoltaic_(PV)]]
 +
[[Category:Solar]]
 +
[[Category:Micro_Hydro]]
 +
[[Category:Rural_Development]]
 
[[Category:Rural_Electrification]]
 
[[Category:Rural_Electrification]]
[[Category:Rural_Development]]
 
[[Category:Micro_Hydro]]
 
[[Category:Solar]]
 
[[Category:Photovoltaic_(PV)]]
 
[[Category:Mini-grid]]
 
[[Category:Indonesia]]
 

Revision as of 14:06, 13 August 2014

Overview

Purpose of this checklist is to assess the suitability of a site to accommodate PLTS or PLTMH facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment.

Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs).

EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf


Further Information


Reference