= <span><font size="5">1</font><span>&nbsp;&nbsp;&nbsp;&nbsp; </span></span><font size="5">Energy Sector</font> =
 
  
Power generation in Mozambique is dominated by the hydroelectric facility Cahora Bassa, located on the Zambezi River in western Mozambique. It contributes to 87% of the 2,400<span> MW production capacity in the country although four fifth are exported to South Africa and Zimbabwe. Hydropower is most important in terms of resources – it disposes of an estimated potential of 12.5 GW. The second major renewable energy potential lies in solar energy, since Mozambique is located in the so-called “sunbelt” with a relatively high but yet unused solar radiation capacity.</span> Wind energy has less potential and is reportedly limited to isolated areas with average winds above 2.2 m/s in Maputo, some coastal areas of Beira and Quelimane and some parts of Tete and Niassa, where the main potential use is for wind-driven water pumps.
+
{{CES Country|CES Country Name=Mozambique
 +
|CES Country Capital=Maputo
 +
|CES Country Region Africa = Sub-Saharan Africa
 +
|CES Country Coordinates=25.9500° S, 32.5833° E
 +
}}<br/>
  
The current capacity of 2,400<span> MW will be supplemented with 550 MW and 2,500 MW from the Cahora Bassa North and Uncuna Hydro stations when they become operational in 2011. A 1,000 MW Thermal Unit powered by natural gas is also planned for the Moatize coal production area.</span>  
+
= Introduction<br/> =
  
Mozambique is self-sufficient in energy with the exception of liquid fuels. Despite the extensive modern resources, biomass is by far the country’s predominant energy source. Firewood and charcoal (woodfuels) are used by over 95% of the rural households – and by 85% of the total households.  
+
Mozambique is one of the poorest countries of the world with a population of 28.8 million people and almost 70% of the population living on less than USD 1.90 per day (2016).&nbsp;The Human Development Index (HDI) 2016 ranks Mozambique 181 out of 188 countries - dropping down from 180 in 2015. &nbsp;As household budget survey conducted by the Mozambican government in 2016 reveals that the rural-urban gap and income disparity have considerably increased since 2010.<br/>
  
While the energy consumption is dominated by the consumption of biomass, only 8.2% of the population had access to electricity in 2006 (with an increase of 6.8% in comparison to the previous year) and an estimation of 10% in 2008. In 2006 the electrification rate at urban areas was about 20% while at rural areas it was about 1-2% of the population. In 2006 the maximum peak of the electricity system was 320 MW and the maximum peak in the Southern system was 216 MW.  
+
&nbsp;Mozambique has undertaken significant efforts in recent years in electrifying the country. The electrification rate has increased from 5% in 2001 to 26% in 2016. However, access to electricity remains low and is mainly focused on urban areas. The vast majority (70%) of Mozambique’s population lives in rural areas of which only 5.7% use electricity for lighting. Forest resources satisfy more than 85% of total domestic energy requirements, in rural areas even over 95%. Although also used for lighting, biomass is mainly used for cooking. The great majority of households uses inefficient cooking technologies such as three-stone fire and traditional stoves.<br/>
  
Mozambique is a vast country with a low population density of 27 per square kilometre. It is therefore expensive to distribute any commercial form of energy. Considering grid connection fees of 3,500 MZM (146 US$) and an income per capita of 310 US$ in 2008 (WB 2008), electricity is unaffordable for most part of the population especially due to the prohibitive up-front costs.  
+
The national grid including off grid facilities is claimed to reach some 30&nbsp;% of the country today in terms of numbers of people with potential access to the grid (not connected). Many district capitals depend on expensive and often unreliable power generation with diesel generators. Outside these towns, the situation is even worse. The overwhelming majority of rural households, most rural schools, health centres and administrative posts are without access to electricity. Lack of mechanical power is a bottleneck for the rural subsistance agricultural production, as grain producers have to walk long distances to the nearest milling facility. Rural areas lack electricity for lighting, radio and communication in households and for refrigeration in small commerce. Nevertheless, many rural household spend a considerable share of their income for modern energy in the form of kerosene or batteries (€ 4–5 per month). Lack of access to electricity restricts the local population’s opportunities for income-generating activities.<br/>The energy sector is key to the country's economy already today, since energy exports make up a large share of total foreign exchange earnings. Moreover, the availability of cheap electricity is one of the main reasons for the significant foreign direct investment in energy-intensive industries in Mozambique. Energy exports (hydropower, coal, gas and possibly oil) and projects to cover the growing domestic electricity demand will play an increasingly important role in the years to come. The liberalisation of the power sector initiated in 1997 allowed for third parties from the private sector to enter the power generation, transmission and distribution markets without impressive results so far (2012).<br/>
  
== <span><font size="3">1.1</font><span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span><font size="3">Electricidade de Moçambique (EdM)</font> ==
+
<br/>
  
The most relevant institution in the energy sector is Electricidade de Moçambique (EdM) which is responsible for the transport, distribution and commercialisation of electricity in Mozambique. EdM is the Mozambican national utility transformed from a state monopoly to a public enterprise in 1995. Nowadays it is a government owned corporation. EdM controls the national grid network and the limited liability company PETROMOC (Mozambican State Company for Petroleum) which administrates petroleum products. The liberalisation of the power sector initiated in 1997 allowed for third parties from the private sector to enter the market.
+
<br/>
  
EdM applies a uniform tariff structure throughout the country, which implies cross-subsidisation from the much more lucrative Southern region to the poor and remote regions in Central Mozambique and especially the North. There, electricity supply and distribution is more expensive than the tariff charged due to long distances and low customer density combined with low consumption per customer.
+
[[Mozambique Energy Situation#toc|►Go to Top]]
  
== <span><font size="3">1.2</font><span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span><font size="3">Problem Situation</font> ==
+
== Potentials ==
  
Access to electricity is among the lowest in the world, especially in rural areas where only 1-2% of the population is supplied. Access to electricity in the capital Maputo amounting to 38% of the population, in the Southern Province close to Maputo (Maputo Province and Gaza) accounting for 10% of the population and in the Central Province Sofala (where the second biggest city Beira is located) accounting for 8.4% of the population is much higher than in the other more rural provinces.  
+
Mozambique has considerable energy resources with an estimated hydropower potential of 12,000 MW and also gas reserves (estimated at reaching 700 billion cubic metres) and vast coal reserves (estimated to reach 140 million TJ) with the potential of generating approx. 500 MW and 5,000 MW respectively.
  
As for electrification of the provincial capitals, in 2007 Mozambique had all 11 provincial capitals connected to the national grid, drawing power from Cahora Bassa. But of the 128 districts, in 2007 there was permanent electricity in only 60 of them, deriving from either the national grid or that of neighbouring states such as Malawi and Zimbabwe. Furthermore the people in the district capital often depend on expensive and sometimes unreliable power generation with diesel generators, supplying electricity for a limited number of hours per day. Outside these towns, the situation is even worse. Apart from the overwhelming majority of rural households, most rural schools, health centres and administrative posts are without access to electricity.
+
[[Mozambique Energy Situation#toc|►Go to Top]]
  
Nevertheless, as a recently executed baseline found out many households spend a considerable share of their income for energy in the form of kerosene, batteries and charcoal. At Matola area poor households spent 22% of their total expenditures and about 12 € on energy per month. In the more rural area Chua (Manica Province) the households spent 12% of their total expenditures and about 5 € on energy per month. Lack of access to electricity restricts the local population’s opportunities for income-generating activities. Therefore, energy is frequently mentioned as a key constraint to local development by the actors involved in participative development planning.
+
<br/>
  
In 2008 the Minister of Energy Namburete declared the hope of the Mozambican government that there would be permanent electricity in 108 district capitals by 2010. Furthermore he pronounced the hope for an average of 70,000 new electricity connections a year over the following years.
+
== Renewable Energy Potential<br/> ==
  
= <span><font size="5">2</font><span>&nbsp;&nbsp;&nbsp;&nbsp; </span></span><font size="5">Institutional and political Environment</font> =
+
{| style="width: 100%" cellspacing="1" cellpadding="1" border="1"
 +
|-
 +
! scope="col" | Resource
 +
! scope="col" | Availability
 +
|-
 +
| Wind
 +
| Along the cost Niassa (Average wind speed 6 m/s)<br/>
 +
|-
 +
| Solar
 +
| 4.5-7 kWh/m2/day
 +
|-
 +
| Hydro
 +
| 12 GW (1 GW in small installations up to 10 MW)
 +
|-
 +
| Biomass
 +
| 100's of MW (Big bagasse potential)
 +
|}
  
