Difference between revisions of "National Approaches to Electrification – Delivery Model"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
 
 
[[File:Back to NAE Overview Page.png|center|800px|NAE Overview Page|alt=NAE Overview Page|link=National Approaches to Electrification – Review of Options]]
 
[[File:Back to NAE Overview Page.png|center|800px|NAE Overview Page|alt=NAE Overview Page|link=National Approaches to Electrification – Review of Options]]
  
Line 7: Line 6:
  
 
----
 
----
<p style="text-align: center;"><span style="color:#316798ff;">'''Delivery Model: The (market) chain of organisations through which electricity is delivered to users'''</span></p>
+
<p style="text-align: center"><span style="color:#316798ff">'''Delivery Model: The (market) chain of organisations through which electricity is delivered to users'''</span></p>
 
----
 
----
  
Line 14: Line 13:
 
= Public<br/> =
 
= Public<br/> =
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 130px; background-color: rgb(0, 156, 204);" |  
+
| style="width: 130px; background-color: rgb(0, 156, 204)" |  
<span style="color:#FFFFFF;"><span style="font-size: 13.6px;">Definition</span></span><br/>
+
<span style="color:#FFFFFF"><span style="font-size: 13.6px">Definition</span></span><br/>
  
| style="width: 618px;" |  
+
| style="width: 618px" |  
 
'''<span></span><span>Delivery of electricity access by an entity or entities all of which are publically owned and managed, using purely public finance.</span><span></span>'''
 
'''<span></span><span>Delivery of electricity access by an entity or entities all of which are publically owned and managed, using purely public finance.</span><span></span>'''
  
Line 28: Line 27:
 
<br/>
 
<br/>
  
== Internactions wiht other NAE Categories ==
+
== Interactions with other NAE Categories ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 152, 203);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(0, 152, 203)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(0, 102, 0);" |  
+
| style="width: 117px; background-color: rgb(0, 102, 0)" |  
 
<font color="#ffffff">Technology</font>
 
<font color="#ffffff">Technology</font>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" |  
+
| style="width: 616px" |  
<span style="color:#FFFFFF;"></span>[[Portal:Grid|National grid]] systems have most often been established under a public delivery model either through a single public electricity company owning and managing the entire system or through separate public generation, transmission and distribution companies. Grid-connected [[Portal:Mini-grid|mini-grids]] and distribution systems may also be publically owned, for instance by a local municipality. Where isolated mini-grids or standalone systems are delivered through a public model this is generally by an electricity utility or distribution company which has adopted an integrated approach with electricity being provided using a combination of grid, mini-grid and standalone systems.<br/>
+
<span style="color:#FFFFFF"></span>[[Portal:Grid|National grid]] systems have most often been established under a public delivery model either through a single public electricity company owning and managing the entire system or through separate public generation, transmission and distribution companies. Grid-connected [[Portal:Mini-grid|mini-grids]] and distribution systems may also be publically owned, for instance by a local municipality. Where isolated mini-grids or standalone systems are delivered through a public model this is generally by an electricity utility or distribution company which has adopted an integrated approach with electricity being provided using a combination of grid, mini-grid and standalone systems.<br/>
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 152, 203);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(0, 152, 203)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(154, 103, 0);" |  
+
| style="width: 117px; background-color: rgb(154, 103, 0)" |  
<span style="color:#FFFFFF;"></span><span style="color:#FFFFFF;">Legual Basis</span><span style="color:#FFFFFF;"></span><br/>
+
<span style="color:#FFFFFF"></span><span style="color:#FFFFFF">Legal Basis</span><span style="color:#FFFFFF"></span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
 
Regulation of public delivery models is often implicit, with oversight and control being through organisational hierarchy rather than any explicit regulatory framework. For instance a national utility company’s monopoly (concession) over generation and/or sale of electricity may be established through the legislation under which it is created rather than through any separate framework. However, though an explicit regulatory framework may not be needed to give private investors confidence, such a framework is nevertheless regarded as best practice to achieve transparency and provide a barrier to political interference.
 
Regulation of public delivery models is often implicit, with oversight and control being through organisational hierarchy rather than any explicit regulatory framework. For instance a national utility company’s monopoly (concession) over generation and/or sale of electricity may be established through the legislation under which it is created rather than through any separate framework. However, though an explicit regulatory framework may not be needed to give private investors confidence, such a framework is nevertheless regarded as best practice to achieve transparency and provide a barrier to political interference.
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 152, 203);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(0, 152, 203)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(205, 52, 0);" |  
+
| style="width: 117px; background-color: rgb(205, 52, 0)" |  
<span style="color:#FFFFFF;"></span><span style="color:#FFFFFF;">Price/Tariff Regulation</span><span style="color:#FFFFFF;"></span><br/>
+
<span style="color:#FFFFFF"></span><span style="color:#FFFFFF">Price/Tariff Regulation</span><span style="color:#FFFFFF"></span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
 
<span>Where electricity is delivered through public models, with no need to attract private investment, there is also a temptation to manage prices by means of the organisational hierarchy. However, without independent regulation, there is a risk that political pressure will result in prices being depressed below cost-recovery levels leading to insolvency of the electricity providers and deterioration of the electricity provision.</span><span></span>
 
<span>Where electricity is delivered through public models, with no need to attract private investment, there is also a temptation to manage prices by means of the organisational hierarchy. However, without independent regulation, there is a risk that political pressure will result in prices being depressed below cost-recovery levels leading to insolvency of the electricity providers and deterioration of the electricity provision.</span><span></span>
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 152, 203);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(0, 152, 203)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(32, 56, 100);" |  
+
| style="width: 117px; background-color: rgb(32, 56, 100)" |  
<span style="color:#FFFFFF;">Finance</span><span style="color:#FFFFFF;"></span><br/>
+
<span style="color:#FFFFFF">Finance</span><span style="color:#FFFFFF"></span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
<span>By definition, a public delivery model will use public [[Portal:Financing_and_Funding|finance]]– by publically-owned utility companies or national or local government, potentially supported by loans and grants from international agencies - (since any private finance would cause the delivery model to be categorized as a public-private partnership). In addition public delivery models will draw on finance from users, through standalone system purchases, connection charges and ongoing charges, and for multi-user systems ([[Portal:Grid|grids]]&nbsp;and [[Portal:Mini-grid|mini-grids]]) there is likely to be some element of cross-subsidy between users.</span><span></span>
+
<span>By definition, a public delivery model will use public [[Portal:Financing and Funding|finance]]– by publically-owned utility companies or national or local government, potentially supported by loans and grants from international agencies - (since any private finance would cause the delivery model to be categorized as a public-private partnership). In addition public delivery models will draw on finance from users, through standalone system purchases, connection charges and ongoing charges, and for multi-user systems ([[Portal:Grid|grids]]&nbsp;and [[Portal:Mini-grid|mini-grids]]) there is likely to be some element of cross-subsidy between users.</span><span></span>
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 152, 203);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(0, 152, 203)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(0, 100, 100);" |  
+
| style="width: 117px; background-color: rgb(0, 100, 100)" |  
<span style="color:#FFFFFF;"></span><span style="color:#FFFFFF;">Non-Financial Interventions</span><span style="color:#FFFFFF;"></span><br/>
+
<span style="color:#FFFFFF"></span><span style="color:#FFFFFF">Non-Financial Interventions</span><span style="color:#FFFFFF"></span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" |  
+
| style="width: 616px" |  
 
National energy planning is key to establishing the optimum mix of technologies to meet electrification needs across the country, regardless of the delivery model employed. Institutional restructuring and capacity building or technical assistance may be needed where the key actors involved in public delivery models lack capacity is aspects of electrification. Technology development/adoption and adoption of appropriate technical standards, user awareness raising and demand promotion may be needed to increase revenues and make electricity access economically sustainable, regardless of the delivery model chosen.
 
