Difference between revisions of "Portal:Hydro"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 15: Line 15:
 
*[[Upgrading of water mills, rehabilitation of existing power plants|Upgrading of Water Mills / Rehabilitation of Power Plants]]
 
*[[Upgrading of water mills, rehabilitation of existing power plants|Upgrading of Water Mills / Rehabilitation of Power Plants]]
 
*[[Pico Hydro Power|Pico Hydro Power]]
 
*[[Pico Hydro Power|Pico Hydro Power]]
*[[Hydro_Battery_Charging_Station|Hydro Battery Charging Station]]
+
*[[Hydro Battery Charging Station|Hydro Battery Charging Station]]
*[[How to Plan a MHPP in brief|How to plan a MHPP in brief]]
+
*[[How to Plan a MHPP in brief|How to Plan a MHPP in Brief]]
  
 
.
 
.
Line 22: Line 22:
 
=== Policy Framework<br/> ===
 
=== Policy Framework<br/> ===
  
*[[International organisations|International organisations]]
+
*[[International organisations|International Organisations]]
*[[Institutions - mhp related|Institutions - mhp related]]
+
*[[Institutions - mhp related|Institutions - (Micro Pydro Power) MHP Related]]
*[[Overall institutional set-up at national level|Overall institutional set-up at national level (incl. rural electrification agencies)]]
+
*[[Overall institutional set-up at national level|Overall Institutional Set-up at National Level (incl. rural electrification agencies)]]
*[[Typical Regulations for the Installation and Operation of Small Hydro Power Plants (SHPP)|Regulations for installation & operation of small hydro power plants (country specific)]]
+
*[[Typical Regulations for the Installation and Operation of Small Hydro Power Plants (SHPP)|Regulations for Installation & Operation of Small Hydro Power Plants (country specific)]]
*[[Energy planning for rural areas|Energy planning for rural areas (national level, local level)]] • [[Feed-in Policies|Feed-in policies]] • [[Promotional instruments|Promotional instruments]]
+
*[[Energy planning for rural areas|Energy Planning for Rural Areas (national level, local level)]] • [[Feed-in Policies|Feed-in Policies]] • [[Promotional instruments|Promotional Instruments]]
  
  
Line 34: Line 34:
 
*[[Promotion of local planning|Promotion of Local Planning / Design Capacities]]
 
*[[Promotion of local planning|Promotion of Local Planning / Design Capacities]]
 
*[[Modes of operation|Modes of Operation (public, private, community-based, …)]]
 
*[[Modes of operation|Modes of Operation (public, private, community-based, …)]]
*[[Promotion of private sector participation|Promotion of private sector participation (Operator models / business set-up)]]
+
*[[Promotion of private sector participation|Promotion of Private Sector Participation (operator models / business set-up)]]
*[[Metering and billing systems|Metering and billing systems (metering, flat-rate / limiters, pre-payment)]]
+
*[[Metering and billing systems|Metering and Billing Systems (metering, flat-rate / limiters, pre-payment)]]
 
*[[Tariffs|Tariffs]]
 
*[[Tariffs|Tariffs]]
*[[Operation and maintenance|Operation and Maintenance (Models, Training Approaches, …)]]
+
*[[Operation and maintenance|Operation and Maintenance (models, training approaches, …)]]
 
*[[Off-grid to on-grid|Off-grid to On-grid]]
 
*[[Off-grid to on-grid|Off-grid to On-grid]]
  
Line 45: Line 45:
  
 
*[[Hydropower: Grants & subsidies|Grants, Subsidies]]
 
*[[Hydropower: Grants & subsidies|Grants, Subsidies]]
*[[Loans|Loans (Soft Loans, Commercial Loans)]]
+
*[[Loans|Loans (soft loans, commercial loans)]]
 
*[[Venture Capital|Venture Capital]]
 
*[[Venture Capital|Venture Capital]]
 
*[[Project Financing (Ratna Sansar Shrestha, FCA)|Project Financing]]
 
*[[Project Financing (Ratna Sansar Shrestha, FCA)|Project Financing]]
Line 52: Line 52:
 
