Difference between revisions of "EnDev Indonesia Site Criteria Checklist for Solar / Micro Hydro Power Plants"
From energypedia
***** (***** | *****) m |
***** (***** | *****) m |
||
Line 1: | Line 1: | ||
− | = | + | = Overview = |
− | + | {| cellspacing="1" cellpadding="5" border="1" style="width: 100%" | |
− | + | |- | |
− | <br/> | + | | |
+ | Purpose of this checklist is to assess the suitability of a site to accommodate PLTS or PLTMH facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment.<br/> | ||
Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs). | Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs). | ||
− | + | | [[File:EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf|thumb|right|180px|alt=EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf]] | |
+ | |} | ||
<br/> | <br/> | ||
Line 14: | Line 16: | ||
= Further Information = | = Further Information = | ||
− | *[[ | + | *[[Indonesia Energy Situation|Indonesia Energy Situation]] |
+ | *[[Energising_Development_(EnDev)|Energising Development (EnDev)]] | ||
+ | |||
+ | |||
= Reference = | = Reference = | ||
+ | *[[:File:EnDev_Indonesia_Site_Criteria_Checklists_for_PLTS_and_PLTMH.pdf|EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH]] | ||
+ | |||
+ | <references /> | ||
+ | |||
+ | [[Category:Indonesia]] | ||
+ | [[Category:Mini-grid]] | ||
+ | [[Category:Photovoltaic_(PV)]] | ||
+ | [[Category:Solar]] | ||
+ | [[Category:Micro_Hydro]] | ||
+ | [[Category:Rural_Development]] | ||
[[Category:Rural_Electrification]] | [[Category:Rural_Electrification]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 14:06, 13 August 2014
Overview
Purpose of this checklist is to assess the suitability of a site to accommodate PLTS or PLTMH facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment. Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs). |
Further Information
Reference