National energy planning is key to establishing the optimum mix of technologies to meet electrification needs across the country, regardless of the delivery model employed. Institutional restructuring and capacity building or technical assistance may be needed where the key actors involved in public delivery models lack capacity is aspects of electrification. Technology development/adoption and adoption of appropriate technical standards, user awareness raising and demand promotion may be needed to increase revenues and make electricity access economically sustainable, regardless of the delivery model chosen.
  
Line 87: Line 86:
 
== Advantages and Disadvantages ==
 
== Advantages and Disadvantages ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 152, 203);" | <br/>
+
| style="width: 10px; background-color: rgb(0, 152, 203)" | <br/>
 
|  
 
|  
A public delivery model has the advantage of making use of existing institutions. Where these organisations have strong capabilities and are efficient, a public delivery model may allow strongly focussed and effective delivery of electrification and good coordination of [[Portal:Grid|grid]], [[Portal:Mini-grid|mini-grid]] and stand-alone solutions. However public organisations are often monolithic and slow moving. They may be more focussed on managing existing assets than serving new consumers, particularly in remote rural areas, and they may lack the capabilities needed to deliver new forms of electricity access. They are also vulnerable to political pressure and interference, which can hamper electrification efforts and result in poor allocation of resources. Following a private sector or private-public partnership model can allow private sector [[Portal:Financing_and_Funding|finance]]&nbsp;and skills to be brought to bear and may achieve greater flexibility, speed and efficiency.
+
A public delivery model has the advantage of making use of existing institutions. Where these organisations have strong capabilities and are efficient, a public delivery model may allow strongly focused and effective delivery of electrification and good coordination of [[Portal:Grid|grid]], [[Portal:Mini-grid|mini-grid]] and stand-alone solutions. However public organisations are often monolithic and slow moving. They may be more focused on managing existing assets than serving new consumers, particularly in remote rural areas, and they may lack the capabilities needed to deliver new forms of electricity access. They are also vulnerable to political pressure and interference, which can hamper electrification efforts and result in poor allocation of resources. Following a private sector or private-public partnership model can allow private sector [[Portal:Financing and Funding|finance]]&nbsp;and skills to be brought to bear and may achieve greater flexibility, speed and efficiency.
  
 
|}
 
|}
Line 99: Line 98:
 
== Further Information and Guidance ==
 
== Further Information and Guidance ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 152, 203);" | <br/>
+
| style="width: 10px; background-color: rgb(0, 152, 203)" | <br/>
 
|  
 
|  
 
*Barnes, D. (2007). The Challenge of Rural Electrification: Strategies for Developing Countries. Book Chapter [https://books.google.co.uk/books?id=iOBi17Pr3fIC&printsec=frontcover&source=gbs_ge_summary_r&cad=0 https://][https://books.google.co.uk/books?id=iOBi17Pr3fIC&printsec=frontcover&source=gbs_ge_summary_r&cad=0 books.google.co.uk/books?id=iOBi17Pr3fIC&printsec=frontcover&source=gbs_ge_summary_r&cad=0#v=onepage&q&f=false]
 
*Barnes, D. (2007). The Challenge of Rural Electrification: Strategies for Developing Countries. Book Chapter [https://books.google.co.uk/books?id=iOBi17Pr3fIC&printsec=frontcover&source=gbs_ge_summary_r&cad=0 https://][https://books.google.co.uk/books?id=iOBi17Pr3fIC&printsec=frontcover&source=gbs_ge_summary_r&cad=0 books.google.co.uk/books?id=iOBi17Pr3fIC&printsec=frontcover&source=gbs_ge_summary_r&cad=0#v=onepage&q&f=false]
Line 111: Line 110:
 
<br/>
 
<br/>
  
== Relevante Case Studies ==
+
== Relevant Case Studies ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 152, 203);" | <br/>
+
| style="width: 10px; background-color: rgb(0, 152, 203)" | <br/>
 
|  
 
|  
 
*[[NAE Case Study: Brazil, Luz para Todos (Light for All)|Brazil, Luz para Todos (Light for All)]]<br/>
 
*[[NAE Case Study: Brazil, Luz para Todos (Light for All)|Brazil, Luz para Todos (Light for All)]]<br/>
Line 132: Line 131:
 
= Private (Non-Government) =
 
= Private (Non-Government) =
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 130px; background-color: rgb(0, 204, 248);" |  
+
| style="width: 130px; background-color: rgb(0, 204, 248)" |  
'''<span style="color:#FFFFFF;"><span style="font-size: 13.6px;">Definition</span></span>'''<br/>
+
'''<span style="color:#FFFFFF"><span style="font-size: 13.6px">Definition</span></span>'''<br/>
  
| style="width: 618px;" |  
+
| style="width: 618px" |  
 
'''<span><span></span></span><span><span>Delivery of electricity access by an entity or entities none of which are owned and managed by the state, using purely private finance.</span></span><span><span></span></span>'''
 
'''<span><span></span></span><span><span>Delivery of electricity access by an entity or entities none of which are owned and managed by the state, using purely private finance.</span></span><span><span></span></span>'''
  
Line 146: Line 145:
 
