Difference between revisions of "Prospects for Electricity Access in Rural India using Solar Photo-Voltaic based Mini-Grid Systems"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
Line 32: Line 32:
 
• Observer research foundation in Mumbai –worked in the passed –Shruti<br/>• Ladakh very remote area, northernmost part<br/>• Largest amount of people still lacking access to electricity<br/>• Very blessed with solar energy- the entire country<br/>• The best practices are applicable to any energy<br/>• Biggest challenge comes from policy and entrepreneurship- issues with tendering etc<br/>• There is a clear mandate and will by Indian government to use sustainable electricity projects<br/>• ;arge parts of india in markets run on diesel. They do not focus on those people believe that grd is going to reach at some point<br/>• 39 households- small village. Just lighting solutions cannot keep mini grids sustainable. Strong community involvement: Darewadi<br/>• Were fine without electricity, primary agriculture activities<br/>• 30-35 year want the technology to stay to cover costs<br/>• Mini grid transferring everything to the community<br/>• Households use kerosene for lighting and wanted to access entertainment like in the city. Lighting means that you can always go back to kerosene therefore wanted to focus NOT only on lighting. Pumps are VERY important now (for water). Photocopy machine can run on energy and this is a discovered use of electricity<br/>• In the very bad monsoon months there is a drop in electricity<br/>• Have a metered connection of about 20 rupees of kw/h. but this should be enough to cover costs of batteries. Monthly bill comes every month. For the next 4-5 years it can function. Makes system sustainable<br/>• As pumps kicked in, now the use of energy has increased and therefore can help in battery change and even generate revenue<br/>• Quality of installation is up to utility specification and can be long term<br/>• People in the village can connect to a wider system not just a tiny system<br/>• Complete transfer of ownership- higher intensity of keeping care of system<br/>
 
• Observer research foundation in Mumbai –worked in the passed –Shruti<br/>• Ladakh very remote area, northernmost part<br/>• Largest amount of people still lacking access to electricity<br/>• Very blessed with solar energy- the entire country<br/>• The best practices are applicable to any energy<br/>• Biggest challenge comes from policy and entrepreneurship- issues with tendering etc<br/>• There is a clear mandate and will by Indian government to use sustainable electricity projects<br/>• ;arge parts of india in markets run on diesel. They do not focus on those people believe that grd is going to reach at some point<br/>• 39 households- small village. Just lighting solutions cannot keep mini grids sustainable. Strong community involvement: Darewadi<br/>• Were fine without electricity, primary agriculture activities<br/>• 30-35 year want the technology to stay to cover costs<br/>• Mini grid transferring everything to the community<br/>• Households use kerosene for lighting and wanted to access entertainment like in the city. Lighting means that you can always go back to kerosene therefore wanted to focus NOT only on lighting. Pumps are VERY important now (for water). Photocopy machine can run on energy and this is a discovered use of electricity<br/>• In the very bad monsoon months there is a drop in electricity<br/>• Have a metered connection of about 20 rupees of kw/h. but this should be enough to cover costs of batteries. Monthly bill comes every month. For the next 4-5 years it can function. Makes system sustainable<br/>• As pumps kicked in, now the use of energy has increased and therefore can help in battery change and even generate revenue<br/>• Quality of installation is up to utility specification and can be long term<br/>• People in the village can connect to a wider system not just a tiny system<br/>• Complete transfer of ownership- higher intensity of keeping care of system<br/>
  
