Difference between revisions of "Greenpower Kenya - Kirangurwe site"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 9: Line 9:
  
  
= Experts opinions and recommendations to the project developers =
+
= Experts opinions and recommendations to the project developers =
The field trip was accompanied by serval Micro Hydro Experts. There impressions of the project site and setup were share in a expert panel discussion. Here is a summary of their statements:
 
  
 +
The field trip was accompanied by serval Micro Hydro Experts. There impressions of the project site and setup were share in a expert panel discussion. Here is a summary of their statements:
  
MP:
+
 
- GreenPower's institutional arrangement is a key potential problem area in the implementation of the project. In particular the complexity of the set-up is likely to cause problems.
+
 
- It is important that GreenPower remain as flexible as possible with regard to insitutional arrangements, adapting thier set-up according to local needs, preferences and realities.
+
<br> MP:
 +
 
 +
*GreenPower's institutional arrangement is a key potential problem area in the implementation of the project. In particular the complexity of the set-up is likely to cause problems.  
 +
*It is important that GreenPower remain as flexible as possible with regard to insitutional arrangements, adapting thier set-up according to local needs, preferences and realities.

Revision as of 19:10, 19 May 2009

During the 1st EnDev East Africa Micro Hydro Workshop a field visit was done to see the Greenpower Project Kirangurwe near Mount Kenya.

Video of the turbine arriving at Kirangurwe


During the field visit the turbine arrived. You can see a youtube video about this exiting event at Kirangurwe turbine video.



Experts opinions and recommendations to the project developers

The field trip was accompanied by serval Micro Hydro Experts. There impressions of the project site and setup were share in a expert panel discussion. Here is a summary of their statements:



MP:

  • GreenPower's institutional arrangement is a key potential problem area in the implementation of the project. In particular the complexity of the set-up is likely to cause problems.
  • It is important that GreenPower remain as flexible as possible with regard to insitutional arrangements, adapting thier set-up according to local needs, preferences and realities.