<br/>
 
<br/>
  
== Internactions wiht other NAE Categories ==
+
== Interactions with other NAE Categories ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 204, 248);" | <br/>
+
| style="width: 10px; background-color: rgb(0, 204, 248)" | <br/>
| style="width: 117px; background-color: rgb(0, 103, 0);" |  
+
| style="width: 117px; background-color: rgb(0, 103, 0)" |  
<span style="color:#FFFFFF;">Technology</span><br/>
+
<span style="color:#FFFFFF">Technology</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
Few, if any, national [[Portal:Grid|grid]]&nbsp;systems have been established through a private delivery model (though in many countries privatisation has been used to transfer them into private ownership and bring in private investment). Grid-connected [[Portal:Mini-grid|mini-grids]] and distribution systems have frequently been developed by private (non-state-owned) organisations. Where the grid system is also privately-owned, this constitutes a private model. (However, if the grid system is publically owned, and the mini-grid or distribution system uses electricity from the grid system, or the development draws on public grants, subsidies, loans, tax exemptions or guarantees, it constitutes a public-private partnership). The most frequently used models for delivery of standalone systems are private, though involvement of state-organisations along the market chain, or use of funding from grants or subsidies provided by the state, donors or international agencies, may result in private-public partnerships.
+
Few, if any, national [[Portal:Grid|grid]]&nbsp;systems have been established through a private delivery model (though in many countries privatisation has been used to transfer them into private ownership and bring in private investment). Grid-connected [[Portal:Mini-grid|mini-grids]] and distribution systems have frequently been developed by private (non-state-owned) organisations. Where the grid system is also privately-owned, this constitutes a private model. (However, if the grid system is publically owned, and the mini-grid or distribution system uses electricity from the grid system, or the development draws on public grants, subsidies, loans, tax exemptions or guarantees, it constitutes a public-private partnership). The most frequently used models for delivery of standalone systems are private, through the involvement of state-organisations along the market chain, or use of funding from grants or subsidies provided by the state, donors or international agencies, may result in private-public partnerships.
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 204, 248);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(0, 204, 248)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(154, 103, 0);" |  
+
| style="width: 117px; background-color: rgb(154, 103, 0)" |  
<span style="color:#FFFFFF;">Legual Basis</span><br/>
+
<span style="color:#FFFFFF">Legal Basis</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
A private delivery model calls for an explicit legal framework for any form of electrification which involves significant long-term capital investment ([[Portal:Grid|grid]], [[Portal:Mini-grid|mini-grids]] and potentially standalone systems which are charged for on a pay-as-you-go basis) in order to attract private [[Portal:Financing_and_Funding|finance]]&nbsp;and allow for price regulation to protect users. A concession, which offers protection from competition, will provide the greatest attraction for private financiers. Where no long-term capital investment is involved, as with standalone systems sold directly to users, it’s generally considered that no legal control (beyond that for any business) is necessary.&nbsp;<br/>
+
A private delivery model calls for an explicit legal framework for any form of electrification which involves significant long-term capital investment ([[Portal:Grid|grid]], [[Portal:Mini-grid|mini-grids]] and potentially standalone systems which are charged for on a pay-as-you-go basis) in order to attract private [[Portal:Financing and Funding|finance]]&nbsp;and allow for price regulation to protect users. A concession, which offers protection from competition, will provide the greatest attraction for private financiers. Where no long-term capital investment is involved, as with standalone systems sold directly to users, it’s generally considered that no legal control (beyond that for any business) is necessary.&nbsp;<br/>
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 204, 248);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(0, 204, 248)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(205, 52, 0);" |  
+
| style="width: 117px; background-color: rgb(205, 52, 0)" |  
<span style="color:#FFFFFF;">Price/Tariff Regulation</span><br/>
+
<span style="color:#FFFFFF">Price/Tariff Regulation</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
Where electricity is delivered by the private sector, using purely private [[Portal:Financing_and_Funding|finance]], in a competitive market with no legal or effective monopoly (eg where several [[Basic Energy Services - Solar PV (SHS, Solar Lanterns)|solar lanterns]] providers are operating) price regulation may be regarded as unnecessary. However, where any form of concession has been granted (or exists in practice), price regulation would be expected to protect users. On the other side, where significant capital investment is involved private financiers are likely to require a transparent framework for price/tariff regulation, to reduce the risk of price controls being introduced in the future at below cost-recovery levels and preventing full recovery of and return on investment.
+
Where electricity is delivered by the private sector, using purely private [[Portal:Financing and Funding|finance]], in a competitive market with no legal or effective monopoly (eg where several [[Basic Energy Services - Solar PV (SHS, Solar Lanterns)|solar lanterns]] providers are operating) price regulation may be regarded as unnecessary. However, where any form of concession has been granted (or exists in practice), price regulation would be expected to protect users. On the other side, where significant capital investment is involved private financiers are likely to require a transparent framework for price/tariff regulation, to reduce the risk of price controls being introduced in the future at below cost-recovery levels and preventing full recovery of and return on investment.
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 204, 248);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(0, 204, 248)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(32, 56, 100);" |  
+
| style="width: 117px; background-color: rgb(32, 56, 100)" |  
<span style="color:#FFFFFF;">Finance</span><br/>
+
<span style="color:#FFFFFF">Finance</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
As discussed above a private delivery model must be purely privately [[Portal:Financing_and_Funding|financed]]&nbsp;(since inclusion of any public finance would cause the delivery model to be categorized as a public-private partnership). Ultimately private delivery models will rely on connection and ongoing charges, and standalone system purchases from users. For multi-user systems ([[Portal:Grid|grids]]&nbsp;and [[Portal:Mini-grid|mini-grids]]) there is also likely to be some element of cross-subsidy between users.<span style="font-size: 13.6px;">&nbsp;</span>
+
As discussed above a private delivery model must be purely privately [[Portal:Financing and Funding|financed]]&nbsp;(since inclusion of any public finance would cause the delivery model to be categorized as a public-private partnership). Ultimately private delivery models will rely on connection and ongoing charges, and standalone system purchases from users. For multi-user systems ([[Portal:Grid|grids]]&nbsp;and [[Portal:Mini-grid|mini-grids]]) there is also likely to be some element of cross-subsidy between users.<span style="font-size: 13.6px">&nbsp;</span>
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 204, 248);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(0, 204, 248)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(0, 100, 100);" |  
+
| style="width: 117px; background-color: rgb(0, 100, 100)" |  
<span style="color:#FFFFFF;">Non-Financial Interventions</span><br/>
+
<span style="color:#FFFFFF">Non-Financial Interventions</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" |  
+
| style="width: 616px" |  
 
National energy planning is key to establishing the optimum mix of technologies to meet electrification needs across the country, regardless of the delivery model employed. Institutional restructuring and capacity building or technical assistance may be needed where the key actors lack the capacity to undertake regulatory reform in order to establish the legal and regulatory framework for private electrification, or to set and implement technical and quality standards (needed where the private sector is delivering access through mini-grids or distribution systems to ensure safety and compatibility between systems, and to support user confidence). Awareness raising amongst users and other potential market actors and service providers, as well as training (capacity building) to develop the skilled workforce needed by new energy access businesses are likely to be particularly relevant under a private delivery model, and demand promotion may be needed to increase revenues and make electricity access economically sustainable. Private delivery models are often a means of introducing new technologies, with private sector players bringing in technologies which they believe will have advantages over existing options which will allow them to grow their businesses. (Such new technology introduction, however, brings risks, and the private sector will expect to reap additional returns to balance these risks).
 
National energy planning is key to establishing the optimum mix of technologies to meet electrification needs across the country, regardless of the delivery model employed. Institutional restructuring and capacity building or technical assistance may be needed where the key actors lack the capacity to undertake regulatory reform in order to establish the legal and regulatory framework for private electrification, or to set and implement technical and quality standards (needed where the private sector is delivering access through mini-grids or distribution systems to ensure safety and compatibility between systems, and to support user confidence). Awareness raising amongst users and other potential market actors and service providers, as well as training (capacity building) to develop the skilled workforce needed by new energy access businesses are likely to be particularly relevant under a private delivery model, and demand promotion may be needed to increase revenues and make electricity access economically sustainable. Private delivery models are often a means of introducing new technologies, with private sector players bringing in technologies which they believe will have advantages over existing options which will allow them to grow their businesses. (Such new technology introduction, however, brings risks, and the private sector will expect to reap additional returns to balance these risks).
  