• Leakage in the system if don’t sustain: battery, tariff stricture, community interaction, ownership transfer or design aspirations (not only focus on lighting)<br/>• A lot of migration in urban center for entertainment <br/>• 25-year period can sustain the project <br/>• Developmental angle came into village just because of access to energy<br/>• Average daily sunshine 3.5-4 kw of usable power per kw installed<br/>• At least maintain micro grids for 25 years it’s a success because others have failed<br/>• US$7 billion- the cost used to extend the grid in the country- by government<br/>• Person trained to sustain system on day-to-day basis<br/>• Pumping load- do not need energy backup of can push usage to the time <br/>• Very simple installations so easily sustainable. Can get trained. The willpower is there, aspiration is there<br/>
+
• Leakage in the system if don’t sustain: battery, tariff stricture, community interaction, ownership transfer or design aspirations (not only focus on lighting)<br/>• A lot of migration in urban center for entertainment<br/>• 25-year period can sustain the project<br/>• Developmental angle came into village just because of access to energy<br/>• Average daily sunshine 3.5-4 kw of usable power per kw installed<br/>• At least maintain micro grids for 25 years it’s a success because others have failed<br/>• US$7 billion- the cost used to extend the grid in the country- by government<br/>• Person trained to sustain system on day-to-day basis<br/>• Pumping load- do not need energy backup of can push usage to the time<br/>• Very simple installations so easily sustainable. Can get trained. The willpower is there, aspiration is there<br/>
  
 
<br/>
 
<br/>
  
 
== Questions Posed ==
 
== Questions Posed ==
 +
 +
Question to scale up: what are the main challenges? <br/>-Technology will work but the challenge is in meeting the local needs and operational scheme to meet the local needs. <br/>-Have to understand the local scenario. <br/>-The financial component has to incorporate the international funding. <br/>-Policy is a challenge. Growth still focused on grid connection in India. Now changing to what kind of schemes would work for entrepreneurs. <br/>-Combination of international cooperation
 +
 +
How projects enhance quality of life<br/>-Pumps work for water so women have more time<br/>-Cook stoves<br/>-Community consciousness with more and more projects<br/>-Understand that electricity is important
 +
 +
Spark interest in electricity. <br/>-Learn though the process<br/>-Refrigerator<br/>-What should we really provide? Need to match demand with supply
 +
 +
Have to cover policy issues: what if government grid extends and then what will happen to the mini-grid?
 +
 +
Micro grids- policy<br/>-Micro grids not based on renewables in place<br/>-The state today has failed to take electricity to all its citizens and therefore there are mini-grids<br/>-5 or 10 rupees charged for energy and there’s a overload. The government has set the threshold too high and therefore there is over demand and the grids have failed<br/>-Diesel more expensive and solar more expensive than the national grid in Bangladesh<br/>-How much pay for lighting- cost stays about the same for mini-grid and if stayed on kerosene. Cost reduced though when focus on lighting because LED lights are very efficient. <br/>
  
 
<br/>
 
<br/>
Line 46: Line 56:
 
__NOEDITSECTION__
 
__NOEDITSECTION__
  
 +
[[Category:Conference_Documentation]]
 +
[[Category:Energy_Access]]
 +
[[Category:Solar]]
 +
[[Category:Photovoltaic]]
 +
[[Category:Mini-grid]]
 +
[[Category:India]]
 
[[Category:Rural_Electrification]]
 
[[Category:Rural_Electrification]]
[[Category:India]]
 
[[Category:Mini-grid]]
 
[[Category:Photovoltaic]]
 
[[Category:Solar]]
 
[[Category:Energy_Access]]
 
[[Category:Conference_Documentation]]
 

Revision as of 13:55, 30 April 2014

Innovating Energy Access for Remote Areas: Discovering Untapped Resources
About the International DAAD-Alumni Summer School, Sustainable Provision of Rural RE
Programme
Participants Presentations
Speaker Presentations


Prospects for Electricity Access in Rural India using Solar Photo-Voltaic based Mini-Grid Systems

Presenters: Anshuman Lath (Gram Oorja Solutions Private Limited) and Shruti Mahajan Deorah (Goldmann School of Public Policy, UC Berkeley)


