Fierza
From energypedia
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Back to the Hydropower Sites Database
General Information
Country: | Albania |
---|---|
City/Town: | Bajram Curri, Shkoder, |
Coordinates (Powerhouse): | 42° 15' 5.00" N, 20° 2' 35.02" E |
Year of Commission: | 1978 |
Basin Name: | |
Stream Name: | Drin River |
Developer: | |
Operator: | Korporata Elektroenergjitike Shqiptare (KESH). |
Project Status: | Completed |
Any other uses of the water source: | |
Contact: | |
Comment: | |
Link to Photos: |
Technical Information
Power: (kW) | 500000 |
---|---|
Energy (kWh/a): | |
Capacity Factor (%): | |
Penstock Diameter (mm): | |
Penstock Length (m): | |
Penstock Material (m³/s): | |
Maximum Flow of the Penstock (m³/s): | |
Minimum Flow of the Stream (m³/s): | |
Head (m): | |
Turbine Type: | Fracis turbines |
Turbine Manufacturer: | Sulzer |
Generator Type: | |
Generator Capacity (kW): | |
Generator Manufacturer: | Dongfang |
Comment: |
Mini/Island Grid Information
Mini Grid: | No |
---|---|
Load Control Information: | |
Connection Type: | |
Public Lighting: | |
Length of Transmission Line (m): | |
Voltage (v): | |
Transmission Conductor (type) : | |
Diameter of Conductor (mm²): | |
Transformer Rating (kVA): | |
Link to Grid: | |
S.W.E.R: | |
Operational Period (Xdays/year): | |
Comment: | Connected to national grid via 220kV lines |
Dam Information
Dam Type: |
Dam on river with reservoir |
---|---|
Dam Construction Material: | Rock-fill Dam |
Dam Height [m]: | 170 |
Length of Dam [m]: | |
Storage Volume of Reservoir (m³): | |
Flood Storage of Reservoir: | |
Channel Material: | |
Comment: |
Economic Information
Cost (€): | |
---|---|
Donor/Financier & Percentage: | |
Tariff Levels: | |
Connected Households: | |
Connection Cost (€): | |
Cost to be Covered by Households (%): | |
Comment: | |
Link to Cost Breakdown: |