Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Koka

From energypedia
Revision as of 08:08, 3 September 2012 by ***** (***** | *****)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Back to the Hydropower Sites Database

General Information

Country: Ethiopia
City/Town: Oromiya
Coordinates (Powerhouse): 8° 28' 6.24" N, 39° 9' 31.68" E
Year of Commission: 1960
Basin Name:
Stream Name: Awash River
Developer:
Operator: Ethiopian Electric and Power Company
Project Status: Completed
Any other uses of the water source:
Contact:
Comment:
Link to Photos:

Technical Information

Power: (kW) 43
Energy (kWh/a):
Capacity Factor (%):
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s):
Minimum Flow of the Stream (m³/s):
Head (m):
Turbine Type:
Turbine Manufacturer:
Generator Type:
Generator Capacity (kW):
Generator Manufacturer:
Comment:

Mini/Island Grid Information

Mini Grid: No
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m):
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment:

Dam Information

Dam Type:

Dam on river with reservoir
Dam Construction Material:
Dam Height [m]: 47
Length of Dam [m]: 458
Storage Volume of Reservoir (m³): 1,900,000,000
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€):
Donor/Financier & Percentage:
Tariff Levels:
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown: