Difference between revisions of "National Approaches to Electrification – Delivery Model"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
 
(22 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
[[File:Back to NAE Overview Page.png|center|800px|NAE Overview Page|alt=NAE Overview Page|link=National Approaches to Electrification – Review of Options]]
  
[[File:Back to NAE Overview Page.png|center|800px|NAE Overview Page|alt=NAE Overview Page|link=National Approaches to Electrification – Overview]]
+
{{NAE Delivery Model Page Banner}}
  
{{NAE Delivery Model Page Banner}}
+
<br/>
  
 
----
 
----
<p style="text-align: center;"><span style="color:#316798ff;">'''Delivery Model: The (market) chain of organisations through which electricity is delivered to users'''</span></p>
+
<p style="text-align: center"><span style="color:#316798ff">'''Delivery Model: The (market) chain of organisations through which electricity is delivered to users'''</span></p>
 
----
 
----
  
 
<br/>
 
<br/>
  
= Public Delivery Model<br/> =
+
= Public<br/> =
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 130px; background-color: rgb(0, 156, 204);" |  
+
| style="width: 130px; background-color: rgb(0, 156, 204)" |  
<span style="color:#FFFFFF;"><span style="font-size: 13.6px;">Definition:</span></span><br/>
+
<span style="color:#FFFFFF"><span style="font-size: 13.6px">Definition</span></span><br/>
  
| style="width: 618px;" |  
+
| style="width: 618px" |  
 
'''<span></span><span>Delivery of electricity access by an entity or entities all of which are publically owned and managed, using purely public finance.</span><span></span>'''
 
'''<span></span><span>Delivery of electricity access by an entity or entities all of which are publically owned and managed, using purely public finance.</span><span></span>'''
  
<span>In this delivery model all of the organisations engaged in provision of electricity access (whether through supply of electricity itself or provision of electricity systems), as part of the National Electrification Approach being considered, are state-owned. This implies that all the actors along the market chain1 (Project Development, Manufacture/Generation, Distribution and Retail) are publically owned. These may include electricity utilities, publically-owned generation, transmission and distribution companies, municipalities, or rural energy agencies.&nbsp;</span><span></span><br/>
+
<span>In this [[Delivery Models for Decentralised Rural Electrification|delivery model]] all of the organisations engaged in provision of electricity access (whether through supply of electricity itself or provision of electricity systems), as part of the National Electrification Approach being considered, are state-owned. This implies that all the actors along the market chain (Project Development, Manufacture/Generation, Distribution and Retail) are publically owned. These may include electricity utilities, publically-owned generation, transmission and distribution companies, municipalities, or rural energy agencies.&nbsp;</span><span></span><br/>
  
 
|}
 
|}
Line 26: Line 27:
 
<br/>
 
<br/>
  
== Internactions wiht other NAE Categories: ==
+
== Interactions with other NAE Categories ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 152, 203);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(0, 152, 203)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(0, 102, 0);" |  
+
| style="width: 117px; background-color: rgb(0, 102, 0)" |  
<font color="#ffffff">Technologies</font>
+
<font color="#ffffff">Technology</font>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" |  
+
| style="width: 616px" |  
<span style="color:#FFFFFF;"></span>National grid systems have most often been established under a public delivery model either through a single public electricity company owning and managing the entire system or through separate public generation, transmission and distribution companies. Grid-connected mini-grids and distribution systems may also be publically owned, for instance by a local municipality. Where isolated mini-grids or standalone systems are delivered through a public model this is generally by an electricity utility or distribution company which has adopted an integrated approach with electricity being provided using a combination of grid, mini-grid and standalone systems.<br/>
+
<span style="color:#FFFFFF"></span>[[Portal:Grid|National grid]] systems have most often been established under a public delivery model either through a single public electricity company owning and managing the entire system or through separate public generation, transmission and distribution companies. Grid-connected [[Portal:Mini-grid|mini-grids]] and distribution systems may also be publically owned, for instance by a local municipality. Where isolated mini-grids or standalone systems are delivered through a public model this is generally by an electricity utility or distribution company which has adopted an integrated approach with electricity being provided using a combination of grid, mini-grid and standalone systems.<br/>
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 152, 203);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(0, 152, 203)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(154, 103, 0);" |  
+
| style="width: 117px; background-color: rgb(154, 103, 0)" |  
<span style="color:#FFFFFF;"></span><span style="color:#FFFFFF;">Legual Basis</span><span style="color:#FFFFFF;"></span><br/>
+
<span style="color:#FFFFFF"></span><span style="color:#FFFFFF">Legal Basis</span><span style="color:#FFFFFF"></span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
 
Regulation of public delivery models is often implicit, with oversight and control being through organisational hierarchy rather than any explicit regulatory framework. For instance a national utility company’s monopoly (concession) over generation and/or sale of electricity may be established through the legislation under which it is created rather than through any separate framework. However, though an explicit regulatory framework may not be needed to give private investors confidence, such a framework is nevertheless regarded as best practice to achieve transparency and provide a barrier to political interference.
 
Regulation of public delivery models is often implicit, with oversight and control being through organisational hierarchy rather than any explicit regulatory framework. For instance a national utility company’s monopoly (concession) over generation and/or sale of electricity may be established through the legislation under which it is created rather than through any separate framework. However, though an explicit regulatory framework may not be needed to give private investors confidence, such a framework is nevertheless regarded as best practice to achieve transparency and provide a barrier to political interference.
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 152, 203);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(0, 152, 203)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(205, 52, 0);" |  
+
| style="width: 117px; background-color: rgb(205, 52, 0)" |  
<span style="color:#FFFFFF;"></span><span style="color:#FFFFFF;">Price/Tariff Regulation</span><span style="color:#FFFFFF;"></span><br/>
+
<span style="color:#FFFFFF"></span><span style="color:#FFFFFF">Price/Tariff Regulation</span><span style="color:#FFFFFF"></span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
 
<span>Where electricity is delivered through public models, with no need to attract private investment, there is also a temptation to manage prices by means of the organisational hierarchy. However, without independent regulation, there is a risk that political pressure will result in prices being depressed below cost-recovery levels leading to insolvency of the electricity providers and deterioration of the electricity provision.</span><span></span>
 
<span>Where electricity is delivered through public models, with no need to attract private investment, there is also a temptation to manage prices by means of the organisational hierarchy. However, without independent regulation, there is a risk that political pressure will result in prices being depressed below cost-recovery levels leading to insolvency of the electricity providers and deterioration of the electricity provision.</span><span></span>
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 152, 203);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(0, 152, 203)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(32, 56, 100);" |  
+
| style="width: 117px; background-color: rgb(32, 56, 100)" |  
<span style="color:#FFFFFF;">Finance</span><span style="color:#FFFFFF;"></span><br/>
+
<span style="color:#FFFFFF">Finance</span><span style="color:#FFFFFF"></span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
<span>By definition, a public delivery model will use public finance – by publically-owned utility companies or national or local government, potentially supported by loans and grants from international agencies - (since any private finance would cause the delivery model to be categorized as a public-private partnership). In addition public delivery models will draw on finance from users, through standalone system purchases, connection charges and ongoing charges, and for multi-user systems (grids and mini-grids) there is likely to be some element of cross-subsidy between users.</span><span></span>
+
<span>By definition, a public delivery model will use public [[Portal:Financing and Funding|finance]]– by publically-owned utility companies or national or local government, potentially supported by loans and grants from international agencies - (since any private finance would cause the delivery model to be categorized as a public-private partnership). In addition public delivery models will draw on finance from users, through standalone system purchases, connection charges and ongoing charges, and for multi-user systems ([[Portal:Grid|grids]]&nbsp;and [[Portal:Mini-grid|mini-grids]]) there is likely to be some element of cross-subsidy between users.</span><span></span>
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 152, 203);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(0, 152, 203)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(0, 100, 100);" |  
+
| style="width: 117px; background-color: rgb(0, 100, 100)" |  
<span style="color:#FFFFFF;"></span><span style="color:#FFFFFF;">Non-Financial Interventions</span><span style="color:#FFFFFF;"></span><br/>
+
<span style="color:#FFFFFF"></span><span style="color:#FFFFFF">Non-Financial Interventions</span><span style="color:#FFFFFF"></span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" |  
+
| style="width: 616px" |  
 
National energy planning is key to establishing the optimum mix of technologies to meet electrification needs across the country, regardless of the delivery model employed. Institutional restructuring and capacity building or technical assistance may be needed where the key actors involved in public delivery models lack capacity is aspects of electrification. Technology development/adoption and adoption of appropriate technical standards, user awareness raising and demand promotion may be needed to increase revenues and make electricity access economically sustainable, regardless of the delivery model chosen.
 
National energy planning is key to establishing the optimum mix of technologies to meet electrification needs across the country, regardless of the delivery model employed. Institutional restructuring and capacity building or technical assistance may be needed where the key actors involved in public delivery models lack capacity is aspects of electrification. Technology development/adoption and adoption of appropriate technical standards, user awareness raising and demand promotion may be needed to increase revenues and make electricity access economically sustainable, regardless of the delivery model chosen.
  
Line 83: Line 84:
 
<br/>
 
<br/>
  
== Advantages and Disadvantages (Including Level of Electricity Provided) ==
+
== Advantages and Disadvantages ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 152, 203);" | <br/>
+
| style="width: 10px; background-color: rgb(0, 152, 203)" | <br/>
 
|  
 
|  
A public delivery model has the advantage of making use of existing institutions. Where these organisations have strong capabilities and are efficient, a public delivery model may allow strongly focussed and effective delivery of electrification and good coordination of grid, mini-grid and stand-alone solutions. However public organisations are often monolithic and slow moving. They may be more focussed on managing existing assets than serving new consumers, particularly in remote rural areas, and they may lack the capabilities needed to deliver new forms of electricity access. They are also vulnerable to political pressure and interference, which can hamper electrification efforts and result in poor allocation of resources. Following a private sector or private-public partnership model can allow private sector finance and skills to be brought to bear and may achieve greater flexibility, speed and efficiency.
+
A public delivery model has the advantage of making use of existing institutions. Where these organisations have strong capabilities and are efficient, a public delivery model may allow strongly focused and effective delivery of electrification and good coordination of [[Portal:Grid|grid]], [[Portal:Mini-grid|mini-grid]] and stand-alone solutions. However public organisations are often monolithic and slow moving. They may be more focused on managing existing assets than serving new consumers, particularly in remote rural areas, and they may lack the capabilities needed to deliver new forms of electricity access. They are also vulnerable to political pressure and interference, which can hamper electrification efforts and result in poor allocation of resources. Following a private sector or private-public partnership model can allow private sector [[Portal:Financing and Funding|finance]]&nbsp;and skills to be brought to bear and may achieve greater flexibility, speed and efficiency.
  
 
|}
 
|}
Line 95: Line 96:
 