== <span><font size="3">2.1</font><span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span><font size="3">Main actors</font> ==
+
[[Mozambique Energy Situation#toc|►Go to Top]]
  
<span>·<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span>'''''The National Directorate of Energy (Direcção Nacional de Energia – DNE)''''' in the '''''Ministry of Energy (MIREME – Ministério da Energia)''''', formulates overall energy planning and policy. The basic working document of the Directorate is the '''''National Energy Sector Strategy''''' established by decree 24/2000. The Mozambican Ministry of Energy still supervises the EdM as to its responsibilities concerning the generation, transmission and distribution of electricity.
+
<br/>
  
Under the 1997 reform programme two new institutions have been created:
+
== Demand and Supply<br/> ==
  
<span>·<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span>'''''The National Electricity Council (Conselho Nacional de Electricidade – CONELEC)''''' was created in 2004 based on the energy reform of the late 1990. It mediates and arbitrates differences arising with energy supply policy, projects, concession requests etc. Although the Ministry of Energy still retains control of the high voltage transmission system and mini grids, CONELEC becomes more and more autonomy and acts independently from the Ministry. Further regulatory action is provided by the Southern Africa Power Pool (SAPP) which regulates all cross border power transactions in the region.  
+
Peak electricity demand was 530 MW in 2010 (without Mozal) with an energy consumption of approximately 3,032 GWh. The increase in power consumption has been significant during recent years with average annual increases in the order of 6 to 8&nbsp;% over the last 10 years. These figures reflect supply to domestic, commercial and industrial consumers in the national power network supplied by Electricidade de Moçambique (EdM) the national power company. Approx. 136 MW (61 MW from hydro and 75 MW from diesel and gas) are supplied by EdM's own generation, mainly by ageing plants requiring refurbishment. The remaining demand is supplied through a purchase agreement with Cahora Bassa, a hydropower plant at the Zambezi River with an installed capacity of 2,075 MW. The number of consumers has grown with more than 10% annually since the year 2000 and was about 850,000 in 2010 (2,240 Medium & High Voltage clients). At present still only 16% of the population has access to electricity. Power demand forecasts indicate that with an average projected growth rate of 6% p.a. Mozambique will reach a maximum demand of 1,350 MW by 2030 and a projected consumption of 8,300 GWh. From 2009 until 2013, it is foreseen that demand reach 560 MW by 2013. For meeting the country‘s electricity needs in a timely manner, it is imperative given that the Cahora Bassa‘s reserve for domestic market requirements of 400 MW is almost exhausted. Therefore it is important that the HEP sites Mavuzi, Chicamba, Corumana are rehabilitated and that the technical and economical feasb. HEP sites Tsate, Mueneze, Alto Malema, Massingir and Mavuzi II and III are errected and the retrofit of the MTC Maputo Gas Turbine. These investments would sum to approx. 415 MW ICap and approx. 300 MW additional firm power. Several large scale IPPs, mainly for export purposes, are planned (totalling ca. 3 to 5 GW).
  
<span>·<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span>'''''The National Energy Fund (Fundo Nacional de Energia – FUNAE)''''' was created in 1997. FUNAE focuses mainly on renewable energy technologies and rural electrification. Its main purpose is to disseminate low-cost energy services by mobilising funds and providing loans in order to benefit low-income populations. It has funded numerous projects and continues to assist the private sector and NGOs with regards to information required for entering the energy sector in Mozambique. FUNAE used to be financed by DANIDA that are prepared to pull out their activities by now.
+
<br/>
  
<span>·<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span>'''''The National Directorate of New and renewable Energies ('''''<b>''Direcção Nacional das Energias Novas e Renoavais<span> – DNENR)</span>''</b> and the National Energy Fund (FUNAE) are actively promoting the development and use of renewable energy technologies through funding and policy.  
+
Biomass coming from an estimated 30.6 million hectares of forest lands for wood fuel and charcoal represents about 80% of the total energy consumed by the households. This value is even bigger in remote rural areas. Every year it is estimated that 16,000,000 m3 of forestry resources are burnt to meet rural energy requirements.
  
== <span><font size="3">2.2</font><span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span><font size="3">Legal Framework</font> ==
+
<br/>
  
The legal energy policy and planning framework in Mozambique is comprised of five documents.  
+
The present consumption of oil products is in the order of 600 million litres per year, transport being the lead user followed by agriculture. The turbulence in international oil markets since 2004 resulting in abrupt fluctuations of oil prices have become a source of social unrest. The reduction of the Mozambican energy bill, especially for imports of liquid fossil fuels, which in 2006 amounted to 14% of national imports, deserves special attention. Today both liquid pe-troleum gas (LPG) and kerosene have only a small impact in terms of the national energy ba-lance. LPG is mainly used in the urban centres of Maputo, Matola, Beira and Nampula. How-ever due to bottlenecks in supplies the national consumption does not exceed 14,000 tons.
  
<span>·<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span>The '''''National Energy Policy (1998)''''' is published by decree 5/98. This document focuses on energy in terms of economic growth and tackles issues with suppliers, access and availability of energy to inhabitants, reforestation, investment, efficiency and a more competitive business sector. It promotes institutional capacity building, exports of energy products and more efficient, dynamic and competitive business sector.
+
<br/>
  
<span>·<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span>The '''''National Energy Sector Strategy (2000)''''' established by decree 24/2000 attempts to transform the intentions in the energy policy into actions.  
+
Mozambique´s considerable energy resources enable the country to meet its internal demand and still export energy to Southern and East African countries. The availability of energy resources including hydro, natural gas and coal, plus the geographical positioning of the country – acting both as route to the countries inland well served by harbours, railway and pipeline systems, and as an interface between the Southern African Development Community (SADC) and the Eastern African Community (EAC) gives Mozambique a privileged, strategic position and role in the regional energy sector.
  
<span>·<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span>'''''Rural Electrification Strategy Plan (2000)''''' is a Norwegian study which currently serves as an official guide to the rural electrification of Mozambique. It raises direct poverty-energy linkages, starting with the recognition of both low per capita incomes and the fact that biomass is by far the largest energy source for the population. It acknowledges the importance of a crosscutting approach stating that initiatives in the sphere of energy will support programmes and investments aimed at increasing the income of the population as well as satisfying health, education and water supply requirements.  
+
<br/>However despite the countries significant electric power potential there should be no rapid shift expected from biomass to electricity use because Mozambique is a vast country with the majority of the population living in rural communities dispersed throughout the provinces. Energy solutions must take into consideration this reality and adapt to it by combining an intensification of electrification in those areas served by the national electricity grid and the adoption of modern technological solutions and energy services in particular for remote areas, using sustainable biomass, solar and hydropower resources.
  
<span>·<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span>'''''Implementation Plan and Final Report of the Rural Electrification Strategy Plan (2001)'''''presents three types of technical energy supply alternatives (grid extension, local isolated grids and stand-alone systems). It assesses and compares a variety of energy resources – grid electrification, diesel generation, small hydropower, PV, wind, biomass, hybrid systems and batteries – and identifies their bottlenecks.
+
[[Mozambique Energy Situation#toc|►Go to Top]]
  
<span>·<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span>'''''The Electricity Act 21/1997''''' allows for private participation in the electricity sector and also defines the national transmission network.
+
<br/>
  
In addition there are the Poverty Reduction Action Plans I and II who are defining a governmental strategy in order to alleviate poverty in Mozambique. Although those documents are gradually revealing more sensitivity to the energy dimension of poverty there is still no thorough analysis leading to a coherent strategy and appropriate pro-poor approaches and programmes.
+
== Noteworthy Trends<br/> ==
  
'''''Government Five-Year Programme 2000-2004'''''<b>: </b>Its main objectives is reducing absolute poverty through social services, rural development, and rapid and sustainable economic growth development mainly in the rural areas. Twelve of the 15 priority energy actions involve electricity. The remaining three are (i) expanding rural access (ii) diversification of energy sources to promote sustainability, including biomass and (iii) more widespread distribution of kerosene.  
+
<span lang="en-us"><span>Despite its </span>large renewable energy resources, the country energy sector focus is on large hydro projects in the Zambezi Basin (i.e. Mphanda Nkuwa) to produce power for export to South Africa and for industry. Mozambique relies heavily on the export of commercial electricity to South Africa from the Cahora Bassa dam on the Zambezi River to generate foreign exchange income.</span>
  
The'''''Action Plan for the Reduction of Absolute Poverty (PARPA) 2001-2005'' '''promotes the reduction of environmental impacts of non-renewable resources, reliable energy supplies for economic growth and new and renewable energy sources in the electrification of remote areas. Furthermore it stresses the importance of electrification of districts with economic potential and of private sector participation in the energy field.  
+
The two immediate projects are the 850 MW (nominal) expansion of the Cahora Bassa dam and the controversial Mphanda Nkuwa dam (2500 MW). See table below.
  
