This page summarizes experiences of management and working models for MHP in Peru. Most of the experience was gained before 2010, however it is still relevant.
+
= Overview<br/> =
  
= Key points of the operational model<br/> =
+
This page summarizes experiences of management and working models for '''micro hydro power (MHP)''' in [[Peru Energy Situation|Peru]].
  
*The ''owner'' needs to be clearly defined.
+
► [[Micro Hydro Power (MHP) Plants|Micro Hydro Power (MHP) Plants]]
*A ''user committee'' is formed for oversight (usually based on existing community organisation).
 
*''Tariffs'' are defined
 
*The ''operator'' appointed by open competition
 
*There is a ''contract'' linking owner and operator
 
*There is a ''supply'' contract between operator and each consumer
 
  
Often there is a need for training/awareness raising of consumers about the necessity to pay for electricity – and penalties for not paying on time. This issue is discussed below.
+
<br/>
  
= Tariff structure and metering =
+
<br/>
 +
 
 +
= Key Points of the Operational Model<br/> =
 +
 
 +
*The owner needs to be clearly defined.
 +
*A user committee is formed for oversight (usually based on existing community organisation).
 +
*Tariffs are defined
 +
*The operator appointed by open competition
 +
*There is a contract linking owner and operator
 +
*There is a supply contract between operator and each consumer
 +
 
 +
Often there is a need for training and awareness raising of consumers about the necessity to pay for electricity – and penalties for not paying on time. This issue is discussed below.
 +
 
 +
<br/>
 +
 
 +
<br/>
 +
 
 +
= Tariff Structure and Metering<br/> =
  
 
Tariffs for micro hydro and for grid extension are based on '''declining block tariffs '''to ensure viability of the system and to encourage productive uses. (Tariffs for diesel-based mini grids are more likely to be fixed tariff per kWh as marginal cost does not reduce.)
 
Tariffs for micro hydro and for grid extension are based on '''declining block tariffs '''to ensure viability of the system and to encourage productive uses. (Tariffs for diesel-based mini grids are more likely to be fixed tariff per kWh as marginal cost does not reduce.)
  
#'''First block''': normally 6070% of users – 20kWh per month – enough for 2 or 3 lights and radio and possibly small b&w tv. First 10kWh per month of this is fixed payment, regardless of whether consumed.
+
<br/>
 +
 
 +
#'''First block''': normally 60 - 70% of users – 20 kWh per month – enough for 2 or 3 lights and radio and possibly small black & white TV. First 10 kWh per month of this is fixed payment, regardless of whether consumed.
 
#'''Second block''': slightly lower per kWh for additional appliances, e.g. fridge, colour TV – small percentage of domestic users plus small shops/businesses – e.g. ice-making, selling cold drinks
 
#'''Second block''': slightly lower per kWh for additional appliances, e.g. fridge, colour TV – small percentage of domestic users plus small shops/businesses – e.g. ice-making, selling cold drinks
 
#'''Third block''': lowest tariff for additional kWh above 2<sup>nd</sup> block mostly for productive/industrial users, e.g. welders, ice-makers, workshops, millers
 
#'''Third block''': lowest tariff for additional kWh above 2<sup>nd</sup> block mostly for productive/industrial users, e.g. welders, ice-makers, workshops, millers
  
In return for lower marginal tariffs these users agree to avoid peak domestic consumption hours for operation of heavy loads
+
In return for lower marginal tariffs these users agree to avoid peak domestic consumption hours for operation of heavy loads.
  
 +
[[File:Tariff structure mhp peru itdg.jpg|thumb|left|248px|Tariff structure MHP peru]]
  
 +
'''Metering''' is essential for this type of tariff structure but it might be possible to offer the option of energy limiters for the first block with a fixed monthly bill (perhaps less than that for the full 20 kWh). The advantage would be that consumers would know in advance their maximum monthly bill.
  
[[File:Tariff structure mhp peru itdg.jpg|RTENOTITLE]]
+
'''Experience''' in Peru shows that expenditure by block one users is less than expenditure on kerosene, batteries etc. prior to electrification.
  