<br/>
 
<br/>
  
== Further Informaiton and Guidance ==
+
== Further Information and Guidance ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 128, 0);" | <br/>
+
| style="width: 10px; background-color: rgb(0, 152, 203)" | <br/>
 
|  
 
|  
*Barnes, D. (2007). The Challenge of Rural Electrification: Strategies for Developing Countries. Book Chapter&nbsp;[https://books.google.co.uk/books?id=iOBi17Pr3fIC&printsec=frontcover&source=gbs_ge_summary_r&cad=0 https://][https://books.google.co.uk/books?id=iOBi17Pr3fIC&printsec=frontcover&source=gbs_ge_summary_r&cad=0 books.google.co.uk/books?id=iOBi17Pr3fIC&printsec=frontcover&source=gbs_ge_summary_r&cad=0#v=onepage&q&f=false]
+
*Barnes, D. (2007). The Challenge of Rural Electrification: Strategies for Developing Countries. Book Chapter [https://books.google.co.uk/books?id=iOBi17Pr3fIC&printsec=frontcover&source=gbs_ge_summary_r&cad=0 https://][https://books.google.co.uk/books?id=iOBi17Pr3fIC&printsec=frontcover&source=gbs_ge_summary_r&cad=0 books.google.co.uk/books?id=iOBi17Pr3fIC&printsec=frontcover&source=gbs_ge_summary_r&cad=0#v=onepage&q&f=false]
*ESMAP&nbsp;(2005), Meeting the Challenge of Rural Electrification in Developing Nations: The Experience of Successful Programs&nbsp;[https://static.globalinnovationexchange.org/s3fs-public/asset/document/Meeting0the0Ch10Discussion0Version0.pdf?q3Tol9Bdn4yH4J43t3P9t3hq5lh6ZipT https://][https://static.globalinnovationexchange.org/s3fs-public/asset/document/Meeting0the0Ch10Discussion0Version0.pdf?q3Tol9Bdn4yH4J43t3P9t3hq5lh6ZipT static.globalinnovationexchange.org/s3fs-public/asset/document/Meeting0the0Ch10Discussion0Version0.pdf?q3Tol9Bdn4yH4J43t3P9t3hq5lh6ZipT]
+
*IEA, (2010), Comparative Study on Rural Electrification Policies in Emerging Economies [https://www.iea.org/publications/freepublications/publication/rural_elect.pdf https://www.iea.org/publications/freepublications/publication/rural_elect.pdf]
*IEA, (2010), Comparative Study on Rural Electrification Policies in Emerging Economies&nbsp;[https://www.iea.org/publications/freepublications/publication/rural_elect.pdf https://][https://www.iea.org/publications/freepublications/publication/rural_elect.pdf www.iea.org/publications/freepublications/publication/rural_elect.pdf]
+
*Vietnam. The World Bank, (2011). State and People, Central and Local, Working Together: The Vietnam Rural Electrification Experience. Washington. [http://documents.worldbank.org/curated/en/601001468027856008/Vietnam-State-and-people-central-and-local-working-together-the-rural-electrification-experience http://][http://documents.worldbank.org/curated/en/601001468027856008/Vietnam-State-and-people-central-and-local-working-together-the-rural-electrification-experience documents.worldbank.org/curated/en/601001468027856008/Vietnam-State-and-people-central-and-local-working-together-the-rural-electrification-experience]
*Kaundinya, D. P.,&nbsp;Balachandra, P., &&nbsp;Ravindranath, N. H. (2009). Grid-connected versus stand-alone energy systems for&nbsp; decentralized power—a review of literature. Renewable and Sustainable Energy Reviews, 13(8), 2041-2050&nbsp;[http://www.academia.edu/11422615/Grid-connected_versus_stand-alone_energy_systems_for_decentralized_power_A_review_of_literature http://][http://www.academia.edu/11422615/Grid-connected_versus_stand-alone_energy_systems_for_decentralized_power_A_review_of_literature www.academia.edu/11422615/Grid-connected_versus_stand-alone_energy_systems_for_decentralized_power_A_review_of_literature]
 
*Vietnam. The World Bank, (2011). State and People, Central and Local, Working Together: The Vietnam Rural Electrification Experience. Washington.&nbsp;[http://documents.worldbank.org/curated/en/601001468027856008/Vietnam-State-and-people-central-and-local-working-together-the-rural-electrification-experience http://][http://documents.worldbank.org/curated/en/601001468027856008/Vietnam-State-and-people-central-and-local-working-together-the-rural-electrification-experience documents.worldbank.org/curated/en/601001468027856008/Vietnam-State-and-people-central-and-local-working-together-the-rural-electrification-experience]
 
  
 
|}
 
|}
Line 111: Line 110:
 
<br/>
 
<br/>
  
== Relevante Case Studies: ==
+
== Relevant Case Studies ==
  
*[[NAE Case Study: Rwanda, Sector-Wide Approach to Planning|Rwanda, Sector-Wide Approach to Planning]]<br/>
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 +
|-
 +
| style="width: 10px;  background-color: rgb(0, 152, 203)" | <br/>
 +
|
 +
*[[NAE Case Study: Brazil, Luz para Todos (Light for All)|Brazil, Luz para Todos (Light for All)]]<br/>
 
*[[NAE Case Study: South Africa, Integrated National Electrification|South Africa, Integrated National Electrification]]<br/>
 
*[[NAE Case Study: South Africa, Integrated National Electrification|South Africa, Integrated National Electrification]]<br/>
 
*[[NAE Case Study: Tunisia, Low Cost Distribution Technology|Tunisia, Low Cost Distribution Technology]]<br/>
 
*[[NAE Case Study: Tunisia, Low Cost Distribution Technology|Tunisia, Low Cost Distribution Technology]]<br/>
 +
*[[NAE Case Study: Vietnam, Rapid Grid Expansion|Vietnam, Rapid Grid Expansion]]<br/>
 +
 +
|}
 +
 +
<br/>
 +
 +
{{Go to Top}}
  
 
<br/>
 
<br/>
  
= Grid-Connected Mini-Grids/Distributed System =
+
= Private (Non-Government) =
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 130px; background-color: rgb(0, 154, 0);" |  
+
| style="width: 130px; background-color: rgb(0, 204, 248)" |  
'''<span style="color:#FFFFFF;"><span style="font-size: 13.6px;">Definition:</span></span>'''<br/>
+
'''<span style="color:#FFFFFF"><span style="font-size: 13.6px">Definition</span></span>'''<br/>
  
| style="width: 618px;" |  
+
| style="width: 618px" |  
'''<span><span>An electricity system connected to, but owned and/or separately managed from, the main grid system which supplies electricity to users within a local area.</span></span>'''
+
'''<span><span></span></span><span><span>Delivery of electricity access by an entity or entities none of which are owned and managed by the state, using purely private finance.</span></span><span><span></span></span>'''
  
Grid-connected mini-grids and distribution systems exist at a wide range of scales from those supplying a few households to systems covering entire districts or regions. The term “grid-connected mini-grid” is most frequently used to refer to systems built around their own, usually small-scale (diesel, bioenergy, biomass, hydro, solar, wind or hybrid) generation and connected to the grid to allow import and export of electricity. While these include fossil-fuel based generation, technology advances combined with environmental concerns mean that policy-makers are increasingly focussing on encouraging Renewable Energy based generation. A “distribution system” generally refers to a larger system designed primarily to distribute electricity from the main grid system to users. However distribution systems often also include their own generation and there is no clear distinction between grid-connected mini-grids and distribution systems (and the term “grid-connected mini-grid” is used to refer to both in the description below). At the larger end of the scale, distribution systems may be closely integrated into the main grid system, and the distinction between electrification through grid extension and through grid-connected distribution system expansion is one of ownership and management rather than technology.<br/>Distribution systems generally use lower voltages than for transmission, but the specific boundary between the two varies from country to country. Separate ownership and management may allow grid-connected mini-grids to use lower voltages and lower-cost technologies than the main grid, but grid system technical requirements (and standards) will generally prevent the lowest capacity “skinny-grids” from becoming grid-connected.<br/>
+
In this model all of the organisations engaged in provision of electricity access (whether through supply of electricity itself or provision of electricity systems), as part of the National Electrification Approach being considered, are non-state-owned. This implies that all the actors along the market chain1 (Project Development, Manufacture/Generation, Distribution and Retail) are non-state entities such as private companies, cooperatives, social enterprises, community organisations or NGOs (all characterised for this purpose as “private” organisations).&nbsp;<br/>
  
 
|}
 
|}
Line 135: Line 145:
 
<br/>
 
<br/>
  
== Internactions wiht other NAE Categories: ==
+
== Interactions with other NAE Categories ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 155, 0);" | <br/>
+
| style="width: 10px; background-color: rgb(0, 204, 248)" | <br/>
| style="width: 117px; background-color: rgb(51, 103, 152);" |  
+
| style="width: 117px; background-color: rgb(0, 103, 0)" |  
<span style="color:#FFFFFF;">Delivery Model</span><br/>
+
<span style="color:#FFFFFF">Technology</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
Grid-connected mini-grids are often privately owned, but may be publically owned or combine both in a public-private partnership. Common models include:
+
Few, if any, national [[Portal:Grid|grid]]&nbsp;systems have been established through a private delivery model (though in many countries privatisation has been used to transfer them into private ownership and bring in private investment). Grid-connected [[Portal:Mini-grid|mini-grids]] and distribution systems have frequently been developed by private (non-state-owned) organisations. Where the grid system is also privately-owned, this constitutes a private model. (However, if the grid system is publically owned, and the mini-grid or distribution system uses electricity from the grid system, or the development draws on public grants, subsidies, loans, tax exemptions or guarantees, it constitutes a public-private partnership). The most frequently used models for delivery of standalone systems are private, through the involvement of state-organisations along the market chain, or use of funding from grants or subsidies provided by the state, donors or international agencies, may result in private-public partnerships.
 
 
*mini-grids owned by a private developer connected to the main grid;<br/>
 
*A private enterprise installing generation to meet its own power demand building a local distribution system and supply to other local users and the grid;&nbsp;&nbsp;&nbsp;&nbsp;<br/>
 
*A municipality or other local public entity operating a grid connected distribution system;<br/>
 
*A private company, or public-private partnership taking on operation of a section of the grid distribution system as part of a privatisation process.
 
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 155, 0);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(0, 204, 248)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(154, 103, 0);" |  
+
| style="width: 117px; background-color: rgb(154, 103, 0)" |  
<span style="color:#FFFFFF;">Legual Basis</span><br/>
+
<span style="color:#FFFFFF">Legal Basis</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
Larger grid-connected mini-grids will generally require monopoly concessions (because of the substantial investment required to establish and maintain the infrastructure). Even for smaller grid-connected mini-grids, some form of licensing will almost invariably be appropriate to assure investors that they have the right to sell electricity (both to users and the grid), to ensure that technical standards for grid connection are met, and as the means of regulating prices for export and import of electricity from the grid and sale of electricity to users (see price/tariff regulation).&nbsp;<br/>
+
A private delivery model calls for an explicit legal framework for any form of electrification which involves significant long-term capital investment ([[Portal:Grid|grid]], [[Portal:Mini-grid|mini-grids]] and potentially standalone systems which are charged for on a pay-as-you-go basis) in order to attract private [[Portal:Financing and Funding|finance]]&nbsp;and allow for price regulation to protect users. A concession, which offers protection from competition, will provide the greatest attraction for private financiers. Where no long-term capital investment is involved, as with standalone systems sold directly to users, it’s generally considered that no legal control (beyond that for any business) is necessary.&nbsp;<br/>
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 155, 0);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(0, 204, 248)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(205, 52, 0);" |  
+
| style="width: 117px; background-color: rgb(205, 52, 0)" |  
<span style="color:#FFFFFF;">Price/Tariff Regulation</span><br/>
+
<span style="color:#FFFFFF">Price/Tariff Regulation</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
Grid connected mini-grids rely on the sale of electricity to the grid, and import of electricity from the grid and its sale to users, as well as sale of own-generated electricity to users. Clarity on how each of these tariffs is set and regulated will be key to securing investment:
+
Where electricity is delivered by the private sector, using purely private [[Portal:Financing and Funding|finance]], in a competitive market with no legal or effective monopoly (eg where several [[Basic Energy Services - Solar PV (SHS, Solar Lanterns)|solar lanterns]] providers are operating) price regulation may be regarded as unnecessary. However, where any form of concession has been granted (or exists in practice), price regulation would be expected to protect users. On the other side, where significant capital investment is involved private financiers are likely to require a transparent framework for price/tariff regulation, to reduce the risk of price controls being introduced in the future at below cost-recovery levels and preventing full recovery of and return on investment.
 
