Environment Assessment Related to Micro-hydro Power (MHP) Projects in Ethiopia

From energypedia
Revision as of 07:33, 28 March 2011 by ***** (***** | *****)

What is Environment Assessment?

The first step towards a watershed action plan is an Environment Assessment, which includes the selection, compilation and mapping of data on the watershed, with the aim to show its current environmental condition. The implementation of Environment Assessment helps to identify any existing environmental impacts and thus what mitigation techniques need to be implemented within the watershed action plan. 

Biophysical and socio-economic survey

In order to assess as much environmental information on the target area as possible, it is important to consider both, biophysical as well as socio-economic features of the watershed. The most effective way to do so is a combination of landscape observation, interviews and mapping. A checklist and questionnaire help to note down the findings of the landscape observation and the interviews. Maps help to illustrate the environmental condition of the watershed and thus to locate points of interest such as degradation features, wetlands and spring areas. 

How to use the questionnaire and the checklist

The checklist (see fig. 1) and the questionnaire (see fig.2) include a variety of questions and features, all of them having different answer modalities (ranging from qualitative to quantitative). In order to fill in the questionnaire and the checklist it is thus of great importance to not only observe the landscape and to take measurements but also to interview people (inhabitants and/or officials) when required. To make the results of the survey more detailed, the watershed should roughly be divided into (at least) two parts: the upstream and the downstream region. Depending on the size of the watershed, further subdivision might be useful. For each sub-region the questionnaire and the checklist should be filled in.
 

Checklist Environment Assessment related to MHP projects in Ethiopia.pdf


Fig.1:

Checklist     

Questionnaire Environment Assessment related to MHP projects in Ethiopia.pdf


Fig. 2:

Questionnaire         


 How to draw a map

To delineate the watershed boundaries, use a topographic map (scale 1: 50 000) of the area and enlarge it once (1: 25 000) or twice (1: 12 500). The outlet should be the location of the MHP station (see fig. 3). To calculate the area of the watershed, use a grid square (print it on a foil and lay it over the map, see fig. 4). In order to map parts of the watershed in greater detail, the map can be further enlarged[1].

Once the base map is drawn in accordance with the work scale (depending on how detailed the map must be), all information of interest (land use, land cover, springs, wetlands, rivers, degraded areas, infrastructure, slopes, soil texture and other) can be filled in (see fig.5). If there is no GPS available, landmarks such as rivers that are found on the topographic map can be used for orientation. Either all information can be noted on one map, or several thematic maps can be created, showing for example only springs and wetlands or degraded areas.   

 

Watershed Deliniation Topographic Map.png

Fig. 3 :

Watershed deliniation on  

topographic map                                                        

Grid Square for Area Calculation.png

 

Fig. 4:

Grid square for area

calculation                  





          

  

Example work map.png

  Fig. 5:

  Example work map                                                                                       


Identification of major problems and problem areas

Once the biophysical and socio-economic survey is done, the watershed planning team should analyze the collected data carefully in order to assess major problems and problem areas within the watershed. Identified problems should be ranked according to priority (regarding both, quantity and degree of degradation).

Results of the environment assessment should be:

a) a list of the identified problems of the watershed ranked by priority and

b) a map and/or several thematic maps, showing the watershed’s environmental condition and problem areas.


Example: Environment Assessment for the Gobecho catchment (Ethiopia)


Gobecho catchment.jpg










MHP Gobecho I catchment (Ethiopia): upstream and downstream areas


Upstream area

Questionnaire

Name: Gobecho catchment (upstream)…….………………………………………………………………………………………….


Power house location (in degrees): 6°35’29’’N 38°40’56’’E….……………………………………………………………..


Size (in ha): 1955………..………………………………………………………………………………………………………………………


Altitude (in m above sea level): Highest point: 3050….… Lowest point: 2600………

Precipitation (in mm)     : annual: 1357.0 (average for Bensadaye years 2001 – 2007)……
                                             seasonal:

Month
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
Precipitation
40.3
32.1
82.7
174.3
197.6
120.4
110.3
115.7
147.6
179.3
97.2
59.4


Discharge (in m3/s)     : (fill in discharge data from at least two years)
Year 1: Annual average: 0.38…………
             Seasonal:

Month
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
Discharge
0.246
0.224
0.239
0.311
0.437
0.409
0.404
0.426
0.496
0.563
0.463
0.312


Year 2: Annual average: 0.45………
             Seasonal:

Month
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
Discharge
0.55
0.36
0.46
0.23
0.64
0.71
0.35
0.58
0.4
0.45
0.42
0.29


Agroclimatic Zone: tepid to cool humid mid highlands……………………………………………………………..


What do you know about the historic land use? Widely covered with forest…………………………….…………


Have there been any changes in land use? Yes…………………………………………………………………………………….


