Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Portal:Hydro"

From energypedia
***** (***** | *****)
***** (***** | *****)
m
Line 1: Line 1:
{| class="FCK__ShowTableBorders" cellspacing="0" cellpadding="0" width="100%" border="0"
+
{| width="100%" cellspacing="0" cellpadding="0" border="0" class="FCK__ShowTableBorders"
 
|-
 
|-
| width="30" bgcolor="#1066ff" | [[Image:Hydro.jpg]]<br>
+
| width="30" bgcolor="#1066ff" | [[Image:Hydro.jpg]]<br>  
| width="870" bgcolor="#99ccff" | <div style="padding-right: 0px; padding-left: 0px; font-size: 140%; padding-bottom: 0px; padding-top: 0px; border-bottom: rgb(70,130,180) 0px solid; text-align: left"><span style="color: rgb(0,0,0)">'''&nbsp;Welcome to the Hydro section'''</span></div>
+
| width="870" bgcolor="#99ccff" | <div style="border-bottom: 0px solid rgb(70, 130, 180); padding: 0px; font-size: 140%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''&nbsp;Welcome to the Hydro section'''</span></div>
 
|}
 
|}
  
<br>
+
<br>  
  
{| class="FCK__ShowTableBorders" cellspacing="2" cellpadding="0" width="100%" border="0"
+
{| width="100%" cellspacing="2" cellpadding="0" border="0" class="FCK__ShowTableBorders"
 
|-
 
|-
 
| width="50%" |  
 
| width="50%" |  
{| class="FCK__ShowTableBorders" cellspacing="1" cellpadding="1" width="100%" border="0"
+
{| width="100%" cellspacing="1" cellpadding="1" border="0" class="FCK__ShowTableBorders"
 
|-
 
|-
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Technological Aspects'''</span><br></div>
+
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Technological Aspects'''</span><br></div>  
 
*Civil engineering  
 
*Civil engineering  
 
*Power equipment (turbines, generators, …)  
 
*Power equipment (turbines, generators, …)  
Line 21: Line 21:
 
*Institutional set-up  
 
*Institutional set-up  
 
*Overall institutional set-up at national level (incl. rural electrification agencies)  
 
*Overall institutional set-up at national level (incl. rural electrification agencies)  
*International organisations
+
*International organisations  
 +
*[[How to Plan a MHPP in brief|How to Plan a MHPP in brief]]
  
 
|-
 
|-
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Policy Framework'''</span></div>
+
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Policy Framework'''</span></div>  
 
*Typical regulations for the installation and operation of small hydro power plants  
 
*Typical regulations for the installation and operation of small hydro power plants  
 
*Feed-in policies  
 
*Feed-in policies  
Line 31: Line 32:
  
 
|-
 
|-
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Operation and Business Models'''</span></div>
+
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Operation and Business Models'''</span></div>  
 
*Promotion of local planning / design capacities  
 
*Promotion of local planning / design capacities  
 
*Modes of operation (public, private, community-based, …)  
 
*Modes of operation (public, private, community-based, …)  
Line 40: Line 41:
  
 
|-
 
|-
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Financing Models'''</span></div>
+
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Financing Models'''</span></div>  
 
*Grants, subsidies  
 
*Grants, subsidies  
 
*Soft loans  
 
*Soft loans  
Line 49: Line 50:
  
 
|-
 
|-
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Social and environmental Impacts '''</span></div>
+
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Social and environmental Impacts '''</span></div>  
 
*Monitoring (socio-economic studies, baseline studies, …)  
 
*Monitoring (socio-economic studies, baseline studies, …)  
 
*Conflict-sensitive project design (incl. household selection, tariffs, cross-subsidization)  
 
*Conflict-sensitive project design (incl. household selection, tariffs, cross-subsidization)  
Line 58: Line 59:
  
 
|-
 
|-
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Climate change-related issues'''</span></div>
+
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Climate change-related issues'''</span></div>  
 
*CDM, bundling, CDM Programme of Activities  
 
*CDM, bundling, CDM Programme of Activities  
 
*Climate proofing of projects
 
*Climate proofing of projects
Line 65: Line 66:
  
 
| width="50%" |  
 
| width="50%" |  
{| class="FCK__ShowTableBorders" cellspacing="1" cellpadding="1" width="100%" border="0"
+
{| width="100%" cellspacing="1" cellpadding="1" border="0" class="FCK__ShowTableBorders"
 
|-
 
|-
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Frequently Asked Questions'''</span></div>
+
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Frequently Asked Questions'''</span></div>  
 