 
*Setting a standard price for purchase of electricity from the grid, or defining what category of user grid-connected mini-grids fall under, and having a transparent process for adjusting these prices (rather than leaving them to be negotiated between individual developers and the grid company) will give investors confidence;<br/>
 
*A standard price for sale of electricity to the grid (a feed-in tariff), based for instance on the grid company’s avoided cost (as in Tanzania) or an expected average cost from a particular form of generation, will similarly reduce mini-grid development costs and risks;<br/>
 
*Regulation of user tariffs for grid-connected mini-grids will be particularly sensitive given that the mini-grid operator may be drawing on the grid system to supply its users. Applying a uniform tariff (particularly a grid-parity) tariff is likely to offer some grid-connected mini-grids super-profits while making others uneconomic, but an approach based on a margin above the price for purchasing electricity from the grid may be appropriate (particularly where the system acts primarily as a means for distributing electricity from the grid and has little own-generation capacity). In general a cost-recovery approach, taking account of system-specific costs and any subsidies is likely to work best, and clarity and transparency of the process will be key for investors.
 
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 155, 0);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(0, 204, 248)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(32, 56, 100);" |  
+
| style="width: 117px; background-color: rgb(32, 56, 100)" |  
<span style="color:#FFFFFF;">Finance</span><br/>
+
<span style="color:#FFFFFF">Finance</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
The primary financing for grid-connected mini-grids will generally align with the delivery model, with publically-owned mini-grids using public finance and privately owned mini-grids drawing on private finance. However, where incomes are lower or system costs higher, some form of public-private partnership is likely to be needed with public funding (eg through grants and subsidies) making electricity from grid-connected mini-grids affordable to users and the mini-grid systems economically sustainable.<br/>
+
As discussed above a private delivery model must be purely privately [[Portal:Financing and Funding|financed]]&nbsp;(since inclusion of any public finance would cause the delivery model to be categorized as a public-private partnership). Ultimately private delivery models will rely on connection and ongoing charges, and standalone system purchases from users. For multi-user systems ([[Portal:Grid|grids]]&nbsp;and [[Portal:Mini-grid|mini-grids]]) there is also likely to be some element of cross-subsidy between users.<span style="font-size: 13.6px">&nbsp;</span>
 
 
<span style="font-size: 13.6px;">User charges are the other main source of funding with connection charges and ongoing tariffs are used to contribute to investment, cover ongoing operating costs and support repayment and return on investment. As with any system supplying multiple users there is likely to be some element of cross-subsidy between users connected to any individual mini-grid system. Cross-subsidy between grid-connected mini-grids or between the main grid and grid-connected systems may be appropriate, particularly if a uniform tariff is applied.&nbsp;&nbsp;</span>
 
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 155, 0);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(0, 204, 248)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(0, 100, 100);" |  
+
| style="width: 117px; background-color: rgb(0, 100, 100)" |  
<span style="color:#FFFFFF;">Non-Financial Interventions</span><br/>
+
<span style="color:#FFFFFF">Non-Financial Interventions</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" |  
+
| style="width: 616px" |  
National energy planning and sharing of market information are key to establishing the planned extent and timescales for grid extension and hence the scope for grid-connected mini-grids. Institutional restructuring, regulatory reform and policy and target-setting may all be required to create the framework for grid-connected mini-grids to be developed and establishment of technical standards is vital for enabling grid-connected mini-grids. Capacity building or technical assistance may be beneficial where potential developers or those (such as municipalities or user cooperatives) expected to take on responsibility distribution system operation lack capabilities. User awareness raising and demand promotion are often essential to increase revenues and make mini-grids economically sustainable.&nbsp;
+
National energy planning is key to establishing the optimum mix of technologies to meet electrification needs across the country, regardless of the delivery model employed. Institutional restructuring and capacity building or technical assistance may be needed where the key actors lack the capacity to undertake regulatory reform in order to establish the legal and regulatory framework for private electrification, or to set and implement technical and quality standards (needed where the private sector is delivering access through mini-grids or distribution systems to ensure safety and compatibility between systems, and to support user confidence). Awareness raising amongst users and other potential market actors and service providers, as well as training (capacity building) to develop the skilled workforce needed by new energy access businesses are likely to be particularly relevant under a private delivery model, and demand promotion may be needed to increase revenues and make electricity access economically sustainable. Private delivery models are often a means of introducing new technologies, with private sector players bringing in technologies which they believe will have advantages over existing options which will allow them to grow their businesses. (Such new technology introduction, however, brings risks, and the private sector will expect to reap additional returns to balance these risks).
  
 
|}
 
|}
Line 203: Line 202:
 
<br/>
 
<br/>
  
== Advantages and Disadvantages (Including Level of Electricity Provided) ==
+
== Advantages and Disadvantages ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 155, 0);" | <br/>
+
| style="width: 10px; background-color: rgb(0, 204, 248)" | <br/>
 
|  
 
|  
Mini-grids are particularly appropriate for relatively densely populated areas with higher demand levels (with off-grid systems providing the best solutions for sparsely populated low-demand areas). For mini-grids to be grid connected they must also be relatively close to the existing grid system. In theory mini-grids should only be the best option where the costs of infrastructure to connect to the grid system out-balance the economies of scale from large-scale centralized generation and pooling demand. Connection to the main grid system allows import and export of electricity and so enables the mini-grid to access these economies of scale and (provided the grid itself is reliable) supports higher levels of quality and reliability – however it also requires construction of connection infrastructure and compliance with grid technical standards. Grid-connected mini-grids can therefore be seen primarily as an alternative to grid extension, with the main differentiator being the ownership and/or management model. If a source of energy for generation exists in an area beyond the extent of the grid, it may provide an opportunity for a mini-grid to be developed to supply local users, and connected to the grid, more quickly than the grid itself would be extended. Management of distribution by the central grid company should provide organisational economies of scale, but in practice separate ownership or management of a local distribution system may increase organisational efficiency and allow an electricity service which is more responsive to users and their needs than that provided by the national grid company.
+
The private sector is widely seen as being more efficient, innovative flexible and nimble that the public sector and it is these virtues that it brings to energy access provision. Use of a private delivery model can be a way of bringing private sector skills and [[Portal:Financing and Funding|finance]]&nbsp;(both national and international), and the benefits of competition into the energy sector. Where public institutions are weak and ineffective, private delivery models may seem attractive, but it must be recognised that successful private delivery relies (particularly for [[Portal:Grid|grids]]&nbsp;and [[Portal:Mini-grid|mini-grids]]) on effective public management including strong regulatory frameworks and this calls for capabilities within public institutions which they may lack. There are also elements needed for the private sector to deliver, such as workforce skills and user awareness, which individual businesses may be reluctant to provide, because of the costs involved and because in a competitive market&nbsp;<span style="font-size: 13.6px">they will be unsure that they (rather than competitors) will capture the benefits and secure a return on their investment.&nbsp;</span><span style="font-size: 13.6px">In addition, where modern energy access is not affordable on a purely private financed basis or public financial input is&nbsp;</span><span style="font-size: 13.6px">needed to support the costs of early market development, a public-private partnership delivery model will be needed.&nbsp;</span><span style="font-size: 13.6px">Grid-connected mini-grids can, in theory, provide any level of electricity supply, but in most cases if the investment is made for grid connection and associated standards are met, they&nbsp; provide a grid-equivalent service, meeting all household, commercial, industrial and community requirements (Tier 5). (If the grid system itself is over-stretched with inadequate generation; or insufficiently robust or poorly maintained transmission and distribution systems reliability and quality of supply may deteriorate so that while users have a physical connection, they may not in fact have reliable access to electricity (bringing the supply Tier 3 or lower). To the extent that a grid-connected mini-grid draws on electricity from the grid its construction should be coupled with development of additional centralized generation capacity to support the resulting additional demand.</span>
 
 
Grid-connected mini-grids can, in theory, provide any level of electricity supply, but in most cases if the investment is made for grid connection and associated standards are met, they&nbsp; provide a grid-equivalent service, meeting all household, commercial, industrial and community requirements (Tier 5). (If the grid system itself is over-stretched with inadequate generation; or insufficiently robust or poorly maintained transmission and distribution systems reliability and quality of supply may deteriorate so that while users have a physical connection, they may not in fact have reliable access to electricity (bringing the supply Tier 3 or lower). To the extent that a grid-connected mini-grid draws on electricity from the grid its construction should be coupled with development of additional centralized generation capacity to support the resulting additional demand.
 
  
 
|}
 
|}
Line 217: Line 214:
 