What kind of? Forest → deforestation → agricultural and pastoral use………………………………………………


When and why? About 40 years ago people started to settle in the area..………………………………………….


What do you know about the future land use, do you know of any planned changes? ………………………..
MHP implementation → population growth around powerhouse likely……………………………………………….


Since when is the area populated? Since about 40 years………………………………………………………………………


What is the current population of the area? About 3000…………………………………………………………………….


Are there any major changes in population (due to migration and/or fertility rate)? Population figure are rising due to high fertility rate…………………………………………………………………………………


Checklist

Downstream area

Questionnaire

Name: Gobecho catchment (downstream)…….…………………………………………………………………………………….


Power house location (in degrees): 6°35’29’’N 38°40’56’’E….……………………………………………………………..


Size (in ha): 1127………..………………………………………………………………………………………………………………………


Altitude (in m above sea level): Highest point: 2600….… Lowest point: 2317………


Precipitation (in mm)     : annual: 1357.0 (average for Bensadaye years 2001 – 2007)……
                                             seasonal:

Month
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
Precipitation
40.3
32.1
82.7
174.3
197.6
120.4
110.3
115.7
147.6
179.3
97.2
59.4


Discharge (in m3/s)     : (fill in discharge data from at least two years)
Year 1: Annual average: 0.38…………
             Seasonal:

Month
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
Discharge
0.246
0.224
0.239
0.311
0.437
0.409
0.404
0.426
0.496
0.563
0.463
0.312


Year 2: Annual average: 0.45………
             Seasonal:

Month
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
Discharge
0.55
0.36
0.46
0.23
0.64
0.71
0.35
0.58
0.4
0.45
0.42
0.29


Agroclimatic Zone: tepid to cool humid mid highlands……………………………………………………………..


What do you know about the historic land use? Widely covered with forest…………………………….…………


Have there been any changes in land use? Yes…………………………………………………………………………………….


What kind of? Forest → deforestation → agricultural and pastoral use………………………………………………


When and why? About 40 years ago people started to settle in the area..………………………………………….


What do you know about the future land use, do you know of any planned changes? ………………………..
MHP implementation → population growth around powerhouse likely……………………………………………….


Since when is the area populated? Since about 40 years………………………………………………………………………


What is the current population of the area? About 3000…………………………………………………………………….


Are there any major changes in population (due to migration and/or fertility rate)? Population figure are rising due to high fertility rate………………………………………………………………………………………………………..


Checklist

Degradation downstream.jpg

 

Landslides

Landslides downstream.jpg    

Cattlestep

Cattlestep downstream.jpg

More than one cross is possible. Table above should be filled in according to prevailing color. In doubt cross the darker one.

 

Gully erosion

Gullyerosion downstream.jpg

 

Badlands
Low = < 0.25 ha  Medium = 0.25 – 0.5 ha  High = > 0.5 ha


Alternation of discharge
(Difference between annual discharge rates in % (use average difference if data from more than two years is available)
Low = < 10  Medium = 10 - 25  High = >25

Landuse downstream.jpg 

 

(*)list crop types according to quantity

Enset
Coffee


 

(**)list crop types according to quantity

Maize
Teff
Barley
Beans


 

(***)cross the prevailing forest type/use

Foresttype downstream.jpg

 

Cultivation, Grazing, Forest
(in % of the respective area assessed)
Low = < 5  Medium = 5 – 25  High = >25

 

 Naturalresources downstream.jpg

 

 

Slope
(Average, in %)
Low = < 5  Medium = 5 – 15  High = > 15


Wetlands
(in % of the respective area assessed)
Low = < 1  Medium = 1 – 5  High = > 5


Springs
(Average number per km²)
Low = < 1  Medium = 1 – 3  High = > 3


(****) cross the prevailing spring type

Springtype downstream.jpg

Flood events
(Annually)
Low = 1  Medium = 2  High = >2


Water ways (with and without vegetation buffer)
(in % of total length)
Low = < 25  Medium = 25 – 50  High = > 50

Mitigation downstream.jpg

 

Humansettlement downstream.jpg

 

(Referring to the entire area)
Low = 1 Medium = 2 High = > 2


Red and green colors in the tables indicate, whether a low or high occurrence of the respective feature is rather positive or negative (Red = negative, Green = positive).
Note: The colors only give an indication, nonetheless it should be noted that for example forest which is used for timber and firewood is better than no forest for the environment condition of the watershed.

 


Map

Gobecho watershed deliniation.jpg
Map section.jpg
MHP Gobecho I catchement delinitation
MHP Gobecho I upstream catchment work map section


References

  1. DESTA, L. ET AL. (2005): Part 2: Community Based Participatory Watershed Development: Annex. Addis Ababa: Ministry of Agriculture and Rural Development.