*[[Involvment of MFIs, Commercial Banks, Governmental Financial Institutions|Involvement of Governmental Financial Institutions]]
 
*[[Involvment of MFIs, Commercial Banks, Governmental Financial Institutions|Involvement of Governmental Financial Institutions]]
  
*[[Green MFIs for MHP|Green MFIs for MHP]]
+
*[[Green MFIs for MHP|Green MFIs for Micro Hydro Power (MHP)]]
*[[Risk coverage|Risk Coverage (for Project Preparation, for Construction Phase, Operation Phase)]]
+
*[[Risk coverage|Risk Coverage (for project preparation, for construction phase, operation phase)]]
*[[Tool for a fast but profound analysis on the financial feasibility of MHP projects|Analysis Tool for the Financial Feasibility of MHP Projects]]
+
*[[Tool for a fast but profound analysis on the financial feasibility of MHP projects|Analysis Tool for the Financial Feasibility of Micro Hydro Power (MHP) Projects]]
*[[Costs of MHP sites|Costs of MHP Sites]]
+
*[[Costs of MHP sites|Costs of Micro Hydro Power (MHP) Sites]]
  
 
| style="width: 4%" | <br/>
 
| style="width: 4%" | <br/>
Line 68: Line 68:
 
*[[Environment Assessment and Watershed Action Planning related to MHP|Environment Assessment and Watershed Action Planning]]
 
*[[Environment Assessment and Watershed Action Planning related to MHP|Environment Assessment and Watershed Action Planning]]
 
*[[Hydropower Sustainability Assessment Protocol (HSAP)|Hydropower Sustainability Assessment Protocol (HSAP)]]
 
*[[Hydropower Sustainability Assessment Protocol (HSAP)|Hydropower Sustainability Assessment Protocol (HSAP)]]
*[[Socio-economic and Environmental Impacts of MHP|Socio-economic and Environmental Impacts of MHP]]
+
*[[Socio-economic and Environmental Impacts of MHP|Socio-economic and Environmental Impacts of Micro Hydro Power (MHP)]]
 
*[[Forest conservation|Forest Conservation]]
 
*[[Forest conservation|Forest Conservation]]
  
Line 149: Line 149:
 
*[[MHP discussion group|PSP Hydro - Rwanda - Qs and As]]
 
*[[MHP discussion group|PSP Hydro - Rwanda - Qs and As]]
 
*[[Market of Opportunities - Rural Electrification|Rural Electrification - Market of Opportunities]]
 
*[[Market of Opportunities - Rural Electrification|Rural Electrification - Market of Opportunities]]
*[[Pros and Cons - MHP|Pros and Cons - MHP]]
+
*[[Pros and Cons - MHP|Pros and Cons - Micro Hydro Power (MHP)]]
  
  
Line 158: Line 158:
 
*[[MHP Manuals|Manuals]]
 
*[[MHP Manuals|Manuals]]
 
*[[Tender Documents|Tender Documents]]
 
*[[Tender Documents|Tender Documents]]
*[[:file:Mhp-tree-3.jpg|Mhp Tree Diagram]]
+
*[[:file:Mhp-tree-3.jpg|Micro Hydro Power (MHP) Tree Diagram]]
*[[Further MHP links|External MHP Links]]
+
*[[Further MHP links|External Micro Hydro Power (MHP) Links]]
  
 
| style="width: 4%" | <br/>
 
| style="width: 4%" | <br/>

Revision as of 16:04, 20 June 2012

{{#icon:icon-hydro.png|||}}

Welcome to the Hydro Portal

Technological Aspects

.