<br/>
 
<br/>
  
== Further Informaiton and Guidance ==
+
== Further Information and Guidance ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 155, 0);" | <br/>
+
| style="width: 10px; background-color: rgb(0, 204, 248)" | <br/>
|  
+
| style="width: 735px" |  
*ARE. 2014. Hybrid Mini-Grids for Rural Electrification - Lessons Learned [https://ruralelec.org/sites/default/files/hybrid_mini-grids_for_rural_electrification_2014.pdf https://][https://ruralelec.org/sites/default/files/hybrid_mini-grids_for_rural_electrification_2014.pdf ruralelec.org/sites/default/files/hybrid_mini-grids_for_rural_electrification_2014.pdf]
+
*IRENA (2016), Policies and regulations to support renewable energy mini-grid development through private sector involvement [https://policy.practicalaction.org/policy-themes/energy/poor-peoples-energy-outlook/poor-people-s-energy-outlook-2016 https://policy.practicalaction.org/policy-themes/energy/poor-peoples-energy-outlook/poor-people-s-energy-outlook-2016]
*<span>Barnes</span><span>, D. (2007). The Challenge of Rural Electrification: Strategies for Developing Countries. Book Chapter. </span><span>[https://books.google.co.uk/books?id=iOBi17Pr3fIC&printsec=frontcover&source=gbs_ge_summary_r&cad=0 https://]</span><span>[https://books.google.co.uk/books?id=iOBi17Pr3fIC&printsec=frontcover&source=gbs_ge_summary_r&cad=0 books.google.co.uk/books?id=iOBi17Pr3fIC&printsec=frontcover&source=gbs_ge_summary_r&cad=0#v=onepage&q&f=false]</span><br/>
+
*Practical Action, ODI, Solar Aid, GOGLA. (2016). Accelerating Access to Electricity in Africa with Off-grid Solar [https://policy.practicalaction.org/policy-themes/energy/off-grid-solar https://policy.practicalaction.org/policy-themes/energy/off-grid-solar]<br/>
*<div>ESMAP (2005), Meeting the Challenge of Rural Electrification in Developing Nations: The Experience of Successful Programs [https://static.globalinnovationexchange.org/s3fs-public/asset/document/Meeting0the0Ch10Discussion0Version0.pdf?q3Tol9Bdn4yH4J43t3P9t3hq5lh6ZipT https://][https://static.globalinnovationexchange.org/s3fs-public/asset/document/Meeting0the0Ch10Discussion0Version0.pdf?q3Tol9Bdn4yH4J43t3P9t3hq5lh6ZipT static.globalinnovationexchange.org/s3fs-public/asset/document/Meeting0the0Ch10Discussion0Version0.pdf?q3Tol9Bdn4yH4J43t3P9t3hq5lh6ZipT]</div>
+
*UNEP & GOGLA, (2015), Developing Effective Off-Grid Lighting Policy [https://www.gogla.org/sites/www.gogla.org/files/recource_docs/developing-effective-off-grid-lighting-policy.pdf https://www.gogla.org/sites/www.gogla.org/files/recource_docs/developing-effective-off-grid-lighting-policy.pdf]<br/>
*<div>EUEI PDF (2014), Mini-grid Policy Toolkit: Policy and Business Frameworks for Successful Mini-grid Roll-outs&nbsp;[http://www.euei-pdf.org/sites/default/files/field_publication_file/RECP_MiniGrid_Policy_Toolkit_1pageview_(pdf,_17.6MB,_EN_0.pdf http://www.euei-pdf.org/sites/default/files/field_publication_file/RECP_MiniGrid_Policy_Toolkit_1pageview_(pdf,_17.6MB,_EN_0.pdf]<br/></div>
+
*WBCSD, Business Case for Low-Carbon Microgrids (2016) [http://www.ifc.org/wps/wcm/connect/topics_ext_content/ifc_external_corporate_site/ifc+sustainability/learning+and+adapting/knowledge+products/publications/publications_report_gap-opportunity http://www.ifc.org/wps/wcm/connect/topics_ext_content/ifc_external_corporate_site/ifc+sustainability/learning+ and+adapting/knowledge+products/publications/publications_report_gap-opportunity]<br/>
*IRENA (2016), Innovation Outlook: Renewable Mini-grids, International Renewable Energy Agency, Abu Dhabi [http://www.irena.org/DocumentDownloads/Publications/IRENA_Innovation_Outlook_Minigrids_2016.pdf http://][http://www.irena.org/DocumentDownloads/Publications/IRENA_Innovation_Outlook_Minigrids_2016.pdf www.irena.org/DocumentDownloads/Publications/IRENA_Innovation_Outlook_Minigrids_2016.pdf]<br/>
+
*World Resources Institute (2015),Clean Energy Access in Developing Countries: Perspectives on Policy and Regulation, Issue Brief 2&nbsp; [https://www.irena.org/DocumentDownloads/Publications/Evaluating_policies_in_support_of_the_deployment_of_renewable_power.pdf https://www.irena.org/DocumentDownloads/Publications/Evaluating_policies_in_support_of_the_ deployment_of_renewable_power.pdf]
 
 
*IRENA (2016), Policies and regulations to support renewable energy mini-grid [http://www.irena.org/DocumentDownloads/Publications/IRENA_Policies_Regulations_minigrids_2016.pdf http://][http://www.irena.org/DocumentDownloads/Publications/IRENA_Policies_Regulations_minigrids_2016.pdf www.irena.org/DocumentDownloads/Publications/IRENA_Policies_Regulations_minigrids_2016.pdf]<br/>
 
*<div>Kaundinya, D. P., Balachandra, P., & Ravindranath, N. H. (2009). Grid-connected versus stand-alone energy systems for decentralized power—a review of literature. Renewable and Sustainable Energy Reviews, 13(8), 2041-2050 [http://www.academia.edu/11422615/Grid-connected_versus_stand-alone_energy_systems_for_decentralized_power_A_review_of_literature http://][http://www.academia.edu/11422615/Grid-connected_versus_stand-alone_energy_systems_for_decentralized_power_A_review_of_literature www.academia.edu/11422615/Grid-connected_versus_stand-alone_energy_systems_for_decentralized_power_A_review_of_literature]</div>
 
*<div>NRECA, (Year Unknown), Guides for Electric Cooperative Development and Rural Electrification&nbsp;[http://www.nrecainternational.coop/wp-content/uploads/2016/11/GuidesforDevelopment.pdf http][http://www.nrecainternational.coop/wp-content/uploads/2016/11/GuidesforDevelopment.pdf ://][http://www.nrecainternational.coop/wp-content/uploads/2016/11/GuidesforDevelopment.pdf www.nrecainternational.coop/wp-content/uploads/2016/11/GuidesforDevelopment.pdf]<br/></div>
 
*<div>World Bank. 2014. From the Bottom Up. How Small Power Producers and Mini-Grids Can Deliver Electrification&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; and Renewable Energy in Africa. [https://openknowledge.worldbank.org/handle/10986/16571 https://][https://openknowledge.worldbank.org/handle/10986/16571 openknowledge.worldbank.org/handle/10986/16571]</div>
 
  
 
|}
 
|}
Line 238: Line 230:
 
<br/>
 
<br/>
  
== Relevante Case Studies: ==
+
== Relevant Case Studies ==
  
*[[NAE Case Study: Brazil, Luz para Todos (Light for All)|Brazil, Luz para Todos (Light for All)]]<br/>
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
*[[NAE Case Study: Cambodia “Light Touch” Regulation|Cambodia “Light Touch” Regulation]]<br/>
 
*[[NAE Case Study: Costa Rica, Distribution Cooperatives|Costa Rica, Distribution Cooperatives]]<br/>
 
*[[NAE Case Study: Rwanda, Sector-Wide Approach to Planning|Rwanda, Sector-Wide Approach to Planning]]<br/>
 
*[[NAE Case Study: Tanzania, Mini-Grids Regulatory Framework|Tanzania, Mini-Grids Regulatory Framework]]<br/>
 
*[[NAE Case Study: Vietnam, Rapid Grid Expansion|Vietnam, Rapid Grid Expansion]]<br/>
 
 
 
<br/>
 
 
 
= Isolated Mini-Grids =
 
 
 
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
 
 
|-
 
|-
| style="width: 130px; background-color: rgb(103, 153, 0);" |  
+
| style="width: 10px; background-color: rgb(0, 204, 248)" | <br/>
'''<span style="color:#FFFFFF;"><span style="font-size: 13.6px;">Definition:</span></span>'''<br/>
+
|  
 
+
None of the examples examined have had a purely private sector delivery models (ie no public involvement in either ownership or funding).
| style="width: 618px;" |  
 
'''<span><span>A system for generation and distribution of electricity to multiple users which is not connected to the main grid system.</span></span>'''
 
 
 
Mini-grids exist at a wide range of scales, from those supplying a few households to systems covering several communities. Isolated mini-grids rely on one or more local, usually small-scale (diesel, bioenergy, biomass, hydro, solar, wind or hybrid), generating plants and must balance demand and generation at all times. While these include fossil-fuel based generation, technology advances combined with environmental concerns mean that policy-makers are increasingly focussing on encouraging Renewable Energy based generation. Being separated from the grid system, isolated mini-grids can used lower voltages and lower-cost technologies than the main grid, and may be designed to provide anything from lighting alone (a “skinny grid”) to a full grid-equivalent electricity service.&nbsp;<br/>
 
  
 
|}
 
|}
Line 265: Line 242:
 
<br/>
 
<br/>
  
== Internactions wiht other NAE Categories: ==
+
{{Go to Top}}
 
 
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
 
|-
 
| style="width: 10px; background-color: rgb(103, 153, 0);" | <br/>
 
| style="width: 117px; background-color: rgb(51, 103, 152);" |
 
<span style="color:#FFFFFF;">Delivery Model</span><br/>
 
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
= Public-Private Partnership =
Isolated mini-grids are often privately owned, but may be publically owned or combine both in a public-private partnership. Common models include:
 
 
 
*An isolated mini-grid owned by a private developer, a user-cooperative or community organisation;<br/>
 
*Mini-grids owned and operated by the national grid company in off-grid areas;<br/>
 
*A mini-grid operated by a municipality or other local public entity to supply an off-grid community;<br/>
 
*Isolated mini-grids developed under a Public-Private Partnership, for instance on a Build-Own-Operate-Transfer basis.
 
 
 
|-
 
| style="width: 10px; background-color: rgb(103, 153, 0);" | <span style="color:#FFFFFF;"></span><br/>
 
| style="width: 117px; background-color: rgb(154, 103, 0);" |
 
<span style="color:#FFFFFF;">Legual Basis</span><br/>
 
 
 
<br/>
 
 
 
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
 
Mini-grids require substantial, long-term, capital investment and hence a regulatory framework which will give developers, and particularly private financiers, confidence that there will be a market for electricity from the mini-grid for a long enough period to repay and provide an adequate return on their investment. Larger systems may require concessions (which protect against competition over a designated area and time period) to give investors the confidence in revenue forecasts to commit the long-term capital investment needed. For smaller mini-grids, with lower and shorter-term capital investment, a licensing regime (which grants a non-exclusive right to sell electricity) may be more appropriate, with greater flexibility and a generally less demanding process balancing lack of protection from competition for the investor, while still providing the means to protect users through price/tariff regulation and setting technical and safety standards. Mini-grids below a certain size (eg <100kW in the [[NAE Case Study: Tanzania, Mini-Grids Regulatory Framework|Tanzania NAE Case Study]]), are often unregulated, as the administrative burden (and costs) of regulation are seen as disproportionate to the protection it would provide to investors and users, and the right to operate instead being granted through a general derogation from regulation.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
 
 
 
Under any regulatory regime a key question for private mini-grid investors will be what happens when the main grid arrives? Grid extension into a mini-grid concession area within the concession period may be prohibited by the terms of the concession, or there may be explicit provision for compensation and transfer of assets to grid ownership. mini-grid licensees have less protection from grid extension than concessionaires, but even where there is no formal concession it is often beneficial to establish a compensation regime in the event of grid extension, to encourage private mini-grid investment in the interim.
 
 
 
Where mini-grids are delivered through a public model with purely public finance, the legal basis will generally be less critical as public financiers are less likely to be concerned about recovery of and return on investment through future revenues.
 
 
 
|-
 
| style="width: 10px; background-color: rgb(103, 153, 0);" | <span style="color:#FFFFFF;"></span><br/>
 
| style="width: 117px; background-color: rgb(205, 52, 0);" |
 
<span style="color:#FFFFFF;">Price/Tariff Regulation</span><br/>
 
 
 
<br/>
 
 
 
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
 
Isolated mini-grids rely on revenues from the sale of electricity to users to cover ongoing operating,&nbsp; maintenance and administrative costs and repayment and return on investment. Regulation of tariff levels is therefore&nbsp; a critical factor for private investors in mini-grids, with inadequate or inappropriate tariff regulation often cited as the key barrier to mini-grid investment.<br/>
 
 
 
A uniform-tariff regime, where all mini-grid operators must charge the same tariffs, has the attraction of apparent equity, but will generally encourage investment only in those areas where electricity can be supplied at a lower cost allowing the investor to retain a margin and discourage investment in harder to supply areas (unless public funding/subsidy, or cross-subsidies, are made available to overcome higher costs). Individually set tariffs, based on costs specific to individual mini-grid contexts, are more likely to encourage investments in more remote areas.
 