*[[HydroFaQ|... on Hydro ]]<br>
 
*[[HydroFaQ|... on Hydro ]]<br>
  
 
|-
 
|-
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Projects'''</span>[[EnDev-Benin stoves|<br>]]</div>
+
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Projects'''</span>[[EnDev-Benin stoves|<br>]]</div>  
*[[EnDev-Bolivia|Bolivia]][[EnDev-Burkina Faso|<br>]]
+
*[[EnDev-Bolivia|Bolivia]][[EnDev-Burkina Faso|<br>]]  
*[[EnDev-Ethiopia stoves|Ethiopia]]<br>
+
*[[EnDev-Ethiopia stoves|Ethiopia]]<br>  
 
*[[EnDev-Indonesia|Indonesia]]  
 
*[[EnDev-Indonesia|Indonesia]]  
 
*[[EnDev-Rwanda r.e.|Rwanda]]  
 
*[[EnDev-Rwanda r.e.|Rwanda]]  
Line 79: Line 80:
  
 
|-
 
|-
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Library'''</span></div>
+
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Library'''</span></div>  
 
*[[Hydro Project archive|Project archive]]  
 
*[[Hydro Project archive|Project archive]]  
 
*[[MHP Manuals|Manuals]]  
 
*[[MHP Manuals|Manuals]]  
Line 86: Line 87:
  
 
|-
 
|-
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''External Links'''</span></div>
+
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''External Links'''</span></div>  
 
*[http://microhydropower.net/index.php MHP Portal]  
 
*[http://microhydropower.net/index.php MHP Portal]  
 
*[http://web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTENERGY/EXTRETOOLKIT/0,,contentMDK:20768499~menuPK:2069822~pagePK:64168427~piPK:64168435~theSitePK:1040428,00.html RE Toolkit]<br>
 
*[http://web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTENERGY/EXTRETOOLKIT/0,,contentMDK:20768499~menuPK:2069822~pagePK:64168427~piPK:64168435~theSitePK:1040428,00.html RE Toolkit]<br>
  
 
|-
 
|-
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Discussions'''</span></div>
+
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Discussions'''</span></div>  
*[http://www.endev.info/wiki/index.php/MHP_discussion_group PSP Hydro - Rwanda - Qs and As]
+
*[http://www.endev.info/wiki/index.php/MHP_discussion_group PSP Hydro - Rwanda - Qs and As]  
 
*projekt<br>
 
*projekt<br>
  

Revision as of 10:55, 28 April 2009

Hydro.jpg
 Welcome to the Hydro section


Technological Aspects
  • Civil engineering
  • Power equipment (turbines, generators, …)
  • Control equipment
  • Transfer of technology (incl. licensing issue)
  • Upgrading of water mills, rehabilitation of existing power plants
  • Local production capacity for power equipment, tubes, wiring etc.(technical and management capacity)
  • Institutional set-up
  • Overall institutional set-up at national level (incl. rural electrification agencies)
  • International organisations
  • How to Plan a MHPP in brief
Policy Framework
  • Typical regulations for the installation and operation of small hydro power plants
  • Feed-in policies
  • Energy planning for rural areas (national level, local level)
  • Promotional instruments
Operation and Business Models
  • Promotion of local planning / design capacities
  • Modes of operation (public, private, community-based, …)
  • Promotion of private sector participation – Operator models / business set-up
  • Metering and billing systems (metering, flat-rate / limiters, pre-payment)
  • Tariffs
  • Operation and maintenance (models, training approaches, …)
Financing Models
  • Grants, subsidies
  • Soft loans
  • Commercial loans
  • Venture capital
  • Involvment of MFIs, commercial banks, governmental financial institutions
  • Risk coverage (for project preparation, for constrcution phase, operation phase)
Social and environmental Impacts
  • Monitoring (socio-economic studies, baseline studies, …)
  • Conflict-sensitive project design (incl. household selection, tariffs, cross-subsidization)
  • Social implications of load management
  • Integration of gender issues
  • Consumer awareness and communication
  • Environmental impact assessments
Climate change-related issues
  • CDM, bundling, CDM Programme of Activities
  • Climate proofing of projects
Frequently Asked Questions
Projects
Library
External Links
Discussions