Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "File:Uruguay Technical Due Diligence Wind Power Project.pdf"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 1: Line 1:
 +
 +
== Summary ==
  
 
The ToR concerns a long term financing for the development, construction and operation of a 65 MW wind farm (44 - 1,5 MW wind turbines). The consulting firm provides independent engineer consulting due diligence services to lenders of projects of this nature which will be performed in two phases:
 
The ToR concerns a long term financing for the development, construction and operation of a 65 MW wind farm (44 - 1,5 MW wind turbines). The consulting firm provides independent engineer consulting due diligence services to lenders of projects of this nature which will be performed in two phases:
  
- Phase I: Initial project review and technical due diligence prior to financial closing;<br/>- Phase II: Construction and performance test monitoring and operations monitoring during commercial operation and after financial closing.  
+
- Phase I: Initial project review and technical due diligence prior to financial closing;<br/>- Phase II: Construction and performance test monitoring and operations monitoring during commercial operation and after financial closing.
 
 
  
 +
<br/>
  
 
== Licensing ==
 
== Licensing ==
Line 14: Line 16:
 
<br/>
 
<br/>
  
 +
[[Category:PPP_in_Infrastructure_Resource_Center|{{PAGENAME}}]]
 +
[[Category:PRC_Terms_of_Reference|{{PAGENAME}}]]
 +
[[Category:Project_Resource_Center|{{PAGENAME}}]]
 +
[[Category:Uruguay|{{PAGENAME}}]]
 
[[Category:Wind|{{PAGENAME}}]]
 
[[Category:Wind|{{PAGENAME}}]]
[[Category:Uruguay|{{PAGENAME}}]]
 
[[Category:Project_Resource_Center|{{PAGENAME}}]]
 
[[Category:PRC_Terms_of_Reference|{{PAGENAME}}]]
 
[[Category:PPP_in_Infrastructure_Resource_Center|{{PAGENAME}}]]
 

Revision as of 11:26, 10 December 2013

Summary

The ToR concerns a long term financing for the development, construction and operation of a 65 MW wind farm (44 - 1,5 MW wind turbines). The consulting firm provides independent engineer consulting due diligence services to lenders of projects of this nature which will be performed in two phases:

- Phase I: Initial project review and technical due diligence prior to financial closing;
- Phase II: Construction and performance test monitoring and operations monitoring during commercial operation and after financial closing.


Licensing

Template:License otherswork World Bank



File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current23:13, 16 October 2013Thumbnail for version as of 23:13, 16 October 20132,480 × 3,508, 9 pages (254 KB)***** (***** | *****)Technical Due Diligence Wind Power Project - Latin America and Caribbean - Uruguay - ToR Download the document from the PPP in Infrastructure Resource Center [http://ppp.worldbank.org/public-private-partnership/library/terms-reference-technical-due-...

There are no pages that use this file.