'''Metering'''is essential for this type of tariff structure but it might be possible to offer the option of energy limiters for first block with a fixed monthly bill (perhaps less than that for the full 20kWh). The only advantage would be that consumers would know in advance their maximum monthly bill.
+
<br/>
  
 +
= Ownership and Contracts<br/> =
  
 +
*The owner has an agreement with the operator, which is a small enterprise, selected by competitive tender, and which would normally require training – see below.
 +
*Owner and operator are both represented on the users’ committee.
 +
*The owner receives the users’ revenue payments from the operator on a monthly basis, together with a report on the state of the system and the list of bills paid.The operator is paid an initial base fee plus a regular fee (20% of revenue) and the remaining of funds go into a rural electrification fund for operating expenses, spare parts, maintenance costs, system expansion etc. The accounts are available for inspection by the users' committee.
 +
*The owner provides all necessary tools and equipment and provides technical and management training to the operator.
 +
*The operator must keep all equipment in good condition, carry out maintenance and provide regular electricity service and payment facilities.
 +
*If the equipment is damaged by negligence of the operator then the operator is liable.
 +
*The owner provides office and workshop for operator.
  
'''Experience'''in Peru shows that '''expenditure''' by block one users is less than expenditure on kerosene, batteries etc. prior to electrification.
+
<br/>
  
 +
== Operator<br/> ==
  
 +
<u>The operator is responsible for:</u>
  
= Ownership and contracts =
+
<br/>
  
The Owner has agreement with operator, which is a small enterprise, selected by competitive tender, and which would normally require training – see below.
+
*providing electricity service to subscribers at agreed hours
 +
*billing and collection of payments in accordance wit tariffs agreed with owner.
 +
*maintenance of all equipment
 +
*keeping owner informed with regular reports
  
 +
<br/>
  
 +
The operator agrees to provide good and prompt service to the users and allow access to equipment and books to owner and users association.
  
Owner and operator are both represented on users’ committee.
+
Failure to comply with the agreement will involve penalties and possible termination of contract.
  
 +
<br/>
  
 +
<br/>
  
Owner receives the users’ revenue payments from the operator on a monthly basis, together with a report on the state of the system and the list of bills paid.The operator is paid an initial base fee plus a regular fee (20% of revenue) and remainder of fund goes into a Rural Electrification Fund for operating expenses, spares, maintenance costs, system expansion etc. The accounts are available for inspection by the Users Committee.
+
== Users' Committe<br/> ==
  
Owner provides all necessary tools and equipment and provides technical and management training to the operator.
+
The users committee is arbitrator of disputes between users and operator.
  
Operator must keep all equipment in good condition , carry out maintenance and provide regular electricity service and payment facilities.
+
The users committee normally consists of a president, vice president, secretary (who keeps minutes) and at least two others. Members serve for one year, renewable once and then cannot be re-elected for at least one year.
  
If the equipment is damaged by negligence of the operator then the operator is liable.If the owner has not provided the equipment, spares etc then. . . .what?The operator would not be liable but might have a claim against the owner??
+
<u>The committee is responsible for:</u>
  
Owner provides office and workshop for operator.
+
<br/>
  
<br/>'''Operator:'''
+
*overseeing the conservation of the electrical service.
 +
*establishing and applying sanctions for non compliance, especially between users and operator,
 +
*monitoring the operator’s monthly reports and deciding whether the contract should be renewed after the five year period.
 +
*meeting once per month
 +
*keeping minutes
 +
*conducting their business without any religious, political, racial or social bias
  
Operator is responsible for:
+
Members do not receive a salary but get 30% discount off their electricity bills provided they attend regularly.
  
*Providing electricity service to subscribers at agreed hours
+
<br/>
*Billing and collection of payments in accordance wit tariffs agreed with owner.
 
*Maintenance of all equipment
 
*Keeping owner informed with regular reports
 
  
Operator agrees to provide good and prompt service to users and allow access to equipment and books to owner and users association.
+
<br/>
  
Failure to comply with the agreement will involve penalties and possible termination of contract.
+
= Conflict Resolution<br/> =
  
Users committee is arbitrator of disputes between users and operator.
+
Users can ask the committee to arbitrate on disputes over bills with the operator and the committee's decision is final apart from the right to resort to other legal means.
  
Users committee normally consists of a president, vice president, secretary (who keeps minutes) and at least two others.Members serve for one year, renewable once and then cannot be re-elected for at least one year.
+
In the event of any dispute over a bill, the user must first try to solve it with the operator. If not satisfied, a user can then take his/her complaint to a member of the users' committee, who will hear both sides and then present his / her findings, together with his/her own opinion, to the committee. The committee who will vote on their decision.
  
