Difference between revisions of "Portal:Hydro"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
Line 1: Line 1:
{| width="100%" cellspacing="0" cellpadding="0" border="0" class="FCK__ShowTableBorders"
+
{| class="FCK__ShowTableBorders" cellspacing="0" cellpadding="0" width="100%" border="0"
 
|-
 
|-
| width="30" bgcolor="#1066ff" | [[Image:Hydro.jpg]]<br>  
+
| width="30" bgcolor="#1066ff" | [[Image:Hydro.jpg]]<br>
| width="870" bgcolor="#99ccff" | <div style="border-bottom: 0px solid rgb(70, 130, 180); padding: 0px; font-size: 140%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''&nbsp;Welcome to the Hydro section'''</span></div>
+
| width="870" bgcolor="#99ccff" | <div style="padding-right: 0px; padding-left: 0px; font-size: 140%; padding-bottom: 0px; padding-top: 0px; border-bottom: rgb(70,130,180) 0px solid; text-align: left"><span style="color: rgb(0,0,0)">'''&nbsp;Welcome to the Hydro section'''</span></div>
 
|}
 
|}
  
<br>  
+
<br>
  
{| width="100%" cellspacing="2" cellpadding="0" border="0" class="FCK__ShowTableBorders"
+
{| class="FCK__ShowTableBorders" cellspacing="2" cellpadding="0" width="100%" border="0"
 
|-
 
|-
 
| width="50%" |  
 
| width="50%" |  
{| width="100%" cellspacing="1" cellpadding="1" border="0" class="FCK__ShowTableBorders"
+
{| class="FCK__ShowTableBorders" cellspacing="1" cellpadding="1" width="100%" border="0"
 
|-
 
|-
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Technological Aspects'''</span><br></div>  
+
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Technological Aspects'''</span><br></div>
 
*Civil engineering  
 
*Civil engineering  
 
*Power equipment (turbines, generators, …)  
 
*Power equipment (turbines, generators, …)  
 
*Control equipment  
 
*Control equipment  
 
*Transfer of technology (incl. licensing issue)  
 
*Transfer of technology (incl. licensing issue)  
*Upgrading of water mills, rehabilitation of existing power plants  
+
*[[bla|Upgrading of water mills, rehabilitation of existing power plants]]
 
*Local production capacity for power equipment, tubes, wiring etc.(technical and management capacity)  
 
*Local production capacity for power equipment, tubes, wiring etc.(technical and management capacity)  
 
*Institutional set-up  
 
*Institutional set-up  
Line 25: Line 25:
  
 
|-
 
|-
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Policy Framework'''</span></div>  
+
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Policy Framework'''</span></div>
 
*Typical regulations for the installation and operation of small hydro power plants  
 
*Typical regulations for the installation and operation of small hydro power plants  
 
*Feed-in policies  
 
*Feed-in policies  
Line 32: Line 32:
  
 
|-
 
|-
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Operation and Business Models'''</span></div>  
+
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Operation and Business Models'''</span></div>
 
*Promotion of local planning / design capacities  
 
*Promotion of local planning / design capacities  
 
*Modes of operation (public, private, community-based, …)  
 
*Modes of operation (public, private, community-based, …)  
Line 41: Line 41:
  
 
|-
 
|-
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Financing Models'''</span></div>  
+
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Financing Models'''</span></div>
 
*Grants, subsidies  
 
*Grants, subsidies  
 
*Soft loans  
 
*Soft loans  
Line 50: Line 50:
  
 
|-
 
|-
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Social and environmental Impacts '''</span></div>  
+
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Social and environmental Impacts '''</span></div>
 
*Monitoring (socio-economic studies, baseline studies, …)  
 
*Monitoring (socio-economic studies, baseline studies, …)  
 
*Conflict-sensitive project design (incl. household selection, tariffs, cross-subsidization)  
 
*Conflict-sensitive project design (incl. household selection, tariffs, cross-subsidization)  
Line 59: Line 59:
  
 
|-
 
|-
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Climate change-related issues'''</span></div>  
+
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Climate change-related issues'''</span></div>
 
*CDM, bundling, CDM Programme of Activities  
 
*CDM, bundling, CDM Programme of Activities  
 
*Climate proofing of projects
 
*Climate proofing of projects
Line 66: Line 66:
  
 
| width="50%" |  
 
| width="50%" |  
{| width="100%" cellspacing="1" cellpadding="1" border="0" class="FCK__ShowTableBorders"
+
{| class="FCK__ShowTableBorders" cellspacing="1" cellpadding="1" width="100%" border="0"
 
|-
 
|-
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Frequently Asked Questions'''</span></div>  
+
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Frequently Asked Questions'''</span></div>
 
*[[HydroFaQ|... on Hydro ]]<br>
 
*[[HydroFaQ|... on Hydro ]]<br>
  
 
|-
 
|-
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Projects'''</span>[[EnDev-Benin stoves|<br>]]</div>  
+
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Projects'''</span>[[EnDev-Benin stoves|<br>]]</div>
*[[EnDev-Bolivia|Bolivia]][[EnDev-Burkina Faso|<br>]]  
+
*[[EnDev-Bolivia|Bolivia]][[EnDev-Burkina Faso|<br>]]
*[[EnDev-Ethiopia stoves|Ethiopia]]<br>  
+
*[[EnDev-Ethiopia stoves|Ethiopia]]<br>
 
*[[EnDev-Indonesia|Indonesia]]  
 
*[[EnDev-Indonesia|Indonesia]]  
 
*[[EnDev-Rwanda r.e.|Rwanda]]  
 
*[[EnDev-Rwanda r.e.|Rwanda]]  
Line 80: Line 80:
  
 
|-
 
|-
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Library'''</span></div>  
+
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Library'''</span></div>
 
*[[Hydro Project archive|Project archive]]  
 
*[[Hydro Project archive|Project archive]]  
 
*[[MHP Manuals|Manuals]]  
 
*[[MHP Manuals|Manuals]]  
Line 87: Line 87:
  
 
|-
 
|-
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''External Links'''</span></div>  
+
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''External Links'''</span></div>
 
*[http://microhydropower.net/index.php MHP Portal]  
 
*[http://microhydropower.net/index.php MHP Portal]  
 
*[http://web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTENERGY/EXTRETOOLKIT/0,,contentMDK:20768499~menuPK:2069822~pagePK:64168427~piPK:64168435~theSitePK:1040428,00.html RE Toolkit]<br>
 
*[http://web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTENERGY/EXTRETOOLKIT/0,,contentMDK:20768499~menuPK:2069822~pagePK:64168427~piPK:64168435~theSitePK:1040428,00.html RE Toolkit]<br>
  
 
|-
 
|-
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Discussions'''</span></div>  
+
| <div style="padding-right: 4px; padding-left: 4px; font-size: 120%; padding-bottom: 1px; padding-top: 1px; border-bottom: rgb(70,130,180) 1px solid; text-align: left"><span style="color: rgb(0,0,0)">'''Discussions'''</span></div>
 
*[http://www.endev.info/wiki/index.php/MHP_discussion_group PSP Hydro - Rwanda - Qs and As]  
 
*[http://www.endev.info/wiki/index.php/MHP_discussion_group PSP Hydro - Rwanda - Qs and As]  
 
*projekt<br>
 
*projekt<br>

Revision as of 10:42, 15 May 2009

Hydro.jpg
 Welcome to the Hydro section


Technological Aspects
Policy Framework
  • Typical regulations for the installation and operation of small hydro power plants
  • Feed-in policies
  • Energy planning for rural areas (national level, local level)
  • Promotional instruments
Operation and Business Models
  • Promotion of local planning / design capacities
  • Modes of operation (public, private, community-based, …)
  • Promotion of private sector participation – Operator models / business set-up
  • Metering and billing systems (metering, flat-rate / limiters, pre-payment)
  • Tariffs
  • Operation and maintenance (models, training approaches, …)
Financing Models
  • Grants, subsidies
  • Soft loans
  • Commercial loans
  • Venture capital
  • Involvment of MFIs, commercial banks, governmental financial institutions
  • Risk coverage (for project preparation, for constrcution phase, operation phase)
Social and environmental Impacts
  • Monitoring (socio-economic studies, baseline studies, …)
  • Conflict-sensitive project design (incl. household selection, tariffs, cross-subsidization)
  • Social implications of load management
  • Integration of gender issues
  • Consumer awareness and communication
  • Environmental impact assessments
Climate change-related issues
  • CDM, bundling, CDM Programme of Activities
  • Climate proofing of projects
Frequently Asked Questions
Projects
Library
External Links
Discussions