Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "PicoPV Test"

From energypedia
***** (***** | *****)
***** (***** | *****)
m
 
(42 intermediate revisions by 12 users not shown)
Line 1: Line 1:
= Solar Energy =
+
[[Portal:Solar|►Back to Solar Portal]]
 +
= Overview =
  
== Pico PV Systems ==
+
Pico PV Systems have emerged as a strong contender in the solar market of developing countries. Thus,[[Energising_Development_(EnDev)|EnDev]] has developed a test series to test their effectiveness.<br/>
  
Currently engagement concerning Pico PV Systems increases. In order to advance the framework for project development in this field EnDev has effected various activities. One of these is a test series for Pico PV Systems. It is divided into three phases:
+
== Technical Test I<br/> ==
  
<br>
+
The technical tests are performed by '''Fraunhofer Gesellschaft ([http://www.ise.fraunhofer.de/en?set_language=en FhG/ISE])''' in Freiburg, Germany. In the first test phase (2007/ 10 - 2008/ 01) twelve systems were tested on road capability with special focus on mechanical stability, lighting characteristics and operability.
  
1. Technical Test I
+
<u>These systems were in detail:</u>
  
2. Technical Test II
+
*GL9000SW, Global Marketing Technologies Inc. (US) --> overall picture bad
 +
*MS01, Macro-Solar Technology Co,. Ltd (China) --> overall picture very bad
 +
*Solar 2007-1, Solarprojekt-Freilassing e.v. (Germany) --> overall picture good
 +
*Mightylight, Cosmos Ignite Innovations (India) --> overall picture good
 +
*AISHWARYA, Noble energy Solar Technologies Ltd. (?) --> overall picture middle
 +
*Solar Home System, "Afghanistan" --> overall picture very bad
 +
*2212SL Wuara, SolEnergy Africa (PTY) Ltd (South Africa) --> overall picture very bad
 +
*SOLUX-LED-100, SOLUX e.v. (Germany) --> overall picture middle
 +
*Sun x-set mobile, Würth Solergy (Germany) --> overall picture middle - bad
 +
*Glowstar GS7, Sollatek Ltd. (UK) --> overall picture middle
 +
*AS018, Astral Solar technology Co. (China) --> overall picture bad
 +
*SOLUX-LED-50, SOLUX e.v. (Germany) --> overall picture middle
  
3. Field Tests
+
<br/>
  
<br>
+
== Technical Test II<br/> ==
  
=== Technical Test I ===
+
Seven solar lanterns reached the second testing stage, of which four are German-made: the Solux LED 100 and Solux LED 50 of the Solux e.V. development assistance project, the Solar 2007-1 by the Freilassing solar promotion project, and the sun x-set mobile produced by Würth. Other lamps of the main test were the Glowstar GS7 of the British company Sollatek, the A­ishwarya NEST-6543 of the Indian manufacturer Noble Energy and the Mightylight 3040, also Indian made.
  
The technical tests are performed by Fraunhofer Gesellschaft FhG/ISE in Freiburg, Germany. In the first test phase (2007/ 10 - 2008/ 01) eleven systems were tested on road capability with special focus on mechanical stability, lighting characteristics and operability. These systems were in detail:
+
<u>In the following table you find a selection of the most important criteria:</u>
  
* GL9000SW, Global Marketing Technologies Inc. (US) --&gt; overall picture bad
+
'''Testcriteria Level 2'''
* MS01, Macro-Solar Technology Co,. Ltd (China) --&gt; overall picture very bad
 
* Solar 2007-1, Solarprojekt-Freilassing e.v. (Germany) --&gt; overall picture good
 
* Mightylight, Cosmos Ignite Innovations (India) --&gt; overall picture good
 
* AISHWARYA, Noble energy Solar Technologies Ltd. (?) --&gt; overall picture middle
 
* Solar Home System, "Afghanistan" --&gt; overall picture very bad
 
* 2212SL Wuara, SolEnergy Africa (PTY) Ltd (South Africa) --&gt; overall picture very bad
 
* SOLUX-LED-100, SOLUX e.v. (Germany) --&gt; overall picture middle
 
* Sun x-set mobile, Würth Solergy (Germany) --&gt; overall picture middle - bad
 
* Glowstar GS7, Sollatek Ltd. (UK) --&gt; overall picture middle
 
* AS018, Astral Solar technology Co. (China) --&gt; overall picture bad
 
  
<br>
+
{| cellspacing="0" cellpadding="3" border="1" style="width: 70%;  width: 100%"
 +
|-
 +
|
 +
Solar module
  
Detaild test description can be inspected here:<br>
+
|
 +
Does the system deliver the nominal rated values of power output, open- circuit voltage and shortcircuit current?
  