The'''''Action Plan for the Reduction of Absolute Poverty II (PARPA II)'''''establishes target number for people provided with access to electricity in the future. It also deals with the issue of intensifying CONELEC’s work. The targeted outcomes until 2009 are:
+
<br/>
  
<span>·<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span>CONELEC operates efficiently
+
{| style="width: 100%" cellspacing="0" cellpadding="0" border="1"
 +
|-
 +
| style="width: 213px; vertical-align: top" |
 +
'''Project Name Type of Project'''
  
<span>·<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span>800,000 people – access rate of 12% – are provided with new and sustainable access to modern energy
+
| style="width: 213px; vertical-align: top" |
 +
'''Size'''
  
<span>·<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span>and 500 of new institutions are provided with sustainable access to modern energy outside the grid.
+
| style="width: 213px; vertical-align: top" |
 +
'''Comments'''
  
Until the end of November AMES-M contributed sustainable access to modern energy for 27,323 people to the targeted number of PARPA II.
+
|-
 +
| style="width: 213px; vertical-align: top" |
 +
CB North Bank Hydropower expansion
  
= <span><font size="5">3</font><span>&nbsp;&nbsp;&nbsp;&nbsp; </span></span><font size="5">Activities of other stakeholders and donors</font> =
+
| style="width: 213px; vertical-align: top" |
 +
850 to 1300 additional MW
  
The most activities are executed in the field of electrification. Danida, Norway/SIDA, World Bank and AFD have activities in generation, transmission or distribution of electricity.
+
| style="width: 213px; vertical-align: top" |
 +
Detailed feasibility study is underway
  
Furthermore World Bank and AFD have some programmes in the field of transmission and distribution of electricity. All of them are active in the area of rural electrification as well.
+
|-
 +
| style="width: 213px; vertical-align: top" |
 +
Mphanda Nkuwa Hydropower
  
Grid based activities are supported by the two main programmes Energy Reform and Access Project (ERAP) and Electricity Project (EP).
+
| style="width: 213px; vertical-align: top" |
 +
2500 MW
  
In addition DANIDA through FUNAE, the World Bank through the ERAP program and the Spanish cooperation as well as UNIDO works with renewable energy and Solar PV at rural areas. Furthermore some donors give consultancies to important institution such as EdM, DIPREME, DNE, FUNAE and CONELEC. The Norway Cooperation and AFD support the development of the oil and gas field. ADF is financing the Pande and Temane projects by a loan.  
+
| style="width: 213px; vertical-align: top" |
 +
Env. + Soc. Impact Study underway
  
Besides FUNAE and the Swedish International Development Agency who are supposed to fund hydropower plants, there are no major activities of other donors in the field of Pico and Hydro Power. Next to the Pico Hydropower project at Chua no other project has started yet.
+
|-
 +
| style="width: 213px; vertical-align: top" |
 +
Massingir Hydropower
  
&nbsp;  
+
| style="width: 213px; vertical-align: top" |
 +
40 MW
  
At the moment some changes are taking place regarding the donor intervention: DANIDA’s Energy Sector Programme Support (ESPS) in Mozambique phased out in 2008. It comprised Support to the National Energy Sector Institutions, to the National Electricity Operator (EdM)<br>and to Decentralised Energy Management. From the current year on it will be concentrating its activities more on climate and environmental issues. SIDA will be working with the Ministry of Energy and NORAD with EdM. There is no donor who would take over the support of FUNAE that was provided by DANIDA before. However, FUNAE receives funding from several sources as the European Union, the World Bank, the Spanish Cooperation and others.
+
| style="width: 213px; vertical-align: top" |
 +
EDM managed
  
 +
|-
 +
| style="width: 213px; vertical-align: top" |
 +
Lurio Hydropower
  
 +
| style="width: 213px; vertical-align: top" |
 +
120 MW
  
 +
| style="width: 213px; vertical-align: top" |
 +
<br/>
  
 +
|-
 +
| style="width: 213px; vertical-align: top" |
 +
Majawa Hydropower
  
[[Category:Mosambique]]
+
| style="width: 213px; vertical-align: top" |
[[Category:Country Situation]]
+
25 MW
 +
 
 +
| style="width: 213px; vertical-align: top" |
 +
<br/>
 +
 
 +
|-
 +
| style="width: 213px; vertical-align: top" |
 +
Malema Hydropower
 +
 
 +
| style="width: 213px; vertical-align: top" |
 +
60 MW
 +
 
 +
| style="width: 213px; vertical-align: top" |
 +
<br/>
 +
 
 +
|-
 +
| style="width: 213px; vertical-align: top" |
 +
Moatize Coal fired power plant
 +
 
 +
| style="width: 213px; vertical-align: top" |
 +
1500 MW
 +
 
 +
| style="width: 213px; vertical-align: top" |
 +
IES is the developer
 +
 
 +
|-
 +
| style="width: 213px; vertical-align: top" |
 +
Temane Combined Cycle natural gas fired power plant
 +
 
 +
| style="width: 213px; vertical-align: top" |
 +
300-400 MW
 +
 
 +
| style="width: 213px; vertical-align: top" |
 +
On the SASOL gaspipeline. 2010
 +
 
 +
|}
 +
 
 +
<br/>
 +
 
 +
As a result of March 2009 Government policy, the biofuels sector is receiving hundreds of millions of dollars in investment (sugar – ethanol, jatropha --- biodiesel).However, production has yet to commence and there is considerable controversy about transparency and food vs. energy.
 +
 
 +
[[Mozambique Energy Situation#toc|►Go to Top]]
 +
 
 +
<br/>
 +
 
 +
== Market Situation<br/> ==
 +
 
 +
The market situation for '''photovoltaic (PV)''' and hydro power technologies and services is still in a very incipient stage. In the case of micro and pico hydro there are no readily available products available in the country which makes prices prohibitive for communities and individual households. However there is a good potential for local manufacture of water wheels and pico turbines, although the market is still very limited and therefore local services tend to be rather expensive.<br/>
 +
 
 +
<br/>
 +
 
 +
In its first phase, ENDEV MOZAMBIQUE has started pioneer activities in the local manufacture of water wheels for upgrading traditional maize mills and the manufacture of pico turbines with most promising results. Therefore it is envisaged to upscale micro/pico hydro power activities sustainably on a local level with an appropriate and cost effective approach for technical capacity building, technology transfer and market development. The market for PV is divided into steadily growing local market spots and mainly capital based PV providers working with directly imported equipment for government projects funded by donors. The local market is efficient and reliable but informal, with low quality products of Chinese origin coming mainly from RSA. Market actors are lacking technical knowledge. In parallel to the dissemination of products from the local market ENDEV MOZAMBIQUE has started designing an energy efficient compact '''small solar home system (SSHS)''' with a local enterprise. In the case of PV for household lighting, technical capacity building, technology transfer and market development is envisaged within a Public Private Partnership (PPP) measure with German enterprises and higher quality products.<br/>
 +
 
 +
<br/>
 +
 
 +
<u>In addition to the overarching need for developing the countries extensive energy resources (hydro, coal, gas and biomass) for both domestic and regional consumption the main challenges in the power sector in Mozambique are:</u><br/>
 +
 
 +
*Ensuring that affordable electricity supply is available to meet the rapidly growing domestic demand. In the near term, this will involve the continued extension of the grid with a focus on loss reduction and intensification of the grid,
 +
*Reaching the vast areas of the country beyond the national grid managed by EdM. The GoM is committed to supporting decentralized electrification of social infrastructure (rural schools, clinics and administrative offices) and to increase access to modern energy services to villages and rural enterprises through PV systems, micro/pico-hydro schemes, modern biomass energy, and other Renewable Energy Technologies (RETs),
 +
*Ensuring that power shortages do not become a constraint on economic growth. Several GoM proposed generation and transmission ―mega-projects‖ will address sufficiency and security of supply for the medium to long-term,
 +
*Institutional strengthening and capacity development of the main sector public institutions (MoE, EdM, FUNAE and CNELEC) but also of the private sector composed of NGOs, MFIs, and local enterprises working with RETs, in order to improve their respective performance, governance and effectiveness.<br/>
 +
 