 
 
Whatever form of tariff regulation is used the critical requirement is that it is clear and transparent, to reduce project development costs and give private financiers confidence that revenues from mini-grids are not vulnerable to arbitrary regulatory decisions and political pressure.
 
  
 +
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(103, 153, 0);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 130px; background-color: rgb(100, 203, 248)" |  
| style="width: 117px; background-color: rgb(32, 56, 100);" |
+
'''<span style="color:#FFFFFF"><span style="font-size: 13.6px">Definition</span></span>'''<br/>
<span style="color:#FFFFFF;">Finance</span><br/>
 
 
 
<br/>
 
 
 
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
 
Financing for isolated mini-grids will generally align with the delivery model, with publically-owned mini-grids using public finance and privately owned mini-grids drawing on private finance. However, where incomes are lower or system costs higher, some form of public-private partnership is likely to be needed with public funding (eg through grants and subsidies) making electricity from mini-grids affordable to users and the mini-grid systems economically sustainable.
 
 
 
User charges are the other main source of funding with connection charges and ongoing tariffs are used to contribute to investment, cover ongoing operating costs and support repayment and return on investment. As with any system supplying multiple users, there is likely to be some element of cross-subsidy between users connected to any individual mini-grid system. Cross-subsidy between isolated mini-grids or between the main grid and mini-grid systems may be appropriate, particularly if a uniform tariff is applied.
 
 
 
|-
 
| style="width: 10px; background-color: rgb(103, 153, 0);" | <span style="color:#FFFFFF;"></span><br/>
 
| style="width: 117px; background-color: rgb(0, 100, 100);" |
 
<span style="color:#FFFFFF;">Non-Financial Interventions</span><br/>
 
 
 
<br/>
 
 
 
| style="width: 616px;" |
 
National energy planning and sharing of market information are key to establishing the planned<br/>extent and timescales for grid extension and hence the scope for isolated mini-grids. Regulatory reform and policy and target-setting are likely to be required to create the framework for isolated mini-grids to be developed. Capacity building or technical assistance may be beneficial where potential developers lack necessary skills and capabilities. User awareness raising and demand promotion are often essential to increase revenues and make mini-grids economically sustainable.<br/>
 
 
 
|}
 
 
 
<br/>
 
 
 
<br/>
 
  
== Advantages and Disadvantages (Including Level of Electricity Provided) ==
+
| style="width: 618px" |
 +
'''Delivery of electricity access by an entity which is part publically and part privately owned or by a mix of publically and privately owned entities or using a combination of public and private finance'''<br/>
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
This includes cases where:
|-
 
| style="width: 10px; background-color: rgb(103, 153, 0);" | <br/>
 
|
 
Mini-grids are most appropriate for relatively densely populated areas with higher demand levels which are distant from the grid system, particularly where there is a good local source of energy for electricity generation. Because mini-grids rely on local, small-scale, generation, and their demand profiles often have pronounced peaks (because their users want electricity at the same times of day), their generating costs are usually higher than costs of electricity from larger power plants connected to the main grid, so in areas closer to the grid, where the cost of connecting to the grid is relatively low, grid extension will usually be more economic. In sparsely populated low-demand areas, standalone systems, despite their higher generating costs, may be more economic because they avoid the cost of a distribution system. mini-grids may also, even in areas for which grid extension would be more economic in the longer term, provide a means for achieving energy access more quickly.
 
  
Mini-grids may be designed to provide any level of electricity access, from “skinny-grid”, which just support lighting and, perhaps phone-charging (Tier 1) to a grid-equivalent service, meeting all household, commercial, industrial and community requirements (Tier 5). In many more remote communities where isolated mini-grids are the most appropriate solution, it is a Tier 2-3 level (to support medium power appliances such as fans, refrigerators, small water pumps and hand tools). In theory, the grid system which is able to call on multiple sources of generation should be more reliable than an isolated mini-grid, but in practice if the grid system itself is over-stretched with inadequate generation; or insufficiently robust or poorly maintained transmission and distribution systems, reliability and quality of supply may deteriorate so that while users have a physical connection they may not in fact have reliable access to electricity. Poor grid reliability is one of the reasons many users turn to mini-grids and standalone systems even in areas where grid connection is available.
+
*a joint venture has been created between a state-owned organisation and a private company to provide electricity<br/>
 +
*one or more state-owned organisation fill some of the functions along the market chain1, while others are filled by private businesses<br/>
 +
*electricity provision is undertaken by private businesses with public [[Portal:Financing and Funding|financial]]&nbsp;support (subsidies, grants, loans etc)&nbsp; &nbsp;&nbsp;
  
 
|}
 
|}
Line 353: Line 266:
 
<br/>
 
<br/>
  
== Further Informaiton and Guidance ==
+
== Interactions with other NAE Categories ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(103, 153, 0);" | <br/>
+
| style="width: 10px; background-color: rgb(100, 203, 248)" | <br/>
|  
+
| style="width: 117px; background-color: rgb(0, 101, 0)" |
*ARE. 2014. Hybrid Mini-Grids for Rural Electrification - Lessons Learned [https://ruralelec.org/sites/default/files/hybrid_mini-grids_for_rural_electrification_2014.pdf https://][https://ruralelec.org/sites/default/files/hybrid_mini-grids_for_rural_electrification_2014.pdf ruralelec.org/sites/default/files/hybrid_mini-grids_for_rural_electrification_2014.pdf]
+
<span style="color:#FFFFFF">Technology</span><br/>
*<div>ESMAP (2005), Meeting the Challenge of Rural Electrification in Developing Nations: The Experience of Successful Programs [https://static.globalinnovationexchange.org/s3fs-public/asset/document/Meeting0the0Ch10Discussion0Version0.pdf?q3Tol9Bdn4yH4J43t3P9t3hq5lh6ZipT https://][https://static.globalinnovationexchange.org/s3fs-public/asset/document/Meeting0the0Ch10Discussion0Version0.pdf?q3Tol9Bdn4yH4J43t3P9t3hq5lh6ZipT static.globalinnovationexchange.org/s3fs-public/asset/document/Meeting0the0Ch10Discussion0Version0.pdf?q3Tol9Bdn4yH4J43t3P9t3hq5lh6ZipT]</div>
 
*<div><span>EUEI </span><span>PDF (2014), Mini-grid Policy Toolkit: Policy and Business Frameworks for Successful Mini-grid Roll-outs&nbsp;[http://www.euei-pdf.org/sites/default/files/field_publication_file/RECP_MiniGrid_Policy_Toolkit_1pageview_(pdf,_17.6MB,_EN_0.pdf http://www.euei-pdf.org/sites/default/files/field_publication_file/RECP_MiniGrid_Policy_Toolkit_1pageview_(pdf,_17.6MB,_EN_0.pdf]&nbsp;&nbsp;</span><br/></div>
 
*<div><span></span>IRENA (2016), Innovation Outlook: Renewable Mini-grids, International Renewable Energy Agency, Abu Dhabi [http://www.irena.org/DocumentDownloads/Publications/IRENA_Innovation_Outlook_Minigrids_2016.pdf http://][http://www.irena.org/DocumentDownloads/Publications/IRENA_Innovation_Outlook_Minigrids_2016.pdf www.irena.org/DocumentDownloads/Publications/IRENA_Innovation_Outlook_Minigrids_2016.pdf]</div>
 
*IRENA (2016), Policies and regulations to support renewable energy mini-grid [http://www.irena.org/DocumentDownloads/Publications/IRENA_Policies_Regulations_minigrids_2016.pdf http://][http://www.irena.org/DocumentDownloads/Publications/IRENA_Policies_Regulations_minigrids_2016.pdf www.irena.org/DocumentDownloads/Publications/IRENA_Policies_Regulations_minigrids_2016.pdf]<br/>
 
*World Bank. 2014. From the Bottom Up. How Small Power Producers and Mini-Grids Can Deliver Electrification and Renewable Energy in Africa. [https://openknowledge.worldbank.org/handle/10986/16571 https://][https://openknowledge.worldbank.org/handle/10986/16571 openknowledge.worldbank.org/handle/10986/16571]
 
 
 
|}
 
  
 
<br/>
 
<br/>
  
== Relevante Case Studies: ==
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
 +
Public-private models for [[Portal:Grid|grid]]&nbsp;systems might include:
  
*[[NAE Case Study: Brazil, Luz para Todos (Light for All)|Brazil, Luz para Todos (Light for All)]]<br/>
+
*Publically owned generation and transmission combined with privately owned distribution;<br/>
*[[NAE Case Study: Cambodia “Light Touch” Regulation|Cambodia “Light Touch” Regulation]]<br/>
+
*Independent Power Producers (IPPs) connected to a publically owned transmission/distribution system;<br/>
*[[NAE Case Study: Kenya, Off-Grid for Vision 2030|Kenya, Off-Grid for Vision 2030]]<br/>
+
*<span style="font-size: 13.6px">A privately owned grid system using grants from public sources to connect new users.</span>
*[[NAE Case Study: Mali, Rural Electrification Programme|Mali, Rural Electrification Programme]]<br/>
 
*[[NAE Case Study: Nepal, Rural Energy Development Programme|Nepal, Rural Energy Development Programme]]<br/>
 
*[[NAE Case Study: Philippines, Islanded Distribution by Cooperatives|Philippines, Islanded Distribution by Cooperatives]]<br/>
 
*[[NAE Case Study: Rwanda, Sector-Wide Approach to Planning|Rwanda, Sector-Wide Approach to Planning]]<br/>
 
*[[NAE Case Study: Tanzania, Mini-Grids Regulatory Framework|Tanzania, Mini-Grids Regulatory Framework]]<br/>
 
 
 
<br/>
 
  
= Standalone Systems =
+
<span style="font-size: 13.6px">For grid connected [[Portal:Mini-grid|mini-grids]]&nbsp;and distribution systems:</span><br/>
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
*Mini-grids owned by a private developer connected to the (publically-owned) main grid, and thereby drawing on publically owned generation to meet demand;<br/>
|-
+
*A private company, or public-private joint venture, taking on operation of a section of the publically-owned grid distribution system;<br/>
| style="width: 130px; background-color: rgb(171, 211, 141);" |
+
*Public grants or subsidies supporting development of a privately-owned mini-grid or distribution system.<br/>
'''<span style="color:#FFFFFF;"><span style="font-size: 13.6px;">Definition:</span></span>'''<br/>
 
  
| style="width: 618px;" |
+
For isolated mini-grids:
'''<span><span>A system for generating and supplying electricity to a single user (separate from any distribution system).</span></span>'''<br/>
 
  
'''<span><span></span></span>'''Standalone systems may use any locally available source of energy (including solar, wind, hydropower, biogas, biomass, biofuels or diesel generators). While these include fossil-fuel based generation, technology advances combined with environmental concerns mean that policy-makers are increasingly focussing on encouraging Renewable Energy based generation. They may serve a single purpose (such as lighting or irrigation water-pumping) or be designed to meet all the electricity needs of the user. They range in size from solar lanterns, through small household systems to larger installations serving industrial enterprises (though for the purposes of this review the focus is on systems suitable for households, community facilities and SMEs).<br/>
+
*Mini-grids developed on a Build-Own-Operate-Transfer basis (initially owned and operated by a private developer, but transferred to public ownership at the end of a concession period);<br/>
 +
*Mini-grids built and operated by a public-private joint venture;<br/>
 +
*Public grants or subsidies supporting development of a privately-owned mini-grid.
  
|}
+
Use of public [[Portal:Financing and Funding|finance]]&nbsp;(grants, subsidies and loans) to enhance affordability and support market growth often results in a public-private model for standalone systems, even when there is a purely private-sector chain of manufacturers, importers, distributors and retailers. There could also be benefits in some circumstances from government energy agencies becoming directly involved in the standalone system market, by forming a joint entity to supply systems or by taking on one of the roles along the value chain (eg providing a distribution service for all system providers), as a means of supporting market development.
  