Line 205: Line 204:
 
== Advantages and Disadvantages ==
 
== Advantages and Disadvantages ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 204, 248);" | <br/>
+
| style="width: 10px; background-color: rgb(0, 204, 248)" | <br/>
 
|  
 
|  
The private sector is widely seen as being more efficient, innovative flexible and nimble that the public sector and it is these virtues that it brings to energy access provision. Use of a private delivery model can be a way of bringing private sector skills and [[Portal:Financing_and_Funding|finance]]&nbsp;(both national and international), and the benefits of competition into the energy sector. Where public institutions are weak and ineffective, private delivery models may seem attractive, but it must be recognised that successful private delivery relies (particularly for [[Portal:Grid|grids]]&nbsp;and [[Portal:Mini-grid|mini-grids]]) on effective public management including strong regulatory frameworks and this calls for capabilities within public institutions which they may lack. There are also elements needed for the private sector to deliver, such as workforce skills and user awareness, which individual businesses may be reluctant to provide, because of the costs involved and because in a competitive market&nbsp;<span style="font-size: 13.6px;">they will be unsure that they (rather than competitors) will capture the benefits and secure a return on their investment.&nbsp;</span><span style="font-size: 13.6px;">In addition, where modern energy access is not affordable on a purely private financed basis or public financial input is&nbsp;</span><span style="font-size: 13.6px;">needed to support the costs of early market development, a public-private partnership delivery model will be needed.&nbsp;</span><span style="font-size: 13.6px;">Grid-connected mini-grids can, in theory, provide any level of electricity supply, but in most cases if the investment is made for grid connection and associated standards are met, they&nbsp; provide a grid-equivalent service, meeting all household, commercial, industrial and community requirements (Tier 5). (If the grid system itself is over-stretched with inadequate generation; or insufficiently robust or poorly maintained transmission and distribution systems reliability and quality of supply may deteriorate so that while users have a physical connection, they may not in fact have reliable access to electricity (bringing the supply Tier 3 or lower). To the extent that a grid-connected mini-grid draws on electricity from the grid its construction should be coupled with development of additional centralized generation capacity to support the resulting additional demand.</span>
+
The private sector is widely seen as being more efficient, innovative flexible and nimble that the public sector and it is these virtues that it brings to energy access provision. Use of a private delivery model can be a way of bringing private sector skills and [[Portal:Financing and Funding|finance]]&nbsp;(both national and international), and the benefits of competition into the energy sector. Where public institutions are weak and ineffective, private delivery models may seem attractive, but it must be recognised that successful private delivery relies (particularly for [[Portal:Grid|grids]]&nbsp;and [[Portal:Mini-grid|mini-grids]]) on effective public management including strong regulatory frameworks and this calls for capabilities within public institutions which they may lack. There are also elements needed for the private sector to deliver, such as workforce skills and user awareness, which individual businesses may be reluctant to provide, because of the costs involved and because in a competitive market&nbsp;<span style="font-size: 13.6px">they will be unsure that they (rather than competitors) will capture the benefits and secure a return on their investment.&nbsp;</span><span style="font-size: 13.6px">In addition, where modern energy access is not affordable on a purely private financed basis or public financial input is&nbsp;</span><span style="font-size: 13.6px">needed to support the costs of early market development, a public-private partnership delivery model will be needed.&nbsp;</span><span style="font-size: 13.6px">Grid-connected mini-grids can, in theory, provide any level of electricity supply, but in most cases if the investment is made for grid connection and associated standards are met, they&nbsp; provide a grid-equivalent service, meeting all household, commercial, industrial and community requirements (Tier 5). (If the grid system itself is over-stretched with inadequate generation; or insufficiently robust or poorly maintained transmission and distribution systems reliability and quality of supply may deteriorate so that while users have a physical connection, they may not in fact have reliable access to electricity (bringing the supply Tier 3 or lower). To the extent that a grid-connected mini-grid draws on electricity from the grid its construction should be coupled with development of additional centralized generation capacity to support the resulting additional demand.</span>
  
 
|}
 
|}
Line 217: Line 216:
 
== Further Information and Guidance ==
 
== Further Information and Guidance ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 204, 248);" | <br/>
+
| style="width: 10px; background-color: rgb(0, 204, 248)" | <br/>
| style="width: 735px;" |  
+
| style="width: 735px" |  
 
*IRENA (2016), Policies and regulations to support renewable energy mini-grid development through private sector involvement [https://policy.practicalaction.org/policy-themes/energy/poor-peoples-energy-outlook/poor-people-s-energy-outlook-2016 https://policy.practicalaction.org/policy-themes/energy/poor-peoples-energy-outlook/poor-people-s-energy-outlook-2016]
 
*IRENA (2016), Policies and regulations to support renewable energy mini-grid development through private sector involvement [https://policy.practicalaction.org/policy-themes/energy/poor-peoples-energy-outlook/poor-people-s-energy-outlook-2016 https://policy.practicalaction.org/policy-themes/energy/poor-peoples-energy-outlook/poor-people-s-energy-outlook-2016]
 
*Practical Action, ODI, Solar Aid, GOGLA. (2016). Accelerating Access to Electricity in Africa with Off-grid Solar [https://policy.practicalaction.org/policy-themes/energy/off-grid-solar https://policy.practicalaction.org/policy-themes/energy/off-grid-solar]<br/>
 
*Practical Action, ODI, Solar Aid, GOGLA. (2016). Accelerating Access to Electricity in Africa with Off-grid Solar [https://policy.practicalaction.org/policy-themes/energy/off-grid-solar https://policy.practicalaction.org/policy-themes/energy/off-grid-solar]<br/>
Line 231: Line 230:
 
<br/>
 
<br/>
  
== Relevante Case Studies ==
+
== Relevant Case Studies ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(0, 204, 248);" | <br/>
+
| style="width: 10px; background-color: rgb(0, 204, 248)" | <br/>
 
|  
 
|  
 
None of the examples examined have had a purely private sector delivery models (ie no public involvement in either ownership or funding).
 
None of the examples examined have had a purely private sector delivery models (ie no public involvement in either ownership or funding).
Line 249: Line 248:
 
= Public-Private Partnership =
 
= Public-Private Partnership =
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 130px; background-color: rgb(100, 203, 248);" |  
+
| style="width: 130px; background-color: rgb(100, 203, 248)" |  
'''<span style="color:#FFFFFF;"><span style="font-size: 13.6px;">Definition</span></span>'''<br/>
+
'''<span style="color:#FFFFFF"><span style="font-size: 13.6px">Definition</span></span>'''<br/>
  
| style="width: 618px;" |  
+
| style="width: 618px" |  
 
'''Delivery of electricity access by an entity which is part publically and part privately owned or by a mix of publically and privately owned entities or using a combination of public and private finance'''<br/>
 
'''Delivery of electricity access by an entity which is part publically and part privately owned or by a mix of publically and privately owned entities or using a combination of public and private finance'''<br/>
  
Line 261: Line 260:
 
*a joint venture has been created between a state-owned organisation and a private company to provide electricity<br/>
 
*a joint venture has been created between a state-owned organisation and a private company to provide electricity<br/>
 
*one or more state-owned organisation fill some of the functions along the market chain1, while others are filled by private businesses<br/>
 
*one or more state-owned organisation fill some of the functions along the market chain1, while others are filled by private businesses<br/>
*electricity provision is undertaken by private businesses with public [[Portal:Financing_and_Funding|financial]]&nbsp;support (subsidies, grants, loans etc)&nbsp; &nbsp;&nbsp;
+
*electricity provision is undertaken by private businesses with public [[Portal:Financing and Funding|financial]]&nbsp;support (subsidies, grants, loans etc)&nbsp; &nbsp;&nbsp;
  
 
|}
 
|}
Line 267: Line 266:
 
