Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Portal:Hydro"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 21: Line 21:
 
*Institutional set-up  
 
*Institutional set-up  
 
*Overall institutional set-up at national level (incl. rural electrification agencies)  
 
*Overall institutional set-up at national level (incl. rural electrification agencies)  
*[[International organisations |International organisations]]
+
*[[International organisations|International organisations]]  
 
*[[How to Plan a MHPP in brief|How to Plan a MHPP in brief]]
 
*[[How to Plan a MHPP in brief|How to Plan a MHPP in brief]]
  
 
|-
 
|-
 
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Policy Framework'''</span></div>  
 
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Policy Framework'''</span></div>  
*Typical regulations for the installation and operation of small hydro power plants  
+
*[[# Typical regulations for the installation and operation of small hydro power plants|Typical regulations for the installation and operation of small hydro power plants]]
 
*Feed-in policies  
 
*Feed-in policies  
 
*Energy planning for rural areas (national level, local level)  
 
*Energy planning for rural areas (national level, local level)  

Revision as of 18:22, 3 June 2009

Hydro.jpg
 Welcome to the Hydro section


Technological Aspects
  • Civil engineering
  • Power equipment (turbines, generators, …)
  • Control equipment
  • Transfer of technology (incl. licensing issue)
  • Upgrading of water mills, rehabilitation of existing power plants
  • Local production capacity for power equipment, tubes, wiring etc.(technical and management capacity)
  • Institutional set-up
  • Overall institutional set-up at national level (incl. rural electrification agencies)
  • International organisations
  • How to Plan a MHPP in brief
Policy Framework
Operation and Business Models
  • Promotion of local planning / design capacities
  • Modes of operation (public, private, community-based, …)
  • Promotion of private sector participation – Operator models / business set-up
  • Metering and billing systems (metering, flat-rate / limiters, pre-payment)
  • Tariffs
  • Operation and maintenance (models, training approaches, …)
Financing Models
  • Grants, subsidies
  • Soft loans
  • Commercial loans
  • Venture capital
  • Involvment of MFIs, commercial banks, governmental financial institutions
  • Risk coverage (for project preparation, for constrcution phase, operation phase)
Social and environmental Impacts
  • Monitoring (socio-economic studies, baseline studies, …)
  • Conflict-sensitive project design (incl. household selection, tariffs, cross-subsidization)
  • Social implications of load management
  • Integration of gender issues
  • Consumer awareness and communication
  • Environmental impact assessments
Climate change-related issues
  • CDM, bundling, CDM Programme of Activities
  • Climate proofing of projects
Frequently Asked Questions
Projects
Library
External Links
Discussions