<br/>
 
 
== Internactions wiht other NAE Categories: ==
 
 
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
 
 
|-
 
|-
| style="width: 10px; background-color: rgb(171, 211, 141);" | <br/>
+
| style="width: 10px; background-color: rgb(100, 203, 248)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(51, 103, 152);" |  
+
| style="width: 117px; background-color: rgb(154, 103, 0)" |  
<span style="color:#FFFFFF;">Delivery Model</span><br/>
+
<span style="color:#FFFFFF">Legal Basis</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
Standalone systems are most frequently supplied to users through a purely private-sector chain of manufacturers, importers, distributors and retailers. In a number of cases (such as shown in the [[NAE Case Study: Bangladesh, IDCOL Solar Home Systems|NAE Case Study of the IDCOL programme in Bangladesh]]), public-private partnership models have been used. In general this has been through use of public finance (grants, subsidies and loans) to enhance affordability and support market growth, though there could be benefits in certain circumstances for government energy agencies to become directly involved in the standalone system market, by forming a joint entity to supply systems or by taking on one of the roles along the value chain (eg providing a distribution service for all system providers). More rarely a purely public model is used to provide standalone systems to users, for example where the grid company provides standalone systems to those it is not economic to connect to the grid (eg in [[NAE Case Study: South Africa, Integrated National Electrification|NAE Case Study South Africa]]).&nbsp;<br/>
+
Because a public-private model involves private ownership and investment, an explicit legal framework will be required for any form of electrification which involves significant long-term capital investment in order to attract private [[Portal:Financing and Funding|finance]]&nbsp;and allow for price regulation to protect users. A concession, which offers protection from competition, will provide the greatest attraction for private financiers. Where no long-term capital investment is involved, as with standalone systems sold directly to users, no legal control (beyond that for any business) may be necessary – however if there is partial public sector ownership, a transparent legal framework&nbsp;<span style="font-size: 13.6px">may be required to convince private market participants that they are not facing unfair competition, and also to ensure that&nbsp;</span><span style="font-size: 13.6px">any public finance is not being misused.&nbsp;</span>
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(171, 211, 141);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(100, 203, 248)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(154, 103, 0);" |  
+
| style="width: 117px; background-color: rgb(205, 52, 0)" |  
<span style="color:#FFFFFF;">Legual Basis</span><br/>
+
<span style="color:#FFFFFF">Price/Tariff Regulation</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
Standalone system providers are rarely subject to regulation (beyond general business licensing requirements), though they may be required to meet certain standards in order to access subsidies and tax exemptions. In part this reflects&nbsp; policy-makers’ perception of them as product retailers rather than infrastructure providers, but also that without long-term fixed capital investment, private companies have not needed the protection of a concession or license to attract private capital (and would regard it simply as a regulatory burden). Concessions for standalone systems may however, as in [[NAE Case Study: Peru, Concession Model for Standalone Systems|NAE Case Study Peru]], be used to bring standalone system companies into a market which they might otherwise be unwilling to enter by protecting them from competition (though the long-term risks of market distortion under such an arrangement should be carefully considered). Standalone systems may also be included as one means of providing electricity within an integrated electricity concession also encompassing mini-grid and/or grid system access. It’s also possible that with standalone system providers increasingly looking to pay-as-you-go arrangements, where they retain ownership of the system until the user has bought it through monthly payments, or even over its full life with the user simply paying for electricity used, regulating electricity supply through standalone systems may become more appropriate.
+
Where significant capital investment is involved, a transparent framework for price/tariff regulation is likely to be required to attract the private element into any public-private partnership. Tariff regulation will also protect users and provide a means of ensuring that public [[Portal:Financing and Funding|finance]]&nbsp;is not being misused or exploited by the private sector. It may also demonstrate to private market participants that they are not facing unfair competition from partially publically-owned market participants.&nbsp;
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(171, 211, 141);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(100, 203, 248)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(205, 52, 0);" |  
+
| style="width: 117px; background-color: rgb(32, 56, 100)" |  
<span style="color:#FFFFFF;">Price/Tariff Regulation</span><br/>
+
<span style="color:#FFFFFF">Finance</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
Prices of standalone systems supplied by the private sector are generally unregulated. Where public funding is used to support provision of standalone systems it may (as with the [[NAE Case Study: Bangladesh, IDCOL Solar Home Systems|NAE Case Study of the IDCOL programme in Bangladesh]]) be appropriate to regulate prices. Also, if the move towards pay-as-you-go, with users paying for electricity as they do from grid or mini-grids, while suppliers retain ownership of the capital equipment, continues or accelerates, regulation of the prices they pay may become more relevant. Regulation of prices for standalone systems, or of electricity supplied through these systems, on an individual basis is impractical given the multiplicity of systems. Uniform price regulation, where a standard price or tariff is set is more likely to be viable. However, any such regulation should recognize the differentials in costs between different types and sizes of standalone system, and parity<br/>with grid (or mini-grid) prices should only be attempted if subsidies are available to balance the cost differentials between these different Technologies.<br/>
+
All public-private partnerships will involve a combination of private and public [[Portal:Financing and Funding|finance]]. Private finance will come through ownership and investment in, and loans to electricity providers. Public finance may come through these routes, but may also be through various forms of grant, subsidy, tax exemption or guarantee. Ultimately public-private models, like other forms of electricity provision, will rely on connection and ongoing charges, and standalone system purchases from users. For multi-user systems ([[Portal:Grid|grids]]&nbsp;and [[Portal:Mini-grid|mini-grids]]) there is also likely to be some element of cross-subsidy between users.&nbsp;
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(171, 211, 141);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(100, 203, 248)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(32, 56, 100);" |  
+
| style="width: 117px; background-color: rgb(0, 100, 100)" |  
<span style="color:#FFFFFF;">Finance</span><br/>
+
<span style="color:#FFFFFF">Non-Financial Interventions</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" |  
Though provision of standalone systems requires less capital investment than investment in grid or mini-grid systems, those establishing standalone system business nevertheless require capital for business development and working capital to fund the period (typically three months or more) between purchase/ import of the product by the business and sale to the end-user. Because standalone systems are often imported, this also brings a requirement for access to foreign capital. Where standalone systems are sold to users, it is to these users that much of the requirement for capital investment falls. This need for up-front user finance has formed one of the most substantial barriers to growth of markets for standalone systems (even where these systems are demonstrably an economic option for the user in the longer term). This barrier can be alleviated through micro-finance and similar programmes, and has also driven the growth of pay-as-you-go arrangements whereby the need for up-front finance is transferred to the supplier (though users remain the ultimate source of finance through their payments for electricity).&nbsp; Though most standalone system providers are private companies, many have struggled to access private finance, reflecting private financiers reluctance to invest in start-up companies without established track-records seeking to grow a new market. Instead many have relied on finance from donors and social funders. This has been one of the main constraints on standalone system market growth.&nbsp; Public finance, through grants, subsidies and concessionary loans (to both suppliers and users) and tax exemptions (eg VAT and import duty exemptions) have been used to make standalone systems more affordable to users.&nbsp;<br/>
+
National energy planning is key to establishing the optimum mix of technologies to meet electrification needs across the country, regardless of the delivery model employed. Institutional restructuring may be needed to establish public-private partnerships and capacity building or technical assistance may be required if the key actors lack the capacity to undertake regulatory reform or design arrangements for public [[Portal:Financing and Funding|financial]]&nbsp;support.&nbsp; Awareness raising amongst users and other potential market actors and service providers, as well as training (capacity building) to develop the skilled workforce needed by new energy access businesses can be beneficial alongside financial forms of public support. Public-private partnership may also provide the means to bring in new technology, with the private sector providing the technology know-how while the public sector bears the risk inherent in new technology which private investors may be reluctant to take on.&nbsp;<br/>
 
 
|-
 
| style="width: 10px; background-color: rgb(171, 211, 141);" | <span style="color:#FFFFFF;"></span><br/>
 
| style="width: 117px; background-color: rgb(0, 100, 100);" |
 
<span style="color:#FFFFFF;">Non-Financial Interventions</span><br/>
 
 
 
<br/>
 
 
 
| style="width: 616px;" |
 
Clear national policies and targets and availability of market information have been identified as key factors enabling standalone system providers to assess market scale and so encourage market entry. Regulatory reform, particularly in the finance sector to enable pay-as-you-go arrangements is also seen as vital, as is establishment and enforcement of quality standards to give consumers confidence in products. Exemption from taxes and duties (particularly where this is needed to create a level playing field with other forms of energy access) can catalyse market development, and user awareness raising and development of a workforce with the technical and business skills need to support business growth are also important (and beyond the capacity of individual standalone system businesses) to support its growth.
 
  
 
|}
 
|}
Line 458: Line 343:
 
== Advantages and Disadvantages (Including Level of Electricity Provided) ==
 
== Advantages and Disadvantages (Including Level of Electricity Provided) ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(171, 211, 141);" | <br/>
+
| style="width: 10px; background-color: rgb(100, 203, 248)" | <br/>
 
|  
 
|  
Standalone systems encompass a wide range of technologies from solar lanterns, to solar home systems and pumps, to larger scale diesel, hydro, biomass and wind-powered generators. Because they lack the economies of scale provided by grid (or even mini-grid) systems, the cost per unit of electricity from standalone systems is generally higher than from a grid (or mini-grid) connection. However in areas which are remote from the grid system and are sparsely populated (or lack a substantial energy source), standalone systems may provide the lowest cost option for electricity supply because they avoid the cost of distribution infrastructure. In addition, while the cost per unit of electricity may be relatively high, for low-demand users (eg those only looking for lighting and phone charging) they can still offer the most economic solution. Standalone solutions are also used by those who want back-up for an unreliable grid or mini-grid supply, or who want independence from the grid system.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
+
Public-Private partnerships offer the potential to combine the benefits of both models, with public security being combined with private efficiency, innovation and flexibility. Bringing in private [[Portal:Financing and Funding|finance]]&nbsp;can extend the capacity for electricity provision beyond that which the public sector alone can offer, while public financial support can be used to attract private finance and make electricity affordable for users.&nbsp; Combining public and private inputs is not, however, simple. Significant expertise is required to ensure that private investment is attracted while making optimum use of public resources. Moreover, the appropriate form of public-private partnership will change as markets develop and levels of electricity access increase – and this must be recognised while at the same time creating regimes which can give the private sector the confidence in the future they require to invest.
 