The committee is responsible for:
+
<br/>
  
*Overseeing the conservation of the electrical service.
+
<br/>
*Establishing and applying sanctions for non compliance, especially between users and operator,
 
*Monitoring the operator’s monthly reports and deciding whether the contract should be renewed after the five year period.
 
*Meeting once per month
 
*Minutes to be kept
 
*Members do not receive a salary but get 30% discount off their electricity bills provided they attend regularly.
 
*Users can ask committee to arbitrate on disputes over bills with operator and committees decision is final apart from the right to resort to other legal means.
 
*Conducting their business without any religious, political, racial or social bias
 
  
In the event of any dispute over a bill, the user must first take it up with operator.If not satisfied can then take complaint to users committee member, who will hear both sides and then present findings with own opinion to the committee who will vote on their decision.
+
= Various Information<br/> =
  
 
Tariffs, penalties, provision of public lighting etc are decided once a year.
 
Tariffs, penalties, provision of public lighting etc are decided once a year.
  
Tariffs take account of:
+
<u>Tariffs take account of:</u>
 +
 
 +
<br/>
  
 
*Average annual cost of operation, maintenance, generation, distribution, billing, tariff collection, spares, equipment and operator fees.
 
*Average annual cost of operation, maintenance, generation, distribution, billing, tariff collection, spares, equipment and operator fees.
Line 94: Line 123:
 
*Generator capacity
 
*Generator capacity
  
Users are expected to pay within 15 days of billing.Penalties are applied for late payment per day.
+
<br/>
  
Consumers are disconnected if their payments are outstanding for 3 months, and re-connection is only done after payment of overdue bills including penalties and reconnection cost
+
Users are expected to pay within 15 days of billing. Penalties are applied for late payment per day.
  
Bills may need to include tax
+
Consumers are disconnected if their payments are outstanding for three months, and re-connection is only done after payment of overdue bills including penalties and reconnection cost.
 +
 
 +
Bills may need to include tax.
  
 
Revenue goes into Electrification Fund account.The operator’s fees are paid from this account and the balance used for spares, maintenance, new connections, re-positioning poles etc
 
Revenue goes into Electrification Fund account.The operator’s fees are paid from this account and the balance used for spares, maintenance, new connections, re-positioning poles etc
  
Contract with the operator can be terminated if service is unsatisfactory.Normally for 5 years renewable.
+
Contract with the operator can be terminated if service is unsatisfactory.Normally for five years renewable.
  
 
Operator is paid fixed fee on signing plus 20% of revenue collected for management and admin service.
 
Operator is paid fixed fee on signing plus 20% of revenue collected for management and admin service.
  
[[Category:Maintenance_box]]
+
<br/>
[[Category:Löschen/alt?]]
+
 
 +
<br/>
 +
 
 +
= Further Information =
 +
 
 +
*[[Portal:Hydro|Hydro Portal on energypedia]]
 +
*[[Peru Energy Situation|Energy Situation in Peru]]
 +
 
 +
<br/>
 +
 
 +
= References<br/> =
 +
 
 +
Most of the experience was gained before 2010, however it is still relevant.
 +
 
 +
<references />
 +
 
 +
[[Category:Peru]]
 +
[[Category:Case_Study]]
 +
[[Category:Hydro]]
 +
[[Category:Micro-Hydro/Pico-Hydro]]
 +
[[Category:Micro_Hydro]]
 +
[[Category:Small-Hydro/Mini-Hydro]]

Latest revision as of 09:53, 11 June 2015

Overview

This page summarizes experiences of management and working models for micro hydro power (MHP) in Peru.

Micro Hydro Power (MHP) Plants



Key Points of the Operational Model

  • The owner needs to be clearly defined.
  • A user committee is formed for oversight (usually based on existing community organisation).
  • Tariffs are defined
  • The operator appointed by open competition
  • There is a contract linking owner and operator
  • There is a supply contract between operator and each consumer

Often there is a need for training and awareness raising of consumers about the necessity to pay for electricity – and penalties for not paying on time. This issue is discussed below.



