Difference between revisions of "Legal Aspects of Grid Interconnection"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 
 
= Overview<br/> =
 
= Overview<br/> =
 
The flow of electrical power, and of funds to pay for electricity received, across borders must occur within a long-term legal framework that ensures trust between partners, as well as structuring straightforward and transparent dealings between the trading countries and the public and/or private institutions that support grid interconnections.<ref>Legal Aspects of Grid Interconnection - http://www.un.org/esa/sustdev/publications/energy/chapter4.pdf</ref>
 
The flow of electrical power, and of funds to pay for electricity received, across borders must occur within a long-term legal framework that ensures trust between partners, as well as structuring straightforward and transparent dealings between the trading countries and the public and/or private institutions that support grid interconnections.<ref>Legal Aspects of Grid Interconnection - http://www.un.org/esa/sustdev/publications/energy/chapter4.pdf</ref>
 
<br/>
 
 
  
 
= Legal Framework =
 
= Legal Framework =
Line 11: Line 7:
 
► [http://www.un.org/esa/sustdev/publications/energy/chapter4.pdf Legal Aspects of Grid Interconnection (UN)]
 
► [http://www.un.org/esa/sustdev/publications/energy/chapter4.pdf Legal Aspects of Grid Interconnection (UN)]
  
 
 
<br/>
 
 
= Further Information<br/> =
 
= Further Information<br/> =
  
 
*[http://www.un.org/esa/sustdev/publications/energy/chapter4.pdf Find the full article "Legal Aspects of Grid Interconnection" here.]
 
*[http://www.un.org/esa/sustdev/publications/energy/chapter4.pdf Find the full article "Legal Aspects of Grid Interconnection" here.]
 
*[[Portal:Grid|Grid Portal on energypedia]]<br/>
 
*[[Portal:Grid|Grid Portal on energypedia]]<br/>
<br/>
+
*[[Role of Regulation in Energy Access|Role of Regulation in Energy Access]]
 +
*[[Grid Interconnection of Micro-hydro Projects (MHPs) in Nepal|Grid Interconnection of Micro-hydro Projects (MHPs) in Nepal]]
  
  
Line 26: Line 20:
 
<br/>
 
<br/>
  
 +
[[Category:Legal_Framework]]
 
[[Category:Grid]]
 
[[Category:Grid]]
[[Category:Legal_Framework]]
 

Latest revision as of 13:09, 11 September 2018

Overview

The flow of electrical power, and of funds to pay for electricity received, across borders must occur within a long-term legal framework that ensures trust between partners, as well as structuring straightforward and transparent dealings between the trading countries and the public and/or private institutions that support grid interconnections.[1]

Legal Framework

A legal framework is necessary in order to identify the parties responsible for paying for power interconnection infrastructure, for the power itself, and for the costs of operating the infrastructure. In addition, legal agreements must specify the prices to be paid for electricity (and how those prices are to be calculated), what form of payment is acceptable, and other parameters of international funds transfer. Also, for example, legal agreements are needed to indicate which parties are responsible to any third parties harmed by interconnection-related activities, and describing how disputes between parties are to be addressed.[2]

Legal Aspects of Grid Interconnection (UN)

Further Information