Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Hydro - FAQ"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 1: Line 1:
<span style="color: rgb(255, 0, 0);">goto third tab &lt;Edit&gt;   and </span><span style="color: rgb(255, 0, 0);">ask your question question here </span><span style="color: rgb(255, 0, 0);">!</span>
+
==== go to third tab &lt;Edit&gt; and ask your question question here ====
  
Answer the questions here ...  
+
<br> Answer the questions here ...  
  
 
<br>  
 
<br>  
  
  <span style="color: rgb(255, 0, 0);">Question?</span>
+
==== What use can a hydropower installation satisfy? ====
  
Answer...
+
*Direct drive of machinery
 +
*Electricity production for local use
 +
*Electricity feed into grid for revenue<br>
  
<br>  
+
<br>
 +
 
 +
==== How many people can be supplied? ====
 +
 
 +
*Available <u>share per household (hh) depends on local hydro potential and type of use</u> (lighting, TV, machinery, ...)
 +
*Required power for <u>lighting</u> depends on no. and type of lamps used (3 - 5 Watt energy saving lamps are existing)<br>
 +
*Machinery needs usually several kW (often machinery's power is given in HP (metrical Horsepower) 10 HP = 7.36 kW)<br>A motors starting power can be 50% higher than its regularly stated power.&nbsp;There are technical possibilities to address these (soft start).
 +
*Electrical heating requires very high power. E.g. has a typical water heater ~ 3 kW. Within an isolated grid, electrical heating / cooking / oven&nbsp; is usually not practicable. Hot water can be produced centrally from the ballast load.<br>
 +
*Electrical cooling is possible.&nbsp;
 +
*Electrical fan ~ 200 Watt.
 +
*Radio / DVD ~ 10 W / 2 W
 +
*Water pump&nbsp; ~ 1 kW
 +
*TV 50 -150 W (depending on type and size)
 +
 
 +
<br>
 +
 
 +
'''What are typical difficulties'''<br>
 +
 
 +
*financial coverage<br>
 +
*remote location<br>
 +
*specific conditions<br>
 +
*uncertain outcome<br>
 +
 
 +
<br>
 +
 
 +
*'''Price range: '''depends on size of potential site, ranges from 2000 - 5000 USD/kW
 +
*'''Material needed: '''Turbine, generator, controller come from a specialist &nbsp;
 +
*'''Suitable geographic area: '''usual hilly and all year round water flow, also irrigation canals can have good hydropower potential
 +
*'''Required competencies: '''Experience in mhp feasibility for pre-study and planning, patience in cooperation with the local entities'''<br>'''
 +
*'''How Long does it take: '''Ideally flow measurements should be taken over several years to ensure safe data. A must is the measurement of the minimal flow during dry season. From there on a mhp plant can be installed within one year. Accessibility of remote location, delivery times for turbine and generator and social setup usually take longer than estimated.&nbsp;
  
 
<br>  
 
<br>  
Line 16: Line 47:
  
 
[[Category:Hydro]]
 
[[Category:Hydro]]
 +
 +
<br>

Revision as of 10:30, 18 June 2010

go to third tab <Edit> and ask your question question here


Answer the questions here ...


What use can a hydropower installation satisfy?

  • Direct drive of machinery
  • Electricity production for local use
  • Electricity feed into grid for revenue


How many people can be supplied?

  • Available share per household (hh) depends on local hydro potential and type of use (lighting, TV, machinery, ...)
  • Required power for lighting depends on no. and type of lamps used (3 - 5 Watt energy saving lamps are existing)
  • Machinery needs usually several kW (often machinery's power is given in HP (metrical Horsepower) 10 HP = 7.36 kW)
    A motors starting power can be 50% higher than its regularly stated power. There are technical possibilities to address these (soft start).
  • Electrical heating requires very high power. E.g. has a typical water heater ~ 3 kW. Within an isolated grid, electrical heating / cooking / oven  is usually not practicable. Hot water can be produced centrally from the ballast load.
  • Electrical cooling is possible. 
  • Electrical fan ~ 200 Watt.
  • Radio / DVD ~ 10 W / 2 W
  • Water pump  ~ 1 kW
  • TV 50 -150 W (depending on type and size)


What are typical difficulties

  • financial coverage
  • remote location
  • specific conditions
  • uncertain outcome


  • Price range: depends on size of potential site, ranges from 2000 - 5000 USD/kW
  • Material needed: Turbine, generator, controller come from a specialist  
  • Suitable geographic area: usual hilly and all year round water flow, also irrigation canals can have good hydropower potential
  • Required competencies: Experience in mhp feasibility for pre-study and planning, patience in cooperation with the local entities
  • How Long does it take: Ideally flow measurements should be taken over several years to ensure safe data. A must is the measurement of the minimal flow during dry season. From there on a mhp plant can be installed within one year. Accessibility of remote location, delivery times for turbine and generator and social setup usually take longer than estimated. 


back to hydro section