Overview

Solar photovoltaic (PV) based mini-grid systems have the potential to be an environmentally friendly and sustainable long term solution for electricity access in India. However, the high upfront costs of these mini-grids present policy makers, entrepreneurs and consumers alike with difficulties in financing them. Other challenges to their implementation stem from socio-economic issues and from the lack of adequate support from government agencies. We assess the potential for deploying solar PV based mini-grids to provide on demand electricity access, beyond just lighting. We describe one very high-quality installation in detail, in operation for 20 months now, that exemplifies several of the challenges involved in providing end-to-end solutions in rural India, as well as some solutions. We review the policy measures of the Indian government in the context of scaling out such innovative solutions, and argue that government must work together with entrepreneurs to create an Energy revolution akin to the Green revolution in India in the 1970s[1].
File:Experience from First Solar Mini Grid Service in Bangladesh.pdf


Main Topics Discussed

• Observer research foundation in Mumbai –worked in the passed –Shruti
• Ladakh very remote area, northernmost part
• Largest amount of people still lacking access to electricity
• Very blessed with solar energy- the entire country
• The best practices are applicable to any energy
• Biggest challenge comes from policy and entrepreneurship- issues with tendering etc
• There is a clear mandate and will by Indian government to use sustainable electricity projects
• ;arge parts of india in markets run on diesel. They do not focus on those people believe that grd is going to reach at some point
• 39 households- small village. Just lighting solutions cannot keep mini grids sustainable. Strong community involvement: Darewadi
• Were fine without electricity, primary agriculture activities
• 30-35 year want the technology to stay to cover costs
• Mini grid transferring everything to the community
• Households use kerosene for lighting and wanted to access entertainment like in the city. Lighting means that you can always go back to kerosene therefore wanted to focus NOT only on lighting. Pumps are VERY important now (for water). Photocopy machine can run on energy and this is a discovered use of electricity
• In the very bad monsoon months there is a drop in electricity
• Have a metered connection of about 20 rupees of kw/h. but this should be enough to cover costs of batteries. Monthly bill comes every month. For the next 4-5 years it can function. Makes system sustainable
• As pumps kicked in, now the use of energy has increased and therefore can help in battery change and even generate revenue
• Quality of installation is up to utility specification and can be long term
• People in the village can connect to a wider system not just a tiny system
• Complete transfer of ownership- higher intensity of keeping care of system

• Leakage in the system if don’t sustain: battery, tariff stricture, community interaction, ownership transfer or design aspirations (not only focus on lighting)
• A lot of migration in urban center for entertainment
• 25-year period can sustain the project
• Developmental angle came into village just because of access to energy
• Average daily sunshine 3.5-4 kw of usable power per kw installed
• At least maintain micro grids for 25 years it’s a success because others have failed
• US$7 billion- the cost used to extend the grid in the country- by government
• Person trained to sustain system on day-to-day basis
• Pumping load- do not need energy backup of can push usage to the time
• Very simple installations so easily sustainable. Can get trained. The willpower is there, aspiration is there


Questions Posed

Question to scale up: what are the main challenges?
-Technology will work but the challenge is in meeting the local needs and operational scheme to meet the local needs.
-Have to understand the local scenario.
-The financial component has to incorporate the international funding.
-Policy is a challenge. Growth still focused on grid connection in India. Now changing to what kind of schemes would work for entrepreneurs.
-Combination of international cooperation

How projects enhance quality of life
-Pumps work for water so women have more time
-Cook stoves
-Community consciousness with more and more projects
-Understand that electricity is important

Spark interest in electricity.
-Learn though the process
-Refrigerator
-What should we really provide? Need to match demand with supply

Have to cover policy issues: what if government grid extends and then what will happen to the mini-grid?

Micro grids- policy
-Micro grids not based on renewables in place
-The state today has failed to take electricity to all its citizens and therefore there are mini-grids
-5 or 10 rupees charged for energy and there’s a overload. The government has set the threshold too high and therefore there is over demand and the grids have failed
-Diesel more expensive and solar more expensive than the national grid in Bangladesh
-How much pay for lighting- cost stays about the same for mini-grid and if stayed on kerosene. Cost reduced though when focus on lighting because LED lights are very efficient.


References

  1. Prospects for Electricity Access in Rural India using Solar Photovoltaic based Mini-Grid Systems. Leena Chandran-Wadia, Shruti Mahajan Deorah, Sameer Nair and Anshuman Lath.