 +
<br/>
 +
 
 +
<u>Cumulative capacity, by technology:</u><br/>
 +
 
 +
#<span lang="en-us">Wind: NONE</span><br/>
 +
#<span lang="en-us">Solar PV: NO GRID CONNECT. SMALL OFF GRID MARKET.</span>
 +
#<span lang="en-us">CSP: NONE</span>
 +
#<span lang="en-us">Solar thermal:<span></span>Very small household and tourism market</span>
 +
#<span lang="en-us">Geothermal: NONE.</span>
 +
#<span lang="en-us">Bioenergy (heat and/or power):<span></span> 5-10 MW in 5 sugar refineries (Self consumed)</span>
 +
#<span lang="en-us">Hydropower: 2,075 MW Cahora Bassa dam dominates the energy sector.<span></span>This is owned by Hidroelectrica de Cahora Bassa (HCB), whose assets are 85% owned by the Mozambique government.<br/>160 MW, mostly of hydropower, is managed by Electricidade de Mozambique (EDM)</span>
 +
 
 +
Biofuels production data – for both ethanol and biodiesel.<span></span><br/>A National Policy and Strategy for Biofuels was approved in February 2009 which focuses on ethanol from sugarcane and sorghum and coconut and jatropha for biodiesel. This policy has led to hundreds of millions of dollars in investment plans in ethanol and biodiesel in Mozambique. In October 2007 ethanol plant in Mozambique received US$510 million in support from the UK. However, the actual on-the-ground activity is unclear and production has yet to commence.<span></span> Biofuels are not readily available in the country and export details are also not available<ref name="The biofuels sector, and especially the biodiesel sector, has attracted considerable investment. Hundreds of millions of dollars of investment has been made. Much of this has been in the sugar sector which is growing rapidly. At least 7 biodiesel/jatropha plantations have been set up with poor -- and controversial – results. (see Justica Ambiental!/Uniao Nacional de Camponeses, Jatropha: A Socio-economic pitfall for Mozambique. August 2009. http://ictsd.org/i/news/biores/45169/">The biofuels sector, and especially the biodiesel sector, has attracted considerable investment. Hundreds of millions of dollars of investment has been made. Much of this has been in the sugar sector which is growing rapidly. At least 7 biodiesel/jatropha plantations have been set up with poor -- and controversial – results. (see Justica Ambiental!/Uniao Nacional de Camponeses, Jatropha: A Socio-economic pitfall for Mozambique. August 2009. http://ictsd.org/i/news/biores/45169/</ref>.<br/>
 +
 
 +
#<span lang="en-us">Marine energy (specify technology) NONE</span>
 +
<div><br/></div>
 +
[[Mozambique Energy Situation#toc|►Go to Top]]
 +
 
 +
<br/>
 +
 
 +
= Key Problems of the Energy Sector =
 +
 
 +
Power Africa states that Mozambique's energy sector's most challenging issues are as follows<ref name="Power Africa. (2018). Mozambique Factsheet. Retrieved from: https://www.usaid.gov/sites/default/files/documents/1860/Mozambique_-_November_2018_Country_Fact_Sheet.pdf">Power Africa. (2018). Mozambique Factsheet. Retrieved from: https://www.usaid.gov/sites/default/files/documents/1860/Mozambique_-_November_2018_Country_Fact_Sheet.pdf</ref>:
 +
 
 +
*Public Finances/Macro-economic issues<br/>
 +
*Lacking credible&nbsp;utility and cost-reflective tariff<br/>
 +
*Lack of strong, transparent regulator<br/>
 +
 
 +
<br/>
 +
 
 +
= Policy Framework, Laws and Regulations<br/> =
 +
 
 +
The legal framework relating to energy in Mozambique is composed of a variety of policies, strategies and regulations, the most important ones being the energy strategy (2009), the policy for the development of new and renewable energies 2011-2025 (2011), the strategy of the conversation and sustainable use of biomass energy (2013), the strategy of biofuels (2009), the regulation of biofuels and their mixture and the regulation that established the feed in tariff for new and renewable energies - REFIT (2014).<br/>
 +
 
 +
<br/>
 +
 
 +
Within PARPA (PRSP), the programme for reduction and alleviation of absolute poverty, the GoM has been granting high priority to efforts to increase access to electricity for the population. Within the PARPA II the GoM has affirmed the critical role of the energy sector in reducing poverty. Adequate and equitable access to energy resources and services such as the provision of energy services to households, rural schools, administrative offices, and hospitals in rural areas is defined as a key driver of growth and poverty alleviation. The energy-related goals set in the PARPA are being operationalised by GoM through a number of strategies, investments and studies that have been prepared or are under way. The PARPA II (§507ff) outlines a programme for the energy sector, which entails: Electrification, Liquid Fuels, Renewable Energy, and Intersectoral Collaboration.<br/>
 +
 
 +
<br/>
 +
 
 +
<u>The Energy Policy approved March 3rd 1998 by the Council of Ministers under Resolution 5/98 established with the following objectives among others relevant for ENDEV MOZAMBIQUE.:</u>
 +
 
 +
*Guarantee reliable supply of energy, at lowest possible cost, in order to meet present demand and future levels based on economic development trajectories,
 +
*Increase the energy options available for household consumption,
 +
*Secure better efficiency in energy utilization,
 +
*Promote the development of environmentally friendly conversion technologies, namely hydro, solar, wind and biomass,
 +
*Promote competitive, dynamic and more efficient entrepreneurs.
 +
 
 +
<br/>
 +
 
 +
<u>In March 2009 the Policy for Renewables was defined with the following objectives among others with relevance for ENDEV MOZAMBIQUE:</u>
 +
 
 +
*Increase the access to modern energy services of high quality and accessible prices,
 +
*Reduce poverty and contribute to the Millennium Development Goals,
 +
*Contribute to the generation of local and national income and employment.
 +
 
 +
<br/>
 +
 
 +
The revised Energy Strategy aims to align Mozambique with best international practices for efficient energy utilization, raising awareness amongst its citizens about good environmental practices, diversifying the energy supply matrix, giving particular emphasis to new and renewable sources of energy and to the opportunities contained within the Clean Development Mechanisms, under the Kyoto Protocol. It should ensure energy availability to sustainably meet the requirements of national socio-economic development by undertaking the necessary actions to increase access to diversified energy sources in a sustainable way, contributing to the welfare of the population and the country‘s socio-economic development. The strategy recognizes accelerating electrification efforts, giving priority to rural areas, through the expansion and intensification of the national grid, the utilization of Renewables, the optimization of low cost solutions, and the introduction of measures which will ensure productive and efficient use of electricity (as low consumption/high efficiency light bulbs). The GoM aims to support regional integration and reflects in its national legal framework the best practices in environmental protection. Mozambique has its own Oil Law and Electricity Law. A Regulation defines the licensing of electricity installations, another Regulation establishes the competencies and procedures regarding concessioning of production, transmission, distribution and marketing of electricity, as well as its importation and exportation. Other regulations establish the norms for the national grid, the instructions for CNELEC and its regulatory functions, and the Technical Unit for Implementation of Hydroelectric Projects (UTIP). Based on the new Energy Sector Strategy with its specific subsectors of Electrical Energy and New and Renewable Energies, as well as the Energy Strategic Plan 2009 – 2013, the GoM has prepared a comprehensive 5-year plan for energy development and access. In the current government’s 5-year plan (2015-2019) increased access to electricity appears as one of the strategic objectives. Mozambique’s target is to provide electricity access to 50% of the population by 2023. Rural electrification is planned to be increased using both the national grid and household solar systems. A special focus lies on the electrification of health centres through PV solutions. Also the construction of 12 mini hydropower plants is foreseen.&nbsp;The 5-year plan does not make any mention of biomass related energy issues.<br/>
 +
 
 +
<br/>
 +
 
 +
ENDEV MOZAMBIQUE is fully aligned and consistent with this plan, with PARPA and with the new sector strategy. ENDEV MOZAMBIQUE will specifically support: (i) grid densification by scaling-up electricity connections in peri-urban areas; (ii) promote market development for renewable energy technologies for household lighting and social infrastructure; and (iii) technology transfer and capacity building for the main implementing partners mainly, but not exclusively of the private sector.<br/>
 +
 
