Difference between revisions of "Nepal – Power Development Project"

From energypedia
***** (***** | *****)
***** (***** | *****)
m (Text replace - "PRC" to "REPRC")
 
(6 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
 
{{Project Resource Center
 
{{Project Resource Center
|PRC title=Nepal – Power Development Project
+
|REPRC title=Nepal – Power Development Project
|PRC organization=World Bank
+
|REPRC organization=World Bank
|PRC year=2011
+
|REPRC year=2011
|PRC Country=Nepal
+
|REPRC Region South Asia=South Asia
|PRC language=English
+
|REPRC Country in South Asia=Nepal
|PRC file en=Nepal Power Development Project.pdf
+
|REPRC language=English
|PRC file fr=
+
|REPRC file ar=
|PRC file ar=
+
|REPRC file cn=
|PRC file sp=
+
|REPRC file en=Nepal Power Development Project.pdf
|PRC file cn=
+
|REPRC file fr=
|PRC file ru=
+
|REPRC file pr=
|PRC file pr=
+
|REPRC file ru=
|PRC file other=
+
|REPRC file sp=
|PRC type general=Case Study
+
|REPRC file other=
|PRC type case=Project Financing
+
|REPRC type general=Case Study
|PRC type other=
+
|REPRC type case=Project Financing
|PRC technology=Hydro
+
|REPRC type other=
|PRC technology hydro=Small/Mini
+
|REPRC technology hydro=Hydro
|PRC abstract=NEPAL – POWER DEVELOPMENT PROJECT
+
|REPRC technology hydro sub=Small/Mini
<br>
+
|REPRC abstract=This project aimed to increase the flow of private investment in small and medium hydropower plants through the creation of a Power Development Fund (PDF), which provides provide long term financing to private investors, leveraging debt (and developer’s equity) financing from the local capital markets. The project also aimed to reduce costs of new plants by implementing improved international competitive tendering processes.<br/>
'''Barriers:''' Lack of long term financing and availability of equity; '''Instrument:''' Project loan; '''Application:''' n/a; '''Amount:''' Original IDA fund of US$35 million
+
*'''Barriers:''' Lack of long term financing and availability of equity<br/>
 +
*'''Instrument:''' Project loan<br/>
 +
*'''Application:''' n/a<br/>
 +
*'''Amount:''' Original IDA fund of US$35 million<br/>
 
}}
 
}}
  
Line 29: Line 33:
 
[[Category:Micro_Hydro]]
 
[[Category:Micro_Hydro]]
 
[[Category:Project_Resource_Center]]
 
[[Category:Project_Resource_Center]]
 +
[[Category:REPRC_Hydro]]
 
[[Category:Small-Hydro/Mini-Hydro]]
 
[[Category:Small-Hydro/Mini-Hydro]]

Latest revision as of 15:01, 26 February 2014



Nepal – Power Development Project

Title of Document Nepal – Power Development Project
Abstract This project aimed to increase the flow of private investment in small and medium hydropower plants through the creation of a Power Development Fund (PDF), which provides provide long term financing to private investors, leveraging debt (and developer’s equity) financing from the local capital markets. The project also aimed to reduce costs of new plants by implementing improved international competitive tendering processes.
  • Barriers: Lack of long term financing and availability of equity
  • Instrument: Project loan
  • Application: n/a
  • Amount: Original IDA fund of US$35 million
File Download

English: Nepal Power Development Project.pdf

Original Source World Bank
Year 2011
Region/Country South Asia - Nepal
Language(s) English
Document Type Case Study - Project Financing
Technology Hydro Small/Mini
Connection Type


Hydro


<ul><li>Property "REPRC abstractsearch" (as page type) with input value "ßthis project aimed to increase the flow of private investment in small and medium hydropower plants through the creation of a power development fund (pdf), which provides provide long term financing to private investors, leveraging debt (and developer’s" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.</li> <!--br--><li>Property "REPRC abstractsearch2" (as page type) with input value "ßoper’s equity) financing from the local capital markets. the project also aimed to reduce costs of new plants by implementing improved international competitive tendering processes.*barriers: lack of long term financing and availability of e" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.</li></ul>