<br/>
 
<br/>
  
== Internactions wiht other NAE Categories ==
+
== Interactions with other NAE Categories ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(100, 203, 248);" | <br/>
+
| style="width: 10px; background-color: rgb(100, 203, 248)" | <br/>
| style="width: 117px; background-color: rgb(0, 101, 0);" |  
+
| style="width: 117px; background-color: rgb(0, 101, 0)" |  
<span style="color:#FFFFFF;">Technology</span><br/>
+
<span style="color:#FFFFFF">Technology</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
 
Public-private models for [[Portal:Grid|grid]]&nbsp;systems might include:
 
Public-private models for [[Portal:Grid|grid]]&nbsp;systems might include:
  
 
*Publically owned generation and transmission combined with privately owned distribution;<br/>
 
*Publically owned generation and transmission combined with privately owned distribution;<br/>
 
*Independent Power Producers (IPPs) connected to a publically owned transmission/distribution system;<br/>
 
*Independent Power Producers (IPPs) connected to a publically owned transmission/distribution system;<br/>
*<span style="font-size: 13.6px;">A privately owned grid system using grants from public sources to connect new users.</span>
+
*<span style="font-size: 13.6px">A privately owned grid system using grants from public sources to connect new users.</span>
  
<span style="font-size: 13.6px;">For grid connected [[Portal:Mini-grid|mini-grids]]&nbsp;and distribution systems:</span><br/>
+
<span style="font-size: 13.6px">For grid connected [[Portal:Mini-grid|mini-grids]]&nbsp;and distribution systems:</span><br/>
  
 
*Mini-grids owned by a private developer connected to the (publically-owned) main grid, and thereby drawing on publically owned generation to meet demand;<br/>
 
*Mini-grids owned by a private developer connected to the (publically-owned) main grid, and thereby drawing on publically owned generation to meet demand;<br/>
Line 296: Line 295:
 
*Public grants or subsidies supporting development of a privately-owned mini-grid.
 
*Public grants or subsidies supporting development of a privately-owned mini-grid.
  
Use of public [[Portal:Financing_and_Funding|finance]]&nbsp;(grants, subsidies and loans) to enhance affordability and support market growth often results in a public-private model for standalone systems, even when there is a purely private-sector chain of manufacturers, importers, distributors and retailers. There could also be benefits in some circumstances from government energy agencies becoming directly involved in the standalone system market, by forming a joint entity to supply systems or by taking on one of the roles along the value chain (eg providing a distribution service for all system providers), as a means of supporting market development.
+
Use of public [[Portal:Financing and Funding|finance]]&nbsp;(grants, subsidies and loans) to enhance affordability and support market growth often results in a public-private model for standalone systems, even when there is a purely private-sector chain of manufacturers, importers, distributors and retailers. There could also be benefits in some circumstances from government energy agencies becoming directly involved in the standalone system market, by forming a joint entity to supply systems or by taking on one of the roles along the value chain (eg providing a distribution service for all system providers), as a means of supporting market development.
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(100, 203, 248);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(100, 203, 248)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(154, 103, 0);" |  
+
| style="width: 117px; background-color: rgb(154, 103, 0)" |  
<span style="color:#FFFFFF;">Legual Basis</span><br/>
+
<span style="color:#FFFFFF">Legal Basis</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
Because a public-private model involves private ownership and investment, an explicit legal framework will be required for any form of electrification which involves significant long-term capital investment in order to attract private [[Portal:Financing_and_Funding|finance]]&nbsp;and allow for price regulation to protect users. A concession, which offers protection from competition, will provide the greatest attraction for private financiers. Where no long-term capital investment is involved, as with standalone systems sold directly to users, no legal control (beyond that for any business) may be necessary – however if there is partial public sector ownership, a transparent legal framework&nbsp;<span style="font-size: 13.6px;">may be required to convince private market participants that they are not facing unfair competition, and also to ensure that&nbsp;</span><span style="font-size: 13.6px;">any public finance is not being misused.&nbsp;</span>
+
Because a public-private model involves private ownership and investment, an explicit legal framework will be required for any form of electrification which involves significant long-term capital investment in order to attract private [[Portal:Financing and Funding|finance]]&nbsp;and allow for price regulation to protect users. A concession, which offers protection from competition, will provide the greatest attraction for private financiers. Where no long-term capital investment is involved, as with standalone systems sold directly to users, no legal control (beyond that for any business) may be necessary – however if there is partial public sector ownership, a transparent legal framework&nbsp;<span style="font-size: 13.6px">may be required to convince private market participants that they are not facing unfair competition, and also to ensure that&nbsp;</span><span style="font-size: 13.6px">any public finance is not being misused.&nbsp;</span>
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(100, 203, 248);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(100, 203, 248)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(205, 52, 0);" |  
+
| style="width: 117px; background-color: rgb(205, 52, 0)" |  
<span style="color:#FFFFFF;">Price/Tariff Regulation</span><br/>
+
<span style="color:#FFFFFF">Price/Tariff Regulation</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
Where significant capital investment is involved, a transparent framework for price/tariff regulation is likely to be required to attract the private element into any public-private partnership. Tariff regulation will also protect users and provide a means of ensuring that public [[Portal:Financing_and_Funding|finance]]&nbsp;is not being misused or exploited by the private sector. It may also demonstrate to private market participants that they are not facing unfair competition from partially publically-owned market participants.&nbsp;
+
Where significant capital investment is involved, a transparent framework for price/tariff regulation is likely to be required to attract the private element into any public-private partnership. Tariff regulation will also protect users and provide a means of ensuring that public [[Portal:Financing and Funding|finance]]&nbsp;is not being misused or exploited by the private sector. It may also demonstrate to private market participants that they are not facing unfair competition from partially publically-owned market participants.&nbsp;
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(100, 203, 248);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(100, 203, 248)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(32, 56, 100);" |  
+
| style="width: 117px; background-color: rgb(32, 56, 100)" |  
<span style="color:#FFFFFF;">Finance</span><br/>
+
<span style="color:#FFFFFF">Finance</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" | <span style="color:#FFFFFF;"></span>
+
| style="width: 616px" | <span style="color:#FFFFFF"></span>
All public-private partnerships will involve a combination of private and public [[Portal:Financing_and_Funding|finance]]. Private finance will come through ownership and investment in, and loans to electricity providers. Public finance may come through these routes, but may also be through various forms of grant, subsidy, tax exemption or guarantee. Ultimately public-private models, like other forms of electricity provision, will rely on connection and ongoing charges, and standalone system purchases from users. For multi-user systems ([[Portal:Grid|grids]]&nbsp;and [[Portal:Mini-grid|mini-grids]]) there is also likely to be some element of cross-subsidy between users.&nbsp;
+
All public-private partnerships will involve a combination of private and public [[Portal:Financing and Funding|finance]]. Private finance will come through ownership and investment in, and loans to electricity providers. Public finance may come through these routes, but may also be through various forms of grant, subsidy, tax exemption or guarantee. Ultimately public-private models, like other forms of electricity provision, will rely on connection and ongoing charges, and standalone system purchases from users. For multi-user systems ([[Portal:Grid|grids]]&nbsp;and [[Portal:Mini-grid|mini-grids]]) there is also likely to be some element of cross-subsidy between users.&nbsp;
  
 
|-
 
|-
| style="width: 10px; background-color: rgb(100, 203, 248);" | <span style="color:#FFFFFF;"></span><br/>
+
| style="width: 10px; background-color: rgb(100, 203, 248)" | <span style="color:#FFFFFF"></span><br/>
| style="width: 117px; background-color: rgb(0, 100, 100);" |  
+
| style="width: 117px; background-color: rgb(0, 100, 100)" |  
<span style="color:#FFFFFF;">Non-Financial Interventions</span><br/>
+
<span style="color:#FFFFFF">Non-Financial Interventions</span><br/>
  