 +
[[Mozambique Energy Situation#toc|►Go to Top]]
 +
 
 +
<br/>
 +
 
 +
= Institutional Set-up in the Energy Sector<br/> =
 +
 
 +
<u>The public sector is represented by:</u>
 +
 
 +
*The [http://www.mireme.gov.mz/ Ministry of Mineral Resources and Energy (MIREME) FUNAE] was created in 2015 after elections by merging the former Ministry of Energy with the Ministry of Mineral Resources. The Ministry consists of four directorates: Mines and Geology, Hydrocarbons and Fuels, Energy and Planning and Cooperation. In the energy sector MIREME is responsible for national energy planning and policy formulation and for overseeing the operation and development of the energy sector. MIREME is represented in the provinces through the Provincial Directorates of Mineral Resources and Energy (DIPREME).<br/>
 +
*Electricidade de Moçambique (EdM), is a vertically-integrated, government-owned electric utility responsible for generation, transmission and distribution of electricity in the national grid. EdM buys most of its power supply (apr. 400 MW) from Hidroelectrica de Cahora Bassa (HCB), owner and operator of the Cahora Bassa hydro power plant on the Zambezi (2,075 MW). The GoM owns 82 percent of HCB which operates as an Independent Power Producer (IPP) The bulk of the electricity generated at HCB is exported to South Africa, with a small amount to Zimbabwe. EdM sells any excess electricity on the Southern Africa Short Term Energy Market. The Mozambique transmission grid is currently interconnected with South Africa, Zimbabwe and Swaziland.
 +
*The [http://www.funae.co.mz/index.php?option=com_content&view=article&id=46&Itemid=27&lang=en Fundo Nacional de Energia] (FUNAE) was established in 1997 as a public institution to promote rural electrification and rural access to modern energy services, in a sustainable manner, and as a contributor to economic and social development in the country. Since its establishment FUNAE has implemented numerous projects using renewable energy technologies to electrify schools, clinics and communities.<br/>
 +
*The Conselho Nacional de Electricidade (CNELEC) was re-established as an independent advisory regulatory body for the electricity sector in early 2008 with support from the World Bank Energy Reform and Access Project (ERAP). CNELEC was instructed to give its highest priority to an evaluation of EDM‘s performance under its Performance Contract with the GoM. This Performance Contract covers the years 2007 to 2009 and sets out the goals and indicators to be met annually by EDM and GoM. CNELEC was also instructed to conduct a review of the current methodology used by EDM in setting tariffs. In performing the review of EDM‘s performance, the directive instructed CNELEC to conduct its review in an open and transparent manner with public hearings in several locations throughout the country.
 +
*The private sector is represented by various licensed private enterprises which participate in the grid extension and household connection works of EdM and private enterprises for the provision and installation of PV products, often situated exclusively in the capital Maputo. A microfinance sector with banks and NGOs is active throughout the country but often exclusively restricted to the province and/or district capitals. The NGO sector is characterized by relatively weak institutional profiles and technical specialisation, as well as weak implementation structures and technical competences.
 +
 
 +
[[Mozambique Energy Situation#toc|►Go to Top]]
 +
 
 +
<br/>
 +
 
 +
 
 +
= Major Donor Activities =
 +
 
 +
The World Bank is one of the main donors in the energy sector in Mozambique. Since July 2007, it has served as co-chair with the GoM on the ―Energy Sector Working Group‖ that was established within the framework of the Paris Declaration. The Bank is in preparation of the second phase of the '''Energy Reform and Access Project (ERAP)''', which will now be called '''Energy Development and Access Programme (EDAP).''' The proposed project will help establish the necessary operational framework for increasing electricity access to un-electrified areas nationally in a sustainable and programmatic manner, aiming at mainstreaming a sector-wide approach (SWAp) by establishing a comprehensive donor partnership framework for coordinated and sustained financing of investment and capacity strengthening aligned with national priorities and procedures (WB, ADB, ADF, OFID, BADEA, IsDB, Kuweit Fund) With Norway, the World Bank is also co-financing the Mozambique- Malawi Transmission Interconnection Project (cancelled medio 2010) and the Mozambique Regional Transmission Backbone Project. Sweden is engaged together with co-financing of Norway and Denmark in rural electrification (grid extension and household connections) in Sofala, Manica, Tete and Niassa Provinces. Norway is financing rural electrification in Cabo Delgado and grid extension in Gurue - Cuamba – Lichinga and Namacurra – Pebane. '''Technical assistance (TA)''' and capacity development for EdM in mega project development for power generation, as well as for the MoE are delivered by Norway and Sweden. Sweden also is embarking on the rehabilitation of the hydro power stations in Mavuzi and Chicamba. The '''European Commission (EC)''' is financing rural electrification in Cabo Delgado, Tete and Sofala with EdM, PV electrification in rural areas with FUNAE and capacity building in energy planning and management for the MoE. DFID is giving TA on Biofuels to the National Directorate of Renewable Energy of the MoE.<br/>
 +
 
 +
In April 2019,&nbsp;World Bank approved a USD 82 million energy grant to Mozambique to increase access to electricity in the peri-urban and rural areas, expand the existing grid network and promote the use of off-grid energy solutions in areas where grid expansion is not feasible.This project is also supported by a USD 55 million Multi-Donor Trust Fund, also admisitered by the World bank. The project will focus on the northern provinces of Niassa, Nampula and Cabo Delgado, and Zambezia and Sofala in the centre of the country. It also aims to contribute towards the Mozambique government’s Energy for All project.
 +
 
 +
<br/>
 +
 
 +
Belgium had an energy program with the Ministry of Energy trough FUNAE, from September 2010 up to December 2016. The program focused on off-grid energy systems, based on renewable energy resources (hydraulic, solar and wind), in remote rural areas where no grid connection is foreseen within the next five years. The program was financed, on grant basis, electrification systems for community infrastructures such as administrative buildings, schools, health centres, water pumping devices and public lighting. In 2017 a new program has to start, worth a grant of 12 million euro, with the same partner FUNAE, including renewable energy installations for private use (household, shops or small enterprises) to be stimulated by subsidies (investment funds) and soft loans through micro-finance systems. In order to increase the sustainability of the renewable energy installations, the program will also provide a computerized asset management system and technical assistance focused on capacity building through training initiatives, research and development.&nbsp;<br/>
 +
 
 +
Considering the large area of the country and the dispersed population in the rural areas, a geographical concentration and/or clustering of the activities will be essential for the follow-up and the cost-effectiveness of the activities. As the provinces of Manica, Tete, Zambezia and Nyassa have a high potential for small hydropower, the possibility of concentrating activities in these four provinces will be investigated.<br/><br/>ENDEV MOZAMBIQUE coordinates its activities with the EDAP and Belgian Programs in close cooperation with FUNAE and government structures both central and in the province, as there will be several common intervention areas such as grid densification, PV electrification of social infrastructure and market development of PV systems for households. The ENDEV MOZAMBIQUE activities are in line with the capacity development needs of the implementing partners of the private sector, NGOs, communities and local entrepreneurs, which will receive business development services and will be trained on the job during the implementation of the activities in the PV and hydro power components.
 +
 
 +
 
 +
 
 +
[https://brilhomoz.com/ SNV's BRILHO program] is a five year programme running from 2019-2024 and aims to support the Mozambique's off grid energy makert and support technologies such as Improved Cooking Solutions, Solar Home Systems and Green Mini-grids. It expects to support 8 GMGs with total funding of GBP 2.2 million<ref>5 years on from the launch of Green Mini-Grids Africa – what’s been achieved, and what have we learned? May 2020 https://minigrids.org/5-years-on-from-the-launch-of-green-mini-grids-africa-whats-been-achieved-and-what-have-we-learned/</ref>. <br/><br/>
 +
 
 +
[[Mozambique Energy Situation#toc|►Go to Top]]
 +
 
 +
<br/>
 +
 
 +
 
 +
= Further Information =
 +
 
 +
*[[EN-Access to Modern Energy Services Mozambique -Peter Adelmann|EN-Access to Modern Energy Services Mozambique -Peter Adelmann]]
 +
*[[EN-Africa Energy Unit(AFTEG)-World Bank|EN-Africa Energy Unit(AFTEG)-World Bank]]
 +
*USAID Power Africa: [https://www.usaid.gov/sites/default/files/documents/1860/Mozambique_-_November_2018_Country_Fact_Sheet.pdf Mozambique Factsheet]
 +
 
 +
<br/>
 +
 
 +
= References =
 +
 
 +
<references />
 +
 
 +
[[Mozambique Energy Situation#toc|►Go to Top]]

Revision as of 13:52, 8 June 2020


Mozambique
Flag of Mozambique.png
Location _______.png

Capital:

Maputo

Region:

Coordinates:

25.9500° S, 32.5833° E

Total Area (km²): It includes a country's total area, including areas under inland bodies of water and some coastal waterways.

