Difference between revisions of "Portal:Hydro"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 38: Line 38:
 
*[[Metering and billing systems|Metering and billing systems]] (metering, flat-rate / limiters, pre-payment)  
 
*[[Metering and billing systems|Metering and billing systems]] (metering, flat-rate / limiters, pre-payment)  
 
*[[Tariffs|Tariffs]]  
 
*[[Tariffs|Tariffs]]  
*Operation and maintenance (models, training approaches, …)
+
*[[Operation and maintenance|Operation and maintenance]] (models, training approaches, …)
  
 
|-
 
|-

Revision as of 16:40, 14 June 2009

Hydro.jpg
 Welcome to the Hydro section


Technological Aspects
  • Civil engineering
  • Power equipment (turbines, generators, …)
  • Control equipment
  • Transfer of technology (incl. licensing issue)
  • Upgrading of water mills, rehabilitation of existing power plants
  • Local production capacity for power equipment, tubes, wiring etc.(technical and management capacity)
  • Institutional set-up
  • Overall institutional set-up at national level (incl. rural electrification agencies)
  • International organisations
  • How to Plan a MHPP in brief
Policy Framework
Operation and Business Models
Financing Models
  • Grants, subsidies
  • Soft loans
  • Commercial loans
  • Venture capital
  • Involvment of MFIs, commercial banks, governmental financial institutions
  • Risk coverage (for project preparation, for constrcution phase, operation phase)
Social and environmental Impacts
  • Socio-economic development
  • Monitoring (socio-economic studies, baseline studies, …)
  • Conflict-sensitive project design (incl. household selection, tariffs, cross-subsidization)
  • Social implications of load management
  • Integration of gender issues
  • Consumer awareness and communication
  • Environmental impact assessments
Climate change-related issues
Frequently Asked Questions
Projects
Library
External Links
Discussions