 
<br/>
 
<br/>
  
| style="width: 616px;" |  
+
| style="width: 616px" |  
National energy planning is key to establishing the optimum mix of technologies to meet electrification needs across the country, regardless of the delivery model employed. Institutional restructuring may be needed to establish public-private partnerships and capacity building or technical assistance may be required if the key actors lack the capacity to undertake regulatory reform or design arrangements for public [[Portal:Financing_and_Funding|financial]]&nbsp;support.&nbsp; Awareness raising amongst users and other potential market actors and service providers, as well as training (capacity building) to develop the skilled workforce needed by new energy access businesses can be beneficial alongside financial forms of public support. Public-private partnership may also provide the means to bring in new technology, with the private sector providing the technology know-how while the public sector bears the risk inherent in new technology which private investors may be reluctant to take on.&nbsp;<br/>
+
National energy planning is key to establishing the optimum mix of technologies to meet electrification needs across the country, regardless of the delivery model employed. Institutional restructuring may be needed to establish public-private partnerships and capacity building or technical assistance may be required if the key actors lack the capacity to undertake regulatory reform or design arrangements for public [[Portal:Financing and Funding|financial]]&nbsp;support.&nbsp; Awareness raising amongst users and other potential market actors and service providers, as well as training (capacity building) to develop the skilled workforce needed by new energy access businesses can be beneficial alongside financial forms of public support. Public-private partnership may also provide the means to bring in new technology, with the private sector providing the technology know-how while the public sector bears the risk inherent in new technology which private investors may be reluctant to take on.&nbsp;<br/>
  
 
|}
 
|}
Line 344: Line 343:
 
== Advantages and Disadvantages (Including Level of Electricity Provided) ==
 
== Advantages and Disadvantages (Including Level of Electricity Provided) ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(100, 203, 248);" | <br/>
+
| style="width: 10px; background-color: rgb(100, 203, 248)" | <br/>
 
|  
 
|  
Public-Private partnerships offer the potential to combine the benefits of both models, with public security being combined with private efficiency, innovation and flexibility. Bringing in private [[Portal:Financing_and_Funding|finance]]&nbsp;can extend the capacity for electricity provision beyond that which the public sector alone can offer, while public financial support can be used to attract private finance and make electricity affordable for users.&nbsp; Combining public and private inputs is not, however, simple. Significant expertise is required to ensure that private investment is attracted while making optimum use of public resources. Moreover the appropriate form of public-private partnership will change as markets develop and levels of electricity access increase – and this must be recognised while at the same time creating regimes which can give the private sector the confidence in the future they require to invest.
+
Public-Private partnerships offer the potential to combine the benefits of both models, with public security being combined with private efficiency, innovation and flexibility. Bringing in private [[Portal:Financing and Funding|finance]]&nbsp;can extend the capacity for electricity provision beyond that which the public sector alone can offer, while public financial support can be used to attract private finance and make electricity affordable for users.&nbsp; Combining public and private inputs is not, however, simple. Significant expertise is required to ensure that private investment is attracted while making optimum use of public resources. Moreover, the appropriate form of public-private partnership will change as markets develop and levels of electricity access increase – and this must be recognised while at the same time creating regimes which can give the private sector the confidence in the future they require to invest.
  
 
|}
 
|}
Line 356: Line 355:
 
== Further Information and Guidance ==
 
== Further Information and Guidance ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(100, 203, 248);" | <br/>
+
| style="width: 10px; background-color: rgb(100, 203, 248)" | <br/>
 
|  
 
|  
 
*<span>Clean </span><span>Energy Solutions Centre & </span><span>iied</span><span>. (2015). Policies to Spur Energy&nbsp;</span><span>Access</span>&nbsp;<span><span>[https://cleanenergysolutions.org/resources/policies-spur-energy-access https]</span><span>[https://cleanenergysolutions.org/resources/policies-spur-energy-access ://]</span><span>[https://cleanenergysolutions.org/resources/policies-spur-energy-access cleanenergysolutions.org/resources/policies-spur-energy-access]</span></span>
 
*<span>Clean </span><span>Energy Solutions Centre & </span><span>iied</span><span>. (2015). Policies to Spur Energy&nbsp;</span><span>Access</span>&nbsp;<span><span>[https://cleanenergysolutions.org/resources/policies-spur-energy-access https]</span><span>[https://cleanenergysolutions.org/resources/policies-spur-energy-access ://]</span><span>[https://cleanenergysolutions.org/resources/policies-spur-energy-access cleanenergysolutions.org/resources/policies-spur-energy-access]</span></span>
Line 366: Line 365:
 
<br/>
 
<br/>
  
== Relevante Case Studies ==
+
== Relevant Case Studies ==
  
{| border="1" cellspacing="1" cellpadding="1" style="width:100%;"
+
{| style="width:100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
| style="width: 10px; background-color: rgb(100, 203, 248);" | <br/>
+
| style="width: 10px; background-color: rgb(100, 203, 248)" | <br/>
 
|  
 
|  
 
*[[NAE Case Study: Bangladesh, IDCOL Solar Home Systems|Bangladesh, IDCOL Solar Home Systems]]<br/>
 
*[[NAE Case Study: Bangladesh, IDCOL Solar Home Systems|Bangladesh, IDCOL Solar Home Systems]]<br/>

Latest revision as of 15:45, 30 July 2018

NAE Overview Page
TechnologyTechnology: Grid ExtensionTechnology: Grid-Connected Mini-Grid/Distribution SystemTechnology: Isolated Mini-GridTechnology: Standalone SystemsDelivery ModelDelivery Model: PublicDelivery Model: Private (Non-Government)Delivery Model: Public-Private PartnershipLegal BasisLegal Basis: ConcessionLegal Basis: LicenseLegal Basis / Price/Tariff Regulation: UnregulatedPrice/Tariff RegulationPrice/Tariff Regulation: UniformPrice/Tariff Regulation: IndividualFinanceFinance: PrivateFinance : UserFinance: Grants & SubsidiesFinance: Cross-SubsidiesFinance: Tax ExemptionsFinance: GuaranteesNon-Financial InterventionsNon-Financial Interventions: Direct Energy Access ProvisionNon-Financial Interventions: Institutional RestructuringNon-Financial Interventions: Regulatory ReformNon-Financial Interventions: Policy & Target SettingNon-Financial Interventions: Quality & Technical StandardsNon-Financial Interventions: Technical AssistanceNon-Financial Interventions: Capacity Building & Awareness RaisingNon-Financial Interventions: Market InformationNon-Financial Interventions: Demand PromotionNon-Financial Interventions: Technology Development & AdoptionNon-Financial Interventions: National Energy PlanningNational Approaches to Electrification – Delivery Model Page.png]]



Delivery Model: The (market) chain of organisations through which electricity is delivered to users



Public

Definition

Delivery of electricity access by an entity or entities all of which are publically owned and managed, using purely public finance.