799,380

Population: It is based on the de facto definition of population, which counts all residents regardless of legal status or citizenship--except for refugees not permanently settled in the country of asylum, who are generally considered part of the population of their country of origin.

32,969,518 (2022)

Rural Population (% of total population): It refers to people living in rural areas as defined by national statistical offices. It is calculated as the difference between total population and urban population.

62 (2022)

GDP (current US$): It is the sum of gross value added by all resident producers in the economy plus any product taxes and minus any subsidies not included in the value of the products. It is calculated without making deductions for depreciation of fabricated assets or for depletion and degradation of natural resources.

18,406,835,955 (2022)

GDP Per Capita (current US$): It is gross domestic product divided by midyear population

558.30 (2022)

Access to Electricity (% of population): It is the percentage of population with access to electricity.

31.49 (2021)

Energy Imports Net (% of energy use): It is estimated as energy use less production, both measured in oil equivalents. A negative value indicates that the country is a net exporter. Energy use refers to use of primary energy before transformation to other end-use fuels, which is equal to indigenous production plus imports and stock changes, minus exports and fuels supplied to ships and aircraft engaged in international transport.

-54.60 (2014)

Fossil Fuel Energy Consumption (% of total): It comprises coal, oil, petroleum, and natural gas products.

12.62 (2014)

Source: World Bank




Introduction

Mozambique is one of the poorest countries of the world with a population of 28.8 million people and almost 70% of the population living on less than USD 1.90 per day (2016). The Human Development Index (HDI) 2016 ranks Mozambique 181 out of 188 countries - dropping down from 180 in 2015.  As household budget survey conducted by the Mozambican government in 2016 reveals that the rural-urban gap and income disparity have considerably increased since 2010.

 Mozambique has undertaken significant efforts in recent years in electrifying the country. The electrification rate has increased from 5% in 2001 to 26% in 2016. However, access to electricity remains low and is mainly focused on urban areas. The vast majority (70%) of Mozambique’s population lives in rural areas of which only 5.7% use electricity for lighting. Forest resources satisfy more than 85% of total domestic energy requirements, in rural areas even over 95%. Although also used for lighting, biomass is mainly used for cooking. The great majority of households uses inefficient cooking technologies such as three-stone fire and traditional stoves.

The national grid including off grid facilities is claimed to reach some 30 % of the country today in terms of numbers of people with potential access to the grid (not connected). Many district capitals depend on expensive and often unreliable power generation with diesel generators. Outside these towns, the situation is even worse. The overwhelming majority of rural households, most rural schools, health centres and administrative posts are without access to electricity. Lack of mechanical power is a bottleneck for the rural subsistance agricultural production, as grain producers have to walk long distances to the nearest milling facility. Rural areas lack electricity for lighting, radio and communication in households and for refrigeration in small commerce. Nevertheless, many rural household spend a considerable share of their income for modern energy in the form of kerosene or batteries (€ 4–5 per month). Lack of access to electricity restricts the local population’s opportunities for income-generating activities.
The energy sector is key to the country's economy already today, since energy exports make up a large share of total foreign exchange earnings. Moreover, the availability of cheap electricity is one of the main reasons for the significant foreign direct investment in energy-intensive industries in Mozambique. Energy exports (hydropower, coal, gas and possibly oil) and projects to cover the growing domestic electricity demand will play an increasingly important role in the years to come. The liberalisation of the power sector initiated in 1997 allowed for third parties from the private sector to enter the power generation, transmission and distribution markets without impressive results so far (2012).



►Go to Top

Potentials

Mozambique has considerable energy resources with an estimated hydropower potential of 12,000 MW and also gas reserves (estimated at reaching 700 billion cubic metres) and vast coal reserves (estimated to reach 140 million TJ) with the potential of generating approx. 500 MW and 5,000 MW respectively.

►Go to Top


Renewable Energy Potential

Resource Availability
Wind Along the cost Niassa (Average wind speed 6 m/s)
Solar 4.5-7 kWh/m2/day
Hydro 12 GW (1 GW in small installations up to 10 MW)
Biomass 100's of MW (Big bagasse potential)

►Go to Top


Demand and Supply

Peak electricity demand was 530 MW in 2010 (without Mozal) with an energy consumption of approximately 3,032 GWh. The increase in power consumption has been significant during recent years with average annual increases in the order of 6 to 8 % over the last 10 years. These figures reflect supply to domestic, commercial and industrial consumers in the national power network supplied by Electricidade de Moçambique (EdM) the national power company. Approx. 136 MW (61 MW from hydro and 75 MW from diesel and gas) are supplied by EdM's own generation, mainly by ageing plants requiring refurbishment. The remaining demand is supplied through a purchase agreement with Cahora Bassa, a hydropower plant at the Zambezi River with an installed capacity of 2,075 MW. The number of consumers has grown with more than 10% annually since the year 2000 and was about 850,000 in 2010 (2,240 Medium & High Voltage clients). At present still only 16% of the population has access to electricity. Power demand forecasts indicate that with an average projected growth rate of 6% p.a. Mozambique will reach a maximum demand of 1,350 MW by 2030 and a projected consumption of 8,300 GWh. From 2009 until 2013, it is foreseen that demand reach 560 MW by 2013. For meeting the country‘s electricity needs in a timely manner, it is imperative given that the Cahora Bassa‘s reserve for domestic market requirements of 400 MW is almost exhausted. Therefore it is important that the HEP sites Mavuzi, Chicamba, Corumana are rehabilitated and that the technical and economical feasb. HEP sites Tsate, Mueneze, Alto Malema, Massingir and Mavuzi II and III are errected and the retrofit of the MTC Maputo Gas Turbine. These investments would sum to approx. 415 MW ICap and approx. 300 MW additional firm power. Several large scale IPPs, mainly for export purposes, are planned (totalling ca. 3 to 5 GW).


Biomass coming from an estimated 30.6 million hectares of forest lands for wood fuel and charcoal represents about 80% of the total energy consumed by the households. This value is even bigger in remote rural areas. Every year it is estimated that 16,000,000 m3 of forestry resources are burnt to meet rural energy requirements.


The present consumption of oil products is in the order of 600 million litres per year, transport being the lead user followed by agriculture. The turbulence in international oil markets since 2004 resulting in abrupt fluctuations of oil prices have become a source of social unrest. The reduction of the Mozambican energy bill, especially for imports of liquid fossil fuels, which in 2006 amounted to 14% of national imports, deserves special attention. Today both liquid pe-troleum gas (LPG) and kerosene have only a small impact in terms of the national energy ba-lance. LPG is mainly used in the urban centres of Maputo, Matola, Beira and Nampula. How-ever due to bottlenecks in supplies the national consumption does not exceed 14,000 tons.


Mozambique´s considerable energy resources enable the country to meet its internal demand and still export energy to Southern and East African countries. The availability of energy resources including hydro, natural gas and coal, plus the geographical positioning of the country – acting both as route to the countries inland well served by harbours, railway and pipeline systems, and as an interface between the Southern African Development Community (SADC) and the Eastern African Community (EAC) gives Mozambique a privileged, strategic position and role in the regional energy sector.


However despite the countries significant electric power potential there should be no rapid shift expected from biomass to electricity use because Mozambique is a vast country with the majority of the population living in rural communities dispersed throughout the provinces. Energy solutions must take into consideration this reality and adapt to it by combining an intensification of electrification in those areas served by the national electricity grid and the adoption of modern technological solutions and energy services in particular for remote areas, using sustainable biomass, solar and hydropower resources.

►Go to Top


Noteworthy Trends

Despite its large renewable energy resources, the country energy sector focus is on large hydro projects in the Zambezi Basin (i.e. Mphanda Nkuwa) to produce power for export to South Africa and for industry. Mozambique relies heavily on the export of commercial electricity to South Africa from the Cahora Bassa dam on the Zambezi River to generate foreign exchange income.