Tariff Structure and Metering

Tariffs for micro hydro and for grid extension are based on declining block tariffs to ensure viability of the system and to encourage productive uses. (Tariffs for diesel-based mini grids are more likely to be fixed tariff per kWh as marginal cost does not reduce.)


  1. First block: normally 60 - 70% of users – 20 kWh per month – enough for 2 or 3 lights and radio and possibly small black & white TV. First 10 kWh per month of this is fixed payment, regardless of whether consumed.
  2. Second block: slightly lower per kWh for additional appliances, e.g. fridge, colour TV – small percentage of domestic users plus small shops/businesses – e.g. ice-making, selling cold drinks
  3. Third block: lowest tariff for additional kWh above 2nd block mostly for productive/industrial users, e.g. welders, ice-makers, workshops, millers

In return for lower marginal tariffs these users agree to avoid peak domestic consumption hours for operation of heavy loads.

Tariff structure MHP peru

Metering is essential for this type of tariff structure but it might be possible to offer the option of energy limiters for the first block with a fixed monthly bill (perhaps less than that for the full 20 kWh). The advantage would be that consumers would know in advance their maximum monthly bill.

Experience in Peru shows that expenditure by block one users is less than expenditure on kerosene, batteries etc. prior to electrification.


Ownership and Contracts

  • The owner has an agreement with the operator, which is a small enterprise, selected by competitive tender, and which would normally require training – see below.
  • Owner and operator are both represented on the users’ committee.
  • The owner receives the users’ revenue payments from the operator on a monthly basis, together with a report on the state of the system and the list of bills paid.The operator is paid an initial base fee plus a regular fee (20% of revenue) and the remaining of funds go into a rural electrification fund for operating expenses, spare parts, maintenance costs, system expansion etc. The accounts are available for inspection by the users' committee.
  • The owner provides all necessary tools and equipment and provides technical and management training to the operator.
  • The operator must keep all equipment in good condition, carry out maintenance and provide regular electricity service and payment facilities.
  • If the equipment is damaged by negligence of the operator then the operator is liable.
  • The owner provides office and workshop for operator.


Operator

The operator is responsible for:


  • providing electricity service to subscribers at agreed hours
  • billing and collection of payments in accordance wit tariffs agreed with owner.
  • maintenance of all equipment
  • keeping owner informed with regular reports


The operator agrees to provide good and prompt service to the users and allow access to equipment and books to owner and users association.

Failure to comply with the agreement will involve penalties and possible termination of contract.



Users' Committe

The users committee is arbitrator of disputes between users and operator.

The users committee normally consists of a president, vice president, secretary (who keeps minutes) and at least two others. Members serve for one year, renewable once and then cannot be re-elected for at least one year.

The committee is responsible for:


  • overseeing the conservation of the electrical service.
  • establishing and applying sanctions for non compliance, especially between users and operator,
  • monitoring the operator’s monthly reports and deciding whether the contract should be renewed after the five year period.
  • meeting once per month
  • keeping minutes
  • conducting their business without any religious, political, racial or social bias

Members do not receive a salary but get 30% discount off their electricity bills provided they attend regularly.



Conflict Resolution

Users can ask the committee to arbitrate on disputes over bills with the operator and the committee's decision is final apart from the right to resort to other legal means.

In the event of any dispute over a bill, the user must first try to solve it with the operator. If not satisfied, a user can then take his/her complaint to a member of the users' committee, who will hear both sides and then present his / her findings, together with his/her own opinion, to the committee. The committee who will vote on their decision.



Various Information

Tariffs, penalties, provision of public lighting etc are decided once a year.

Tariffs take account of:


  • Average annual cost of operation, maintenance, generation, distribution, billing, tariff collection, spares, equipment and operator fees.
  • Expected sales of electricity
  • Generator capacity


Users are expected to pay within 15 days of billing. Penalties are applied for late payment per day.

Consumers are disconnected if their payments are outstanding for three months, and re-connection is only done after payment of overdue bills including penalties and reconnection cost.

Bills may need to include tax.

Revenue goes into Electrification Fund account.The operator’s fees are paid from this account and the balance used for spares, maintenance, new connections, re-positioning poles etc

Contract with the operator can be terminated if service is unsatisfactory.Normally for five years renewable.

Operator is paid fixed fee on signing plus 20% of revenue collected for management and admin service.



Further Information


References

Most of the experience was gained before 2010, however it is still relevant.