Policy Framework


Operation and Business Models


Financing Models and Costs


Social and Environmental Impacts


Climate Change-related Issues


FAQs


Hydro Power Sites

<googlemap width="100%" type="terrain" icons="http://maps.google.com/mapfiles/marker{label}.png" version="0.9" lat="0.3" lon="28.125" zoom="3">

-0.9794, 29.6194, MHP Bwindi 0°58'46"S 29°37'10"E 1.216944, 34.738889, MHP Suam 1°13'1"N 34°44'20"E 3.581111, 31.772917, MHP Fofo 3°34'52.5"N 31°46'22.5"E 3.663611, 31.800833, PHP Gwere 3°39'49"N 31°48'3"E 2.36333333333, 31.1090277778, PHP Ayungu 2°21'48"N 31° 6'32.5"E

-3.670278, 37.410278, LHP Nyumba ya Mungu 3°40′13″S, 37°24′37″E -7.136667, 35.987778, LHP Mtera 07°08′12″S, 35°59′16″E -7.650222, 36.906822, LHP Kidatu 7°39'0.8S 36°54'24.56E -8.465353, 35.668314, LHP Kihansi 8°27'55.27S 35°40'05.93E -5.283333, 38.6, LHP Hale 5°17'0S 38°36'0E

-2.509005, 28.87528, LHP Rusizi I 2°30'32.42"S 28°52'31.01"E

-0.795386, 37.749642, LHP Gitaru 0°47'43.39S, 37° 44'58.71E -0.807761, 37.686406, LHP Kamburu Dam 0°48'27.94S, 37° 41'11.06E -0.806322, 37.811033, LHP Kindaruma 0°48'22.76S, 37° 48'39.72E -0.87845, 37.589056, LHP Masinga Dam 0°52'42.42S, 37°35'20.6E -0.639842, 37.90955, LHP Kiambere 0°38'23.43S, 37°54'34.38E

6.577778, 38.697306, MHP Gobecho I 6º34’40’’N 38º41’50.3’’ E 6.577778, 38.697222, MHP Gobecho II 6º34’39.7’’N 38º41’50’’E 6.557444, 38.669, MHP Ererte 6º33’26.8’’N 38º40’8.4’’ E 6.624056, 38.518139, MHP Hagara 6º37’26.6’’N 38º31’5.3’’ E 6.683333, 38.700133, SHP Yaye (planned) 6º41’00’’N 38º42’48’’ E 13.344361, 38.745347, LHP Tekeze 13° 20′ 39.7″ N, 38° 44′ 43.25″ E 11.819444, 36.918889, LHP Beles 11° 49′ 10″ N, 36° 55′ 8″ E 7.831389, 37.321667, LHP Gilgel Gibe I 7° 49′ 53″ N, 37° 19′ 18″ E 7.756944, 37.562222, LHP Gilgel Gibe II 7° 45′ 25″ N, 37° 33′ 44″ E 8.393503, 39.3524641, LHP Awash II and III 8°23'36.61N 39°21'8.87E 11.4858626, 37.589711, LHP Tis Abay I 11°29'9.10N 37°35'22.95E 11.4887487, 37.5997773, LHP Tis Abay II 11°29'19.49N 37°35'59.19E 7.1200094, 39.3367356, LHP Melka Wakena 7°7'12.03N 39°20'12.24E 8.4691304, 39.1588636, LHP Koka 8°28'8.86N 39°9'31.9E

-1.915979, 29.401474,MHP Murunda 1°54'57.52S 29°24'5.30E (not exact location) -2.4052, 29.2646, MHP Masimeru 2°24'18.4S 29°15'52.7E -1.662044, 29.651413, MHP Musarara 1°39'43.35S 29°39'5.08E -1.768935, 30.131464, MHP Kavumu 1°46'8.16S 30°7'53.27E

-18.577764, 47.861764, MHP Mangamila to Tsaratsaotra 18° 34‘ 39.95‘‘S 47° 51’42.35‘‘E


(_grey) -22.558904, 17.082481, This is an example of a marker for a planned MHP site (it is not really in planning)!

</googlemap>


Projects + Workshops


Discussions


Library


Latest Hydro Articles

14 March 2024
File:Rehabilitation of Micro-Hydropower Plants in Ethiopia GBE Case Study GIZ 2023.pdf
28 November 2023
Publication - The Ocean–Energy Economy: A Multifunctional Approach
31 October 2023
Publication - Power with Full Force: Getting to Gender Equality in the Hydropower Sector


Hydro News

Special:Wikilog/2/Template:WikilogTempl2/Category:Hydro


Hydro Events


Articles Needing Attention


Missing Articles