In this delivery model all of the organisations engaged in provision of electricity access (whether through supply of electricity itself or provision of electricity systems), as part of the National Electrification Approach being considered, are state-owned. This implies that all the actors along the market chain (Project Development, Manufacture/Generation, Distribution and Retail) are publically owned. These may include electricity utilities, publically-owned generation, transmission and distribution companies, municipalities, or rural energy agencies. 


Interactions with other NAE Categories


Technology


National grid systems have most often been established under a public delivery model either through a single public electricity company owning and managing the entire system or through separate public generation, transmission and distribution companies. Grid-connected mini-grids and distribution systems may also be publically owned, for instance by a local municipality. Where isolated mini-grids or standalone systems are delivered through a public model this is generally by an electricity utility or distribution company which has adopted an integrated approach with electricity being provided using a combination of grid, mini-grid and standalone systems.


Legal Basis


Regulation of public delivery models is often implicit, with oversight and control being through organisational hierarchy rather than any explicit regulatory framework. For instance a national utility company’s monopoly (concession) over generation and/or sale of electricity may be established through the legislation under which it is created rather than through any separate framework. However, though an explicit regulatory framework may not be needed to give private investors confidence, such a framework is nevertheless regarded as best practice to achieve transparency and provide a barrier to political interference.


Price/Tariff Regulation


Where electricity is delivered through public models, with no need to attract private investment, there is also a temptation to manage prices by means of the organisational hierarchy. However, without independent regulation, there is a risk that political pressure will result in prices being depressed below cost-recovery levels leading to insolvency of the electricity providers and deterioration of the electricity provision.


Finance


By definition, a public delivery model will use public finance– by publically-owned utility companies or national or local government, potentially supported by loans and grants from international agencies - (since any private finance would cause the delivery model to be categorized as a public-private partnership). In addition public delivery models will draw on finance from users, through standalone system purchases, connection charges and ongoing charges, and for multi-user systems (grids and mini-grids) there is likely to be some element of cross-subsidy between users.


Non-Financial Interventions


National energy planning is key to establishing the optimum mix of technologies to meet electrification needs across the country, regardless of the delivery model employed. Institutional restructuring and capacity building or technical assistance may be needed where the key actors involved in public delivery models lack capacity is aspects of electrification. Technology development/adoption and adoption of appropriate technical standards, user awareness raising and demand promotion may be needed to increase revenues and make electricity access economically sustainable, regardless of the delivery model chosen.


Advantages and Disadvantages


A public delivery model has the advantage of making use of existing institutions. Where these organisations have strong capabilities and are efficient, a public delivery model may allow strongly focused and effective delivery of electrification and good coordination of grid, mini-grid and stand-alone solutions. However public organisations are often monolithic and slow moving. They may be more focused on managing existing assets than serving new consumers, particularly in remote rural areas, and they may lack the capabilities needed to deliver new forms of electricity access. They are also vulnerable to political pressure and interference, which can hamper electrification efforts and result in poor allocation of resources. Following a private sector or private-public partnership model can allow private sector finance and skills to be brought to bear and may achieve greater flexibility, speed and efficiency.


Further Information and Guidance



Relevant Case Studies



►Go to Top


Private (Non-Government)

Definition

Delivery of electricity access by an entity or entities none of which are owned and managed by the state, using purely private finance.

In this model all of the organisations engaged in provision of electricity access (whether through supply of electricity itself or provision of electricity systems), as part of the National Electrification Approach being considered, are non-state-owned. This implies that all the actors along the market chain1 (Project Development, Manufacture/Generation, Distribution and Retail) are non-state entities such as private companies, cooperatives, social enterprises, community organisations or NGOs (all characterised for this purpose as “private” organisations). 


Interactions with other NAE Categories


Technology


Few, if any, national grid systems have been established through a private delivery model (though in many countries privatisation has been used to transfer them into private ownership and bring in private investment). Grid-connected mini-grids and distribution systems have frequently been developed by private (non-state-owned) organisations. Where the grid system is also privately-owned, this constitutes a private model. (However, if the grid system is publically owned, and the mini-grid or distribution system uses electricity from the grid system, or the development draws on public grants, subsidies, loans, tax exemptions or guarantees, it constitutes a public-private partnership). The most frequently used models for delivery of standalone systems are private, through the involvement of state-organisations along the market chain, or use of funding from grants or subsidies provided by the state, donors or international agencies, may result in private-public partnerships.


Legal Basis


A private delivery model calls for an explicit legal framework for any form of electrification which involves significant long-term capital investment (grid, mini-grids and potentially standalone systems which are charged for on a pay-as-you-go basis) in order to attract private finance and allow for price regulation to protect users. A concession, which offers protection from competition, will provide the greatest attraction for private financiers. Where no long-term capital investment is involved, as with standalone systems sold directly to users, it’s generally considered that no legal control (beyond that for any business) is necessary. 


Price/Tariff Regulation


Where electricity is delivered by the private sector, using purely private finance, in a competitive market with no legal or effective monopoly (eg where several solar lanterns providers are operating) price regulation may be regarded as unnecessary. However, where any form of concession has been granted (or exists in practice), price regulation would be expected to protect users. On the other side, where significant capital investment is involved private financiers are likely to require a transparent framework for price/tariff regulation, to reduce the risk of price controls being introduced in the future at below cost-recovery levels and preventing full recovery of and return on investment.


Finance


As discussed above a private delivery model must be purely privately financed (since inclusion of any public finance would cause the delivery model to be categorized as a public-private partnership). Ultimately private delivery models will rely on connection and ongoing charges, and standalone system purchases from users. For multi-user systems (grids and mini-grids) there is also likely to be some element of cross-subsidy between users. 


Non-Financial Interventions


National energy planning is key to establishing the optimum mix of technologies to meet electrification needs across the country, regardless of the delivery model employed. Institutional restructuring and capacity building or technical assistance may be needed where the key actors lack the capacity to undertake regulatory reform in order to establish the legal and regulatory framework for private electrification, or to set and implement technical and quality standards (needed where the private sector is delivering access through mini-grids or distribution systems to ensure safety and compatibility between systems, and to support user confidence). Awareness raising amongst users and other potential market actors and service providers, as well as training (capacity building) to develop the skilled workforce needed by new energy access businesses are likely to be particularly relevant under a private delivery model, and demand promotion may be needed to increase revenues and make electricity access economically sustainable. Private delivery models are often a means of introducing new technologies, with private sector players bringing in technologies which they believe will have advantages over existing options which will allow them to grow their businesses. (Such new technology introduction, however, brings risks, and the private sector will expect to reap additional returns to balance these risks).