Testprotokoll SLT Level 1GTZ 15.01.08.pdf (in german)<br>
+
|-
 +
| <div class="draft"></div>Battery<br/>
 +
|
 +
Measure of capacity (NiMH+ Pb), persistence against overcharging (NiMH), simple durability test (NiMH)<span style="font-size: 11pt;  font-family: arial"></span>
  
=== Technical Test II ===
+
|-
 +
|
 +
Luminous fux<span style="font-size: 11pt;  font-family: arial"></span>
  
not yet started<br>
+
|
 +
average of 210 minutes
  
=== Field Test ===
+
|-
 +
|
 +
Brennzeit/autonome Zeit
  
not yet started
+
|
 +
The duration is measured until luminous flux falls to 70&nbsp;% of the initial value. (beginning from a fully-charged battery)
  
== Solar Home Systems ==
+
|-
 +
| Luminous efficacy<br/>
 +
|
 +
average is obtained from a period of 210 minutes, beginning from a fully-charged battery.
 +
 
 +
|-
 +
| Charge Controller<br/>
 +
|
 +
Spannungslevel Ladeschluss-/ Lastabwurfspannung, Eigenverbrauch, Signalisierungen, Schutz vor Entladung durch Modul, Wirkungsgrad
 +
 
 +
|-
 +
| Ballast device<br/>
 +
|
 +
How good is the efficiency of the ballast?
 +
 
 +
|-
 +
|
 +
Cycle test / degradation of CFL-lamps
 +
 
 +
|
 +
How long do CFL lamps last when subjected to a switching cycle of ‘on’ for 60 seconds, ‘off’ for 150 seconds?
 +
 
 +
|-
 +
|
 +
Simulation
 +
 
 +
|
 +
Ermittlung der solaren Deckungsrate für 5 Standorte bei einer Brenndauer von täglich 3,5 Stunden
 +
 
 +
|}
 +
 
 +
<br/>
 +
 
 +
== Field Test<br/> ==
 +
 
 +
<u><span class="MsoPageNumber"><span style="font-size: 10pt;  font-family: 'arial','sans-serif'">The publication is available in English and German:</span></span></u>
 +
 
 +
*[[:File:Solar Lanterns Test - Shades of Light.pdf|English version]]
 +
*[[:File:Solarleuchtentest - Licht und Schatten.pdf|German version]]<span class="MsoPageNumber"><span style="font-size: 10pt;  font-family: 'arial','sans-serif'"></span></span>
 +
 
 +
<br/>
 +
 
 +
 
 +
= Further Information =
 +
 
 +
*[[PicoPV Field Tests|PicoPV Field Tests (of GTZ EnDev)]]
 +
*The SOLAR 2007-1 Lantern (Solarprojekt Freilassing e.V.)has been upgraded with new LEDs of 80 lm/W.
 +
 
 +
<br/>
 +
 
 +
[[Category:PicoPV]]
 +
[[Category:Solar]]

Latest revision as of 09:38, 1 August 2018

►Back to Solar Portal

Overview

Pico PV Systems have emerged as a strong contender in the solar market of developing countries. Thus,EnDev has developed a test series to test their effectiveness.

Technical Test I

The technical tests are performed by Fraunhofer Gesellschaft (FhG/ISE) in Freiburg, Germany. In the first test phase (2007/ 10 - 2008/ 01) twelve systems were tested on road capability with special focus on mechanical stability, lighting characteristics and operability.

These systems were in detail:

  • GL9000SW, Global Marketing Technologies Inc. (US) --> overall picture bad
  • MS01, Macro-Solar Technology Co,. Ltd (China) --> overall picture very bad
  • Solar 2007-1, Solarprojekt-Freilassing e.v. (Germany) --> overall picture good
  • Mightylight, Cosmos Ignite Innovations (India) --> overall picture good
  • AISHWARYA, Noble energy Solar Technologies Ltd. (?) --> overall picture middle
  • Solar Home System, "Afghanistan" --> overall picture very bad
  • 2212SL Wuara, SolEnergy Africa (PTY) Ltd (South Africa) --> overall picture very bad
  • SOLUX-LED-100, SOLUX e.v. (Germany) --> overall picture middle
  • Sun x-set mobile, Würth Solergy (Germany) --> overall picture middle - bad
  • Glowstar GS7, Sollatek Ltd. (UK) --> overall picture middle
  • AS018, Astral Solar technology Co. (China) --> overall picture bad
  • SOLUX-LED-50, SOLUX e.v. (Germany) --> overall picture middle


Technical Test II

Seven solar lanterns reached the second testing stage, of which four are German-made: the Solux LED 100 and Solux LED 50 of the Solux e.V. development assistance project, the Solar 2007-1 by the Freilassing solar promotion project, and the sun x-set mobile produced by Würth. Other lamps of the main test were the Glowstar GS7 of the British company Sollatek, the A­ishwarya NEST-6543 of the Indian manufacturer Noble Energy and the Mightylight 3040, also Indian made.

In the following table you find a selection of the most important criteria:

Testcriteria Level 2

Solar module

Does the system deliver the nominal rated values of power output, open- circuit voltage and shortcircuit current?

Battery

Measure of capacity (NiMH+ Pb), persistence against overcharging (NiMH), simple durability test (NiMH)

Luminous fux

average of 210 minutes

Brennzeit/autonome Zeit

The duration is measured until luminous flux falls to 70 % of the initial value. (beginning from a fully-charged battery)

Luminous efficacy

average is obtained from a period of 210 minutes, beginning from a fully-charged battery.

Charge Controller

Spannungslevel Ladeschluss-/ Lastabwurfspannung, Eigenverbrauch, Signalisierungen, Schutz vor Entladung durch Modul, Wirkungsgrad

Ballast device

How good is the efficiency of the ballast?

Cycle test / degradation of CFL-lamps

How long do CFL lamps last when subjected to a switching cycle of ‘on’ for 60 seconds, ‘off’ for 150 seconds?

Simulation

Ermittlung der solaren Deckungsrate für 5 Standorte bei einer Brenndauer von täglich 3,5 Stunden


Field Test

The publication is available in English and German:



Further Information