The two immediate projects are the 850 MW (nominal) expansion of the Cahora Bassa dam and the controversial Mphanda Nkuwa dam (2500 MW). See table below.


Project Name Type of Project

Size

Comments

CB North Bank Hydropower expansion

850 to 1300 additional MW

Detailed feasibility study is underway

Mphanda Nkuwa Hydropower

2500 MW

Env. + Soc. Impact Study underway

Massingir Hydropower

40 MW

EDM managed

Lurio Hydropower

120 MW


Majawa Hydropower

25 MW


Malema Hydropower

60 MW


Moatize Coal fired power plant

1500 MW

IES is the developer

Temane Combined Cycle natural gas fired power plant

300-400 MW

On the SASOL gaspipeline. 2010


As a result of March 2009 Government policy, the biofuels sector is receiving hundreds of millions of dollars in investment (sugar – ethanol, jatropha --- biodiesel).However, production has yet to commence and there is considerable controversy about transparency and food vs. energy.

►Go to Top


Market Situation

The market situation for photovoltaic (PV) and hydro power technologies and services is still in a very incipient stage. In the case of micro and pico hydro there are no readily available products available in the country which makes prices prohibitive for communities and individual households. However there is a good potential for local manufacture of water wheels and pico turbines, although the market is still very limited and therefore local services tend to be rather expensive.


In its first phase, ENDEV MOZAMBIQUE has started pioneer activities in the local manufacture of water wheels for upgrading traditional maize mills and the manufacture of pico turbines with most promising results. Therefore it is envisaged to upscale micro/pico hydro power activities sustainably on a local level with an appropriate and cost effective approach for technical capacity building, technology transfer and market development. The market for PV is divided into steadily growing local market spots and mainly capital based PV providers working with directly imported equipment for government projects funded by donors. The local market is efficient and reliable but informal, with low quality products of Chinese origin coming mainly from RSA. Market actors are lacking technical knowledge. In parallel to the dissemination of products from the local market ENDEV MOZAMBIQUE has started designing an energy efficient compact small solar home system (SSHS) with a local enterprise. In the case of PV for household lighting, technical capacity building, technology transfer and market development is envisaged within a Public Private Partnership (PPP) measure with German enterprises and higher quality products.


In addition to the overarching need for developing the countries extensive energy resources (hydro, coal, gas and biomass) for both domestic and regional consumption the main challenges in the power sector in Mozambique are:

  • Ensuring that affordable electricity supply is available to meet the rapidly growing domestic demand. In the near term, this will involve the continued extension of the grid with a focus on loss reduction and intensification of the grid,
  • Reaching the vast areas of the country beyond the national grid managed by EdM. The GoM is committed to supporting decentralized electrification of social infrastructure (rural schools, clinics and administrative offices) and to increase access to modern energy services to villages and rural enterprises through PV systems, micro/pico-hydro schemes, modern biomass energy, and other Renewable Energy Technologies (RETs),
  • Ensuring that power shortages do not become a constraint on economic growth. Several GoM proposed generation and transmission ―mega-projects‖ will address sufficiency and security of supply for the medium to long-term,
  • Institutional strengthening and capacity development of the main sector public institutions (MoE, EdM, FUNAE and CNELEC) but also of the private sector composed of NGOs, MFIs, and local enterprises working with RETs, in order to improve their respective performance, governance and effectiveness.


Cumulative capacity, by technology:

  1. Wind: NONE
  2. Solar PV: NO GRID CONNECT. SMALL OFF GRID MARKET.
  3. CSP: NONE
  4. Solar thermal:Very small household and tourism market
  5. Geothermal: NONE.
  6. Bioenergy (heat and/or power): 5-10 MW in 5 sugar refineries (Self consumed)
  7. Hydropower: 2,075 MW Cahora Bassa dam dominates the energy sector.This is owned by Hidroelectrica de Cahora Bassa (HCB), whose assets are 85% owned by the Mozambique government.
    160 MW, mostly of hydropower, is managed by Electricidade de Mozambique (EDM)

Biofuels production data – for both ethanol and biodiesel.
A National Policy and Strategy for Biofuels was approved in February 2009 which focuses on ethanol from sugarcane and sorghum and coconut and jatropha for biodiesel. This policy has led to hundreds of millions of dollars in investment plans in ethanol and biodiesel in Mozambique. In October 2007 ethanol plant in Mozambique received US$510 million in support from the UK. However, the actual on-the-ground activity is unclear and production has yet to commence. Biofuels are not readily available in the country and export details are also not available[1].

  1. Marine energy (specify technology) NONE

►Go to Top


Key Problems of the Energy Sector

Power Africa states that Mozambique's energy sector's most challenging issues are as follows[2]:

  • Public Finances/Macro-economic issues
  • Lacking credible utility and cost-reflective tariff
  • Lack of strong, transparent regulator


Policy Framework, Laws and Regulations

The legal framework relating to energy in Mozambique is composed of a variety of policies, strategies and regulations, the most important ones being the energy strategy (2009), the policy for the development of new and renewable energies 2011-2025 (2011), the strategy of the conversation and sustainable use of biomass energy (2013), the strategy of biofuels (2009), the regulation of biofuels and their mixture and the regulation that established the feed in tariff for new and renewable energies - REFIT (2014).


Within PARPA (PRSP), the programme for reduction and alleviation of absolute poverty, the GoM has been granting high priority to efforts to increase access to electricity for the population. Within the PARPA II the GoM has affirmed the critical role of the energy sector in reducing poverty. Adequate and equitable access to energy resources and services such as the provision of energy services to households, rural schools, administrative offices, and hospitals in rural areas is defined as a key driver of growth and poverty alleviation. The energy-related goals set in the PARPA are being operationalised by GoM through a number of strategies, investments and studies that have been prepared or are under way. The PARPA II (§507ff) outlines a programme for the energy sector, which entails: Electrification, Liquid Fuels, Renewable Energy, and Intersectoral Collaboration.


The Energy Policy approved March 3rd 1998 by the Council of Ministers under Resolution 5/98 established with the following objectives among others relevant for ENDEV MOZAMBIQUE.:

  • Guarantee reliable supply of energy, at lowest possible cost, in order to meet present demand and future levels based on economic development trajectories,
  • Increase the energy options available for household consumption,
  • Secure better efficiency in energy utilization,
  • Promote the development of environmentally friendly conversion technologies, namely hydro, solar, wind and biomass,
  • Promote competitive, dynamic and more efficient entrepreneurs.


In March 2009 the Policy for Renewables was defined with the following objectives among others with relevance for ENDEV MOZAMBIQUE:

  • Increase the access to modern energy services of high quality and accessible prices,
  • Reduce poverty and contribute to the Millennium Development Goals,
  • Contribute to the generation of local and national income and employment.


The revised Energy Strategy aims to align Mozambique with best international practices for efficient energy utilization, raising awareness amongst its citizens about good environmental practices, diversifying the energy supply matrix, giving particular emphasis to new and renewable sources of energy and to the opportunities contained within the Clean Development Mechanisms, under the Kyoto Protocol. It should ensure energy availability to sustainably meet the requirements of national socio-economic development by undertaking the necessary actions to increase access to diversified energy sources in a sustainable way, contributing to the welfare of the population and the country‘s socio-economic development. The strategy recognizes accelerating electrification efforts, giving priority to rural areas, through the expansion and intensification of the national grid, the utilization of Renewables, the optimization of low cost solutions, and the introduction of measures which will ensure productive and efficient use of electricity (as low consumption/high efficiency light bulbs). The GoM aims to support regional integration and reflects in its national legal framework the best practices in environmental protection. Mozambique has its own Oil Law and Electricity Law. A Regulation defines the licensing of electricity installations, another Regulation establishes the competencies and procedures regarding concessioning of production, transmission, distribution and marketing of electricity, as well as its importation and exportation. Other regulations establish the norms for the national grid, the instructions for CNELEC and its regulatory functions, and the Technical Unit for Implementation of Hydroelectric Projects (UTIP). Based on the new Energy Sector Strategy with its specific subsectors of Electrical Energy and New and Renewable Energies, as well as the Energy Strategic Plan 2009 – 2013, the GoM has prepared a comprehensive 5-year plan for energy development and access. In the current government’s 5-year plan (2015-2019) increased access to electricity appears as one of the strategic objectives. Mozambique’s target is to provide electricity access to 50% of the population by 2023. Rural electrification is planned to be increased using both the national grid and household solar systems. A special focus lies on the electrification of health centres through PV solutions. Also the construction of 12 mini hydropower plants is foreseen. The 5-year plan does not make any mention of biomass related energy issues.