Advantages and Disadvantages


The private sector is widely seen as being more efficient, innovative flexible and nimble that the public sector and it is these virtues that it brings to energy access provision. Use of a private delivery model can be a way of bringing private sector skills and finance (both national and international), and the benefits of competition into the energy sector. Where public institutions are weak and ineffective, private delivery models may seem attractive, but it must be recognised that successful private delivery relies (particularly for grids and mini-grids) on effective public management including strong regulatory frameworks and this calls for capabilities within public institutions which they may lack. There are also elements needed for the private sector to deliver, such as workforce skills and user awareness, which individual businesses may be reluctant to provide, because of the costs involved and because in a competitive market they will be unsure that they (rather than competitors) will capture the benefits and secure a return on their investment. In addition, where modern energy access is not affordable on a purely private financed basis or public financial input is needed to support the costs of early market development, a public-private partnership delivery model will be needed. Grid-connected mini-grids can, in theory, provide any level of electricity supply, but in most cases if the investment is made for grid connection and associated standards are met, they  provide a grid-equivalent service, meeting all household, commercial, industrial and community requirements (Tier 5). (If the grid system itself is over-stretched with inadequate generation; or insufficiently robust or poorly maintained transmission and distribution systems reliability and quality of supply may deteriorate so that while users have a physical connection, they may not in fact have reliable access to electricity (bringing the supply Tier 3 or lower). To the extent that a grid-connected mini-grid draws on electricity from the grid its construction should be coupled with development of additional centralized generation capacity to support the resulting additional demand.


Further Information and Guidance



Relevant Case Studies


None of the examples examined have had a purely private sector delivery models (ie no public involvement in either ownership or funding).


►Go to Top


Public-Private Partnership

Definition

Delivery of electricity access by an entity which is part publically and part privately owned or by a mix of publically and privately owned entities or using a combination of public and private finance

This includes cases where:

  • a joint venture has been created between a state-owned organisation and a private company to provide electricity
  • one or more state-owned organisation fill some of the functions along the market chain1, while others are filled by private businesses
  • electricity provision is undertaken by private businesses with public financial support (subsidies, grants, loans etc)    


Interactions with other NAE Categories


Technology


Public-private models for grid systems might include:

  • Publically owned generation and transmission combined with privately owned distribution;
  • Independent Power Producers (IPPs) connected to a publically owned transmission/distribution system;
  • A privately owned grid system using grants from public sources to connect new users.

For grid connected mini-grids and distribution systems:

  • Mini-grids owned by a private developer connected to the (publically-owned) main grid, and thereby drawing on publically owned generation to meet demand;
  • A private company, or public-private joint venture, taking on operation of a section of the publically-owned grid distribution system;
  • Public grants or subsidies supporting development of a privately-owned mini-grid or distribution system.

For isolated mini-grids:

  • Mini-grids developed on a Build-Own-Operate-Transfer basis (initially owned and operated by a private developer, but transferred to public ownership at the end of a concession period);
  • Mini-grids built and operated by a public-private joint venture;
  • Public grants or subsidies supporting development of a privately-owned mini-grid.

Use of public finance (grants, subsidies and loans) to enhance affordability and support market growth often results in a public-private model for standalone systems, even when there is a purely private-sector chain of manufacturers, importers, distributors and retailers. There could also be benefits in some circumstances from government energy agencies becoming directly involved in the standalone system market, by forming a joint entity to supply systems or by taking on one of the roles along the value chain (eg providing a distribution service for all system providers), as a means of supporting market development.


Legal Basis


Because a public-private model involves private ownership and investment, an explicit legal framework will be required for any form of electrification which involves significant long-term capital investment in order to attract private finance and allow for price regulation to protect users. A concession, which offers protection from competition, will provide the greatest attraction for private financiers. Where no long-term capital investment is involved, as with standalone systems sold directly to users, no legal control (beyond that for any business) may be necessary – however if there is partial public sector ownership, a transparent legal framework may be required to convince private market participants that they are not facing unfair competition, and also to ensure that any public finance is not being misused. 


Price/Tariff Regulation


Where significant capital investment is involved, a transparent framework for price/tariff regulation is likely to be required to attract the private element into any public-private partnership. Tariff regulation will also protect users and provide a means of ensuring that public finance is not being misused or exploited by the private sector. It may also demonstrate to private market participants that they are not facing unfair competition from partially publically-owned market participants. 


Finance


All public-private partnerships will involve a combination of private and public finance. Private finance will come through ownership and investment in, and loans to electricity providers. Public finance may come through these routes, but may also be through various forms of grant, subsidy, tax exemption or guarantee. Ultimately public-private models, like other forms of electricity provision, will rely on connection and ongoing charges, and standalone system purchases from users. For multi-user systems (grids and mini-grids) there is also likely to be some element of cross-subsidy between users. 


Non-Financial Interventions


National energy planning is key to establishing the optimum mix of technologies to meet electrification needs across the country, regardless of the delivery model employed. Institutional restructuring may be needed to establish public-private partnerships and capacity building or technical assistance may be required if the key actors lack the capacity to undertake regulatory reform or design arrangements for public financial support.  Awareness raising amongst users and other potential market actors and service providers, as well as training (capacity building) to develop the skilled workforce needed by new energy access businesses can be beneficial alongside financial forms of public support. Public-private partnership may also provide the means to bring in new technology, with the private sector providing the technology know-how while the public sector bears the risk inherent in new technology which private investors may be reluctant to take on. 


Advantages and Disadvantages (Including Level of Electricity Provided)


Public-Private partnerships offer the potential to combine the benefits of both models, with public security being combined with private efficiency, innovation and flexibility. Bringing in private finance can extend the capacity for electricity provision beyond that which the public sector alone can offer, while public financial support can be used to attract private finance and make electricity affordable for users.  Combining public and private inputs is not, however, simple. Significant expertise is required to ensure that private investment is attracted while making optimum use of public resources. Moreover, the appropriate form of public-private partnership will change as markets develop and levels of electricity access increase – and this must be recognised while at the same time creating regimes which can give the private sector the confidence in the future they require to invest.


Further Information and Guidance



Relevant Case Studies



►Go to Top


References

Authors

Authors: Mary Willcox, Dean Cooper

Acknowledgements

The Review was prepared by Mary Willcox and Dean Cooper of Practical Action Consulting working with Hadley Taylor, Silvia Cabriolu-Poddu and Christina Stuart of the EU Energy Initiative Partnership Dialogue Facility (EUEIPDF) and Michael Koeberlein and Caspar Priesemann of the Energising Development Programme (EnDev). It is based on a literature review, stakeholder consultations. The categorization framework in the review tool is based on the EUEI/PDF / Practical Action publication "Building Energy Access Markets - A Value Chain Analysis of Key Energy Market Systems".

A wider range of stakeholders were consulted during its preparation and we would particularly like to thank the following for their valuable contributions and insights: - Jeff Felten, AfDB - Marcus Wiemann and other members, ARE - Guilherme Collares Pereira, EdP - David Otieno Ochieng, EUEI-PDF - Silvia Luisa Escudero Santos Ascarza, EUEI-PDF - Nico Peterschmidt, Inensus - John Tkacik, REEEP - Khorommbi Bongwe, South Africa: Department of Energy - Rashid Ali Abdallah, African Union Commission - Nicola Bugatti, ECREEE - Getahun Moges Kifle, Ethiopian Energy Authority - Mario Merchan Andres, EUEI-PDF - Tatjana Walter-Breidenstein, EUEI-PDF - Rebecca Symington, Mlinda Foundation - Marcel Raats, RVO.NL - Nico Tyabji, Sunfunder -



NAE Overview Page

Any feedback would be very welcome. If you have any comments or enquires please contact: mary.willcox@practicalaction.org.ukbenjamin.attigah@euei-pdf.org, or caspar.priesemann@giz.de.

Download the Tool as a Power Point: https://energypedia.info/images/a/aa/National_Approaches_to_Electrification_-_Review_of_Options.pptx


►Go to Top