 
In line with the wide range of technologies encompassed by standalone systems, they can be designed to provide any level of electricity. In general, however, the differential in cost between grid/mini-grid and standalone systems increases as the level of supply goes up (particularly for solar standalone systems), and standalone household systems therefore most often provide only Tier 1 (or even lower) access and rarely provide more than Tier 2-3 access, though systems for enterprises and community facilities may be larger and provide a higher level of access (with larger systems often being supported by hydro or fuel rather than solar generation).&nbsp;&nbsp;
 
  
 
|}
 
|}
Line 470: Line 353:
 
<br/>
 
<br/>
  
== Further Informaiton and Guidance ==
+
== Further Information and Guidance ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(171, 211, 141);" | <br/>
+
| style="width: 10px; background-color: rgb(100, 203, 248)" | <br/>
 
|  
 
|  
*Practical Action, ODI, Solar Aid, GOGLA. (2016). Accelerating Access to Electricity in Africa with Off-grid Solar [https://policy.practicalaction.org/policy-themes/energy/off-grid-solar https://][https://policy.practicalaction.org/policy-themes/energy/off-grid-solar policy.practicalaction.org/policy-themes/energy/off-grid-solar]
+
*<span>Clean </span><span>Energy Solutions Centre & </span><span>iied</span><span>. (2015). Policies to Spur Energy&nbsp;</span><span>Access</span>&nbsp;<span><span>[https://cleanenergysolutions.org/resources/policies-spur-energy-access https]</span><span>[https://cleanenergysolutions.org/resources/policies-spur-energy-access ://]</span><span>[https://cleanenergysolutions.org/resources/policies-spur-energy-access cleanenergysolutions.org/resources/policies-spur-energy-access]</span></span>
*UNEP & GOGLA, (2015), Developing Effective Off-Grid Lighting Policy. [https://www.gogla.org/sites/www.gogla.org/files/recource_docs/developing-effective-off-grid-lighting-policy.pdf https://][https://www.gogla.org/sites/www.gogla.org/files/recource_docs/developing-effective-off-grid-lighting-policy.pdf www.gogla.org/sites/www.gogla.org/files/recource_docs/developing-effective-off-grid-lighting-policy.pdf]
 
  
 
|}
 
|}
Line 483: Line 365:
 
<br/>
 
<br/>
  
== Relevante Case Studies: ==
+
== Relevant Case Studies ==
  
 +
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 +
|-
 +
| style="width: 10px;  background-color: rgb(100, 203, 248)" | <br/>
 +
|
 
*[[NAE Case Study: Bangladesh, IDCOL Solar Home Systems|Bangladesh, IDCOL Solar Home Systems]]<br/>
 
*[[NAE Case Study: Bangladesh, IDCOL Solar Home Systems|Bangladesh, IDCOL Solar Home Systems]]<br/>
 
*[[NAE Case Study: Brazil, Luz para Todos (Light for All)|Brazil, Luz para Todos (Light for All)]]<br/>
 
*[[NAE Case Study: Brazil, Luz para Todos (Light for All)|Brazil, Luz para Todos (Light for All)]]<br/>
 +
*[[NAE Case Study: Cambodia “Light Touch” Regulation|Cambodia “Light Touch” Regulation]]<br/>
 +
*[[NAE Case Study: Costa Rica, Distribution Cooperatives|Costa Rica, Distribution Cooperatives]]<br/>
 
*[[NAE Case Study: Ethiopia, Solar Market Development|Ethiopia, Solar Market Development]]<br/>
 
*[[NAE Case Study: Ethiopia, Solar Market Development|Ethiopia, Solar Market Development]]<br/>
 
*[[NAE Case Study: Kenya, Off-Grid for Vision 2030|Kenya, Off-Grid for Vision 2030]]<br/>
 
*[[NAE Case Study: Kenya, Off-Grid for Vision 2030|Kenya, Off-Grid for Vision 2030]]<br/>
 +
*[[NAE Case Study: Mali, Rural Electrification Programme|Mali, Rural Electrification Programme]]<br/>
 +
*[[NAE Case Study: Nepal, Rural Energy Development Programme|Nepal, Rural Energy Development Programme]]<br/>
 
*[[NAE Case Study: Peru, Concession Model for Standalone Systems|Peru, Concession Model for Standalone Systems]]<br/>
 
*[[NAE Case Study: Peru, Concession Model for Standalone Systems|Peru, Concession Model for Standalone Systems]]<br/>
 +
*[[NAE Case Study: Philippines, Islanded Distribution by Cooperatives|Philippines, Islanded Distribution by Cooperatives]]<br/>
 
*[[NAE Case Study: Rwanda, Sector-Wide Approach to Planning|Rwanda, Sector-Wide Approach to Planning]]<br/>
 
*[[NAE Case Study: Rwanda, Sector-Wide Approach to Planning|Rwanda, Sector-Wide Approach to Planning]]<br/>
 
*[[NAE Case Study: South Africa, Integrated National Electrification|South Africa, Integrated National Electrification]]<br/>
 
*[[NAE Case Study: South Africa, Integrated National Electrification|South Africa, Integrated National Electrification]]<br/>
 +
*[[NAE Case Study: Tanzania, Mini-Grids Regulatory Framework|Tanzania, Mini-Grids Regulatory Framework]]<br/>
 +
*[[NAE Case Study: Vietnam, Rapid Grid Expansion|Vietnam, Rapid Grid Expansion]]<br/>
  
<br/>
+
|}
 
 
= References =
 
 
 
== Authors ==
 
 
 
<span lang="EN-US">Authors: Mary Willcox, Dean Cooper</span>
 
 
 
== Acknowledgements ==
 
 
 
{{NAE Acknowledgements}}
 
  
 
<br/>
 
<br/>
  
----
+
{{Go to Top}}
  
 
<br/>
 
<br/>
  
= Public =
+
= References =
  
<br/>
+
{{NAE Acknowledgements}}
 
 
= Private (Non-Governement) =
 
 
 
<br/>
 
 
 
= Public-Private Partnership =
 
 
 
[[File:Back to NAE Overview Page.png|center|800px|NAE Overview Page|alt=NAE Overview Page|link=National Approaches to Electrification – Overview]]
 
  
 +
[[Category:Mini-grid]]
 +
[[Category:Grid]]
 +
[[Category:Energy_Access]]
 
[[Category:NAE]]
 
[[Category:NAE]]

Latest revision as of 15:45, 30 July 2018

NAE Overview Page
TechnologyTechnology: Grid ExtensionTechnology: Grid-Connected Mini-Grid/Distribution SystemTechnology: Isolated Mini-GridTechnology: Standalone SystemsDelivery ModelDelivery Model: PublicDelivery Model: Private (Non-Government)Delivery Model: Public-Private PartnershipLegal BasisLegal Basis: ConcessionLegal Basis: LicenseLegal Basis / Price/Tariff Regulation: UnregulatedPrice/Tariff RegulationPrice/Tariff Regulation: UniformPrice/Tariff Regulation: IndividualFinanceFinance: PrivateFinance : UserFinance: Grants & SubsidiesFinance: Cross-SubsidiesFinance: Tax ExemptionsFinance: GuaranteesNon-Financial InterventionsNon-Financial Interventions: Direct Energy Access ProvisionNon-Financial Interventions: Institutional RestructuringNon-Financial Interventions: Regulatory ReformNon-Financial Interventions: Policy & Target SettingNon-Financial Interventions: Quality & Technical StandardsNon-Financial Interventions: Technical AssistanceNon-Financial Interventions: Capacity Building & Awareness RaisingNon-Financial Interventions: Market InformationNon-Financial Interventions: Demand PromotionNon-Financial Interventions: Technology Development & AdoptionNon-Financial Interventions: National Energy PlanningNational Approaches to Electrification – Delivery Model Page.png]]



Delivery Model: The (market) chain of organisations through which electricity is delivered to users



Public

Definition

Delivery of electricity access by an entity or entities all of which are publically owned and managed, using purely public finance.

In this delivery model all of the organisations engaged in provision of electricity access (whether through supply of electricity itself or provision of electricity systems), as part of the National Electrification Approach being considered, are state-owned. This implies that all the actors along the market chain (Project Development, Manufacture/Generation, Distribution and Retail) are publically owned. These may include electricity utilities, publically-owned generation, transmission and distribution companies, municipalities, or rural energy agencies. 


Interactions with other NAE Categories


Technology


National grid systems have most often been established under a public delivery model either through a single public electricity company owning and managing the entire system or through separate public generation, transmission and distribution companies. Grid-connected mini-grids and distribution systems may also be publically owned, for instance by a local municipality. Where isolated mini-grids or standalone systems are delivered through a public model this is generally by an electricity utility or distribution company which has adopted an integrated approach with electricity being provided using a combination of grid, mini-grid and standalone systems.


Legal Basis


Regulation of public delivery models is often implicit, with oversight and control being through organisational hierarchy rather than any explicit regulatory framework. For instance a national utility company’s monopoly (concession) over generation and/or sale of electricity may be established through the legislation under which it is created rather than through any separate framework. However, though an explicit regulatory framework may not be needed to give private investors confidence, such a framework is nevertheless regarded as best practice to achieve transparency and provide a barrier to political interference.


Price/Tariff Regulation


Where electricity is delivered through public models, with no need to attract private investment, there is also a temptation to manage prices by means of the organisational hierarchy. However, without independent regulation, there is a risk that political pressure will result in prices being depressed below cost-recovery levels leading to insolvency of the electricity providers and deterioration of the electricity provision.


Finance


By definition, a public delivery model will use public finance– by publically-owned utility companies or national or local government, potentially supported by loans and grants from international agencies - (since any private finance would cause the delivery model to be categorized as a public-private partnership). In addition public delivery models will draw on finance from users, through standalone system purchases, connection charges and ongoing charges, and for multi-user systems (grids and mini-grids) there is likely to be some element of cross-subsidy between users.


Non-Financial Interventions


National energy planning is key to establishing the optimum mix of technologies to meet electrification needs across the country, regardless of the delivery model employed. Institutional restructuring and capacity building or technical assistance may be needed where the key actors involved in public delivery models lack capacity is aspects of electrification. Technology development/adoption and adoption of appropriate technical standards, user awareness raising and demand promotion may be needed to increase revenues and make electricity access economically sustainable, regardless of the delivery model chosen.


Advantages and Disadvantages


A public delivery model has the advantage of making use of existing institutions. Where these organisations have strong capabilities and are efficient, a public delivery model may allow strongly focused and effective delivery of electrification and good coordination of grid, mini-grid and stand-alone solutions. However public organisations are often monolithic and slow moving. They may be more focused on managing existing assets than serving new consumers, particularly in remote rural areas, and they may lack the capabilities needed to deliver new forms of electricity access. They are also vulnerable to political pressure and interference, which can hamper electrification efforts and result in poor allocation of resources. Following a private sector or private-public partnership model can allow private sector finance and skills to be brought to bear and may achieve greater flexibility, speed and efficiency.


Further Information and Guidance



Relevant Case Studies



►Go to Top


Private (Non-Government)

Definition

Delivery of electricity access by an entity or entities none of which are owned and managed by the state, using purely private finance.