ENDEV MOZAMBIQUE is fully aligned and consistent with this plan, with PARPA and with the new sector strategy. ENDEV MOZAMBIQUE will specifically support: (i) grid densification by scaling-up electricity connections in peri-urban areas; (ii) promote market development for renewable energy technologies for household lighting and social infrastructure; and (iii) technology transfer and capacity building for the main implementing partners mainly, but not exclusively of the private sector.

►Go to Top


Institutional Set-up in the Energy Sector

The public sector is represented by:

  • The Ministry of Mineral Resources and Energy (MIREME) FUNAE was created in 2015 after elections by merging the former Ministry of Energy with the Ministry of Mineral Resources. The Ministry consists of four directorates: Mines and Geology, Hydrocarbons and Fuels, Energy and Planning and Cooperation. In the energy sector MIREME is responsible for national energy planning and policy formulation and for overseeing the operation and development of the energy sector. MIREME is represented in the provinces through the Provincial Directorates of Mineral Resources and Energy (DIPREME).
  • Electricidade de Moçambique (EdM), is a vertically-integrated, government-owned electric utility responsible for generation, transmission and distribution of electricity in the national grid. EdM buys most of its power supply (apr. 400 MW) from Hidroelectrica de Cahora Bassa (HCB), owner and operator of the Cahora Bassa hydro power plant on the Zambezi (2,075 MW). The GoM owns 82 percent of HCB which operates as an Independent Power Producer (IPP) The bulk of the electricity generated at HCB is exported to South Africa, with a small amount to Zimbabwe. EdM sells any excess electricity on the Southern Africa Short Term Energy Market. The Mozambique transmission grid is currently interconnected with South Africa, Zimbabwe and Swaziland.
  • The Fundo Nacional de Energia (FUNAE) was established in 1997 as a public institution to promote rural electrification and rural access to modern energy services, in a sustainable manner, and as a contributor to economic and social development in the country. Since its establishment FUNAE has implemented numerous projects using renewable energy technologies to electrify schools, clinics and communities.
  • The Conselho Nacional de Electricidade (CNELEC) was re-established as an independent advisory regulatory body for the electricity sector in early 2008 with support from the World Bank Energy Reform and Access Project (ERAP). CNELEC was instructed to give its highest priority to an evaluation of EDM‘s performance under its Performance Contract with the GoM. This Performance Contract covers the years 2007 to 2009 and sets out the goals and indicators to be met annually by EDM and GoM. CNELEC was also instructed to conduct a review of the current methodology used by EDM in setting tariffs. In performing the review of EDM‘s performance, the directive instructed CNELEC to conduct its review in an open and transparent manner with public hearings in several locations throughout the country.
  • The private sector is represented by various licensed private enterprises which participate in the grid extension and household connection works of EdM and private enterprises for the provision and installation of PV products, often situated exclusively in the capital Maputo. A microfinance sector with banks and NGOs is active throughout the country but often exclusively restricted to the province and/or district capitals. The NGO sector is characterized by relatively weak institutional profiles and technical specialisation, as well as weak implementation structures and technical competences.

►Go to Top



Major Donor Activities

The World Bank is one of the main donors in the energy sector in Mozambique. Since July 2007, it has served as co-chair with the GoM on the ―Energy Sector Working Group‖ that was established within the framework of the Paris Declaration. The Bank is in preparation of the second phase of the Energy Reform and Access Project (ERAP), which will now be called Energy Development and Access Programme (EDAP). The proposed project will help establish the necessary operational framework for increasing electricity access to un-electrified areas nationally in a sustainable and programmatic manner, aiming at mainstreaming a sector-wide approach (SWAp) by establishing a comprehensive donor partnership framework for coordinated and sustained financing of investment and capacity strengthening aligned with national priorities and procedures (WB, ADB, ADF, OFID, BADEA, IsDB, Kuweit Fund) With Norway, the World Bank is also co-financing the Mozambique- Malawi Transmission Interconnection Project (cancelled medio 2010) and the Mozambique Regional Transmission Backbone Project. Sweden is engaged together with co-financing of Norway and Denmark in rural electrification (grid extension and household connections) in Sofala, Manica, Tete and Niassa Provinces. Norway is financing rural electrification in Cabo Delgado and grid extension in Gurue - Cuamba – Lichinga and Namacurra – Pebane. Technical assistance (TA) and capacity development for EdM in mega project development for power generation, as well as for the MoE are delivered by Norway and Sweden. Sweden also is embarking on the rehabilitation of the hydro power stations in Mavuzi and Chicamba. The European Commission (EC) is financing rural electrification in Cabo Delgado, Tete and Sofala with EdM, PV electrification in rural areas with FUNAE and capacity building in energy planning and management for the MoE. DFID is giving TA on Biofuels to the National Directorate of Renewable Energy of the MoE.

In April 2019, World Bank approved a USD 82 million energy grant to Mozambique to increase access to electricity in the peri-urban and rural areas, expand the existing grid network and promote the use of off-grid energy solutions in areas where grid expansion is not feasible.This project is also supported by a USD 55 million Multi-Donor Trust Fund, also admisitered by the World bank. The project will focus on the northern provinces of Niassa, Nampula and Cabo Delgado, and Zambezia and Sofala in the centre of the country. It also aims to contribute towards the Mozambique government’s Energy for All project.


Belgium had an energy program with the Ministry of Energy trough FUNAE, from September 2010 up to December 2016. The program focused on off-grid energy systems, based on renewable energy resources (hydraulic, solar and wind), in remote rural areas where no grid connection is foreseen within the next five years. The program was financed, on grant basis, electrification systems for community infrastructures such as administrative buildings, schools, health centres, water pumping devices and public lighting. In 2017 a new program has to start, worth a grant of 12 million euro, with the same partner FUNAE, including renewable energy installations for private use (household, shops or small enterprises) to be stimulated by subsidies (investment funds) and soft loans through micro-finance systems. In order to increase the sustainability of the renewable energy installations, the program will also provide a computerized asset management system and technical assistance focused on capacity building through training initiatives, research and development. 

Considering the large area of the country and the dispersed population in the rural areas, a geographical concentration and/or clustering of the activities will be essential for the follow-up and the cost-effectiveness of the activities. As the provinces of Manica, Tete, Zambezia and Nyassa have a high potential for small hydropower, the possibility of concentrating activities in these four provinces will be investigated.

ENDEV MOZAMBIQUE coordinates its activities with the EDAP and Belgian Programs in close cooperation with FUNAE and government structures both central and in the province, as there will be several common intervention areas such as grid densification, PV electrification of social infrastructure and market development of PV systems for households. The ENDEV MOZAMBIQUE activities are in line with the capacity development needs of the implementing partners of the private sector, NGOs, communities and local entrepreneurs, which will receive business development services and will be trained on the job during the implementation of the activities in the PV and hydro power components.


SNV's BRILHO program is a five year programme running from 2019-2024 and aims to support the Mozambique's off grid energy makert and support technologies such as Improved Cooking Solutions, Solar Home Systems and Green Mini-grids. It expects to support 8 GMGs with total funding of GBP 2.2 million[3].

►Go to Top



Further Information


References

  1. The biofuels sector, and especially the biodiesel sector, has attracted considerable investment. Hundreds of millions of dollars of investment has been made. Much of this has been in the sugar sector which is growing rapidly. At least 7 biodiesel/jatropha plantations have been set up with poor -- and controversial – results. (see Justica Ambiental!/Uniao Nacional de Camponeses, Jatropha: A Socio-economic pitfall for Mozambique. August 2009. http://ictsd.org/i/news/biores/45169/
  2. Power Africa. (2018). Mozambique Factsheet. Retrieved from: https://www.usaid.gov/sites/default/files/documents/1860/Mozambique_-_November_2018_Country_Fact_Sheet.pdf
  3. 5 years on from the launch of Green Mini-Grids Africa – what’s been achieved, and what have we learned? May 2020 https://minigrids.org/5-years-on-from-the-launch-of-green-mini-grids-africa-whats-been-achieved-and-what-have-we-learned/