In this model all of the organisations engaged in provision of electricity access (whether through supply of electricity itself or provision of electricity systems), as part of the National Electrification Approach being considered, are non-state-owned. This implies that all the actors along the market chain1 (Project Development, Manufacture/Generation, Distribution and Retail) are non-state entities such as private companies, cooperatives, social enterprises, community organisations or NGOs (all characterised for this purpose as “private” organisations). 


Interactions with other NAE Categories


Technology


Few, if any, national grid systems have been established through a private delivery model (though in many countries privatisation has been used to transfer them into private ownership and bring in private investment). Grid-connected mini-grids and distribution systems have frequently been developed by private (non-state-owned) organisations. Where the grid system is also privately-owned, this constitutes a private model. (However, if the grid system is publically owned, and the mini-grid or distribution system uses electricity from the grid system, or the development draws on public grants, subsidies, loans, tax exemptions or guarantees, it constitutes a public-private partnership). The most frequently used models for delivery of standalone systems are private, through the involvement of state-organisations along the market chain, or use of funding from grants or subsidies provided by the state, donors or international agencies, may result in private-public partnerships.


Legal Basis


A private delivery model calls for an explicit legal framework for any form of electrification which involves significant long-term capital investment (grid, mini-grids and potentially standalone systems which are charged for on a pay-as-you-go basis) in order to attract private finance and allow for price regulation to protect users. A concession, which offers protection from competition, will provide the greatest attraction for private financiers. Where no long-term capital investment is involved, as with standalone systems sold directly to users, it’s generally considered that no legal control (beyond that for any business) is necessary. 


Price/Tariff Regulation


Where electricity is delivered by the private sector, using purely private finance, in a competitive market with no legal or effective monopoly (eg where several solar lanterns providers are operating) price regulation may be regarded as unnecessary. However, where any form of concession has been granted (or exists in practice), price regulation would be expected to protect users. On the other side, where significant capital investment is involved private financiers are likely to require a transparent framework for price/tariff regulation, to reduce the risk of price controls being introduced in the future at below cost-recovery levels and preventing full recovery of and return on investment.


Finance


As discussed above a private delivery model must be purely privately financed (since inclusion of any public finance would cause the delivery model to be categorized as a public-private partnership). Ultimately private delivery models will rely on connection and ongoing charges, and standalone system purchases from users. For multi-user systems (grids and mini-grids) there is also likely to be some element of cross-subsidy between users. 


Non-Financial Interventions


National energy planning is key to establishing the optimum mix of technologies to meet electrification needs across the country, regardless of the delivery model employed. Institutional restructuring and capacity building or technical assistance may be needed where the key actors lack the capacity to undertake regulatory reform in order to establish the legal and regulatory framework for private electrification, or to set and implement technical and quality standards (needed where the private sector is delivering access through mini-grids or distribution systems to ensure safety and compatibility between systems, and to support user confidence). Awareness raising amongst users and other potential market actors and service providers, as well as training (capacity building) to develop the skilled workforce needed by new energy access businesses are likely to be particularly relevant under a private delivery model, and demand promotion may be needed to increase revenues and make electricity access economically sustainable. Private delivery models are often a means of introducing new technologies, with private sector players bringing in technologies which they believe will have advantages over existing options which will allow them to grow their businesses. (Such new technology introduction, however, brings risks, and the private sector will expect to reap additional returns to balance these risks).


Advantages and Disadvantages


The private sector is widely seen as being more efficient, innovative flexible and nimble that the public sector and it is these virtues that it brings to energy access provision. Use of a private delivery model can be a way of bringing private sector skills and finance (both national and international), and the benefits of competition into the energy sector. Where public institutions are weak and ineffective, private delivery models may seem attractive, but it must be recognised that successful private delivery relies (particularly for grids and mini-grids) on effective public management including strong regulatory frameworks and this calls for capabilities within public institutions which they may lack. There are also elements needed for the private sector to deliver, such as workforce skills and user awareness, which individual businesses may be reluctant to provide, because of the costs involved and because in a competitive market they will be unsure that they (rather than competitors) will capture the benefits and secure a return on their investment. In addition, where modern energy access is not affordable on a purely private financed basis or public financial input is needed to support the costs of early market development, a public-private partnership delivery model will be needed. Grid-connected mini-grids can, in theory, provide any level of electricity supply, but in most cases if the investment is made for grid connection and associated standards are met, they  provide a grid-equivalent service, meeting all household, commercial, industrial and community requirements (Tier 5). (If the grid system itself is over-stretched with inadequate generation; or insufficiently robust or poorly maintained transmission and distribution systems reliability and quality of supply may deteriorate so that while users have a physical connection, they may not in fact have reliable access to electricity (bringing the supply Tier 3 or lower). To the extent that a grid-connected mini-grid draws on electricity from the grid its construction should be coupled with development of additional centralized generation capacity to support the resulting additional demand.


Further Information and Guidance



Relevant Case Studies


None of the examples examined have had a purely private sector delivery models (ie no public involvement in either ownership or funding).


►Go to Top


Public-Private Partnership

Definition

Delivery of electricity access by an entity which is part publically and part privately owned or by a mix of publically and privately owned entities or using a combination of public and private finance

This includes cases where:

  • a joint venture has been created between a state-owned organisation and a private company to provide electricity
  • one or more state-owned organisation fill some of the functions along the market chain1, while others are filled by private businesses
  • electricity provision is undertaken by private businesses with public financial support (subsidies, grants, loans etc)    


Interactions with other NAE Categories


Technology


Public-private models for grid systems might include:

  • Publically owned generation and transmission combined with privately owned distribution;
  • Independent Power Producers (IPPs) connected to a publically owned transmission/distribution system;
  • A privately owned grid system using grants from public sources to connect new users.

For grid connected mini-grids and distribution systems:

  • Mini-grids owned by a private developer connected to the (publically-owned) main grid, and thereby drawing on publically owned generation to meet demand;
  • A private company, or public-private joint venture, taking on operation of a section of the publically-owned grid distribution system;
  • Public grants or subsidies supporting development of a privately-owned mini-grid or distribution system.

For isolated mini-grids:

  • Mini-grids developed on a Build-Own-Operate-Transfer basis (initially owned and operated by a private developer, but transferred to public ownership at the end of a concession period);
  • Mini-grids built and operated by a public-private joint venture;
  • Public grants or subsidies supporting development of a privately-owned mini-grid.

Use of public finance (grants, subsidies and loans) to enhance affordability and support market growth often results in a public-private model for standalone systems, even when there is a purely private-sector chain of manufacturers, importers, distributors and retailers. There could also be benefits in some circumstances from government energy agencies becoming directly involved in the standalone system market, by forming a joint entity to supply systems or by taking on one of the roles along the value chain (eg providing a distribution service for all system providers), as a means of supporting market development.


Legal Basis


Because a public-private model involves private ownership and investment, an explicit legal framework will be required for any form of electrification which involves significant long-term capital investment in order to attract private finance and allow for price regulation to protect users. A concession, which offers protection from competition, will provide the greatest attraction for private financiers. Where no long-term capital investment is involved, as with standalone systems sold directly to users, no legal control (beyond that for any business) may be necessary – however if there is partial public sector ownership, a transparent legal framework may be required to convince private market participants that they are not facing unfair competition, and also to ensure that any public finance is not being misused. 


Price/Tariff Regulation


Where significant capital investment is involved, a transparent framework for price/tariff regulation is likely to be required to attract the private element into any public-private partnership. Tariff regulation will also protect users and provide a means of ensuring that public finance is not being misused or exploited by the private sector. It may also demonstrate to private market participants that they are not facing unfair competition from partially publically-owned market participants. 


Finance


All public-private partnerships will involve a combination of private and public finance. Private finance will come through ownership and investment in, and loans to electricity providers. Public finance may come through these routes, but may also be through various forms of grant, subsidy, tax exemption or guarantee. Ultimately public-private models, like other forms of electricity provision, will rely on connection and ongoing charges, and standalone system purchases from users. For multi-user systems (grids and mini-grids) there is also likely to be some element of cross-subsidy between users. 


Non-Financial Interventions


National energy planning is key to establishing the optimum mix of technologies to meet electrification needs across the country, regardless of the delivery model employed. Institutional restructuring may be needed to establish public-private partnerships and capacity building or technical assistance may be required if the key actors lack the capacity to undertake regulatory reform or design arrangements for public financial support.  Awareness raising amongst users and other potential market actors and service providers, as well as training (capacity building) to develop the skilled workforce needed by new energy access businesses can be beneficial alongside financial forms of public support. Public-private partnership may also provide the means to bring in new technology, with the private sector providing the technology know-how while the public sector bears the risk inherent in new technology which private investors may be reluctant to take on. 


Advantages and Disadvantages (Including Level of Electricity Provided)


Public-Private partnerships offer the potential to combine the benefits of both models, with public security being combined with private efficiency, innovation and flexibility. Bringing in private finance can extend the capacity for electricity provision beyond that which the public sector alone can offer, while public financial support can be used to attract private finance and make electricity affordable for users.  Combining public and private inputs is not, however, simple. Significant expertise is required to ensure that private investment is attracted while making optimum use of public resources. Moreover, the appropriate form of public-private partnership will change as markets develop and levels of electricity access increase – and this must be recognised while at the same time creating regimes which can give the private sector the confidence in the future they require to invest.


Further Information and Guidance



Relevant Case Studies



►Go to Top


References

Authors

Authors: Mary Willcox, Dean Cooper

Acknowledgements

The Review was prepared by Mary Willcox and Dean Cooper of Practical Action Consulting working with Hadley Taylor, Silvia Cabriolu-Poddu and Christina Stuart of the EU Energy Initiative Partnership Dialogue Facility (EUEIPDF) and Michael Koeberlein and Caspar Priesemann of the Energising Development Programme (EnDev). It is based on a literature review, stakeholder consultations. The categorization framework in the review tool is based on the EUEI/PDF / Practical Action publication "Building Energy Access Markets - A Value Chain Analysis of Key Energy Market Systems".

A wider range of stakeholders were consulted during its preparation and we would particularly like to thank the following for their valuable contributions and insights: - Jeff Felten, AfDB - Marcus Wiemann and other members, ARE - Guilherme Collares Pereira, EdP - David Otieno Ochieng, EUEI-PDF - Silvia Luisa Escudero Santos Ascarza, EUEI-PDF - Nico Peterschmidt, Inensus - John Tkacik, REEEP - Khorommbi Bongwe, South Africa: Department of Energy - Rashid Ali Abdallah, African Union Commission - Nicola Bugatti, ECREEE - Getahun Moges Kifle, Ethiopian Energy Authority - Mario Merchan Andres, EUEI-PDF - Tatjana Walter-Breidenstein, EUEI-PDF - Rebecca Symington, Mlinda Foundation - Marcel Raats, RVO.NL - Nico Tyabji, Sunfunder -



NAE Overview Page

Any feedback would be very welcome. If you have any comments or enquires please contact: mary.willcox@practicalaction.org.ukbenjamin.attigah@euei-pdf.org, or caspar.priesemann@giz.de.

Download the Tool as a Power Point: https://energypedia.info/images/a/aa/National_Approaches_to_Electrification_-_Review_of_Options.pptx


►Go to Top