Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Provision of PV System Installation Verification Services"

From energypedia
***** (***** | *****)
m (Text replace - "RET" to "PRC")
***** (***** | *****)
m
 
(9 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{RE Toolkit Database
 
|PRC title=Provision of PV System Installation Verification Services
 
|PRC language=English
 
|PRC file en=Provision of PV System Installation Verification Services.doc
 
|PRC file fr=
 
|PRC file ar=
 
|PRC file sp=
 
|PRC file cn=
 
|PRC file ru=
 
|PRC file pr=
 
|PRC file other=
 
|PRC type general=Terms of Reference
 
|PRC type terms=Job Descriptions/Project Staff
 
|PRC type other=
 
|PRC technology=Hybrid; PV
 
|PRC abstract=Provision of PV System Installation Verification Services
 
  
 
+
{{Project Resource Center
 
+
|REPRC title=Provision of PV System Installation Verification Services
The objective of this TOR is to confirm for each company participating to the grant, that 25 PV systems (PV modules or PV/wind hybrid systems) meet precise eligibility requirements. The systems are previously selected the Project Management Office (PMO) of the Commission in charge of State Economy and Trade. The consultant therefore confirms eligibility criteria through verification questionnaires and surveys.
+
|REPRC language=English
 +
|REPRC file ar=
 +
|REPRC file cn=
 +
|REPRC file en=Provision of PV System Installation Verification Services.doc
 +
|REPRC file fr=
 +
|REPRC file pr=
 +
|REPRC file ru=
 +
|REPRC file sp=
 +
|REPRC file other=
 +
|REPRC type general=Terms of Reference
 +
|REPRC type terms=Audits & Verification Services
 +
|REPRC type other=
 +
|REPRC technology hybrid=Hybrid
 +
|REPRC technology solar=Solar
 +
|REPRC technology wind=Wind
 +
|REPRC technology solar sub=Photovoltaic (PV)
 +
|REPRC abstract=The objective of this TOR is to confirm for each company participating to the grant, that 25 PV systems (PV modules or PV/wind hybrid systems) meet precise eligibility requirements. The systems are previously selected the Project Management Office (PMO) of the Commission in charge of State Economy and Trade. The consultant therefore confirms eligibility criteria through verification questionnaires and surveys.
 
}}
 
}}
  
 +
[[Category:REPRC_Hybrid]]
 +
[[Category:Photovoltaic_(PV)]]
 
[[Category:Project_Resource_Center]]
 
[[Category:Project_Resource_Center]]
[[Category:PRC_Terms_of_Reference]]
+
[[Category:Wind]]
 +
[[Category:REPRC_Terms_of_Reference]]
 
[[Category:Hybrid_Systems]]
 
[[Category:Hybrid_Systems]]
[[Category:PV]]
+
[[Category:REPRC_Wind]]

Latest revision as of 11:03, 11 June 2014



Provision of PV System Installation Verification Services

Title of Document Provision of PV System Installation Verification Services
Abstract The objective of this TOR is to confirm for each company participating to the grant, that 25 PV systems (PV modules or PV/wind hybrid systems) meet precise eligibility requirements. The systems are previously selected the Project Management Office (PMO) of the Commission in charge of State Economy and Trade. The consultant therefore confirms eligibility criteria through verification questionnaires and surveys.
File Download

English: Provision of PV System Installation Verification Services.doc

Original Source
Year
Region/Country
Language(s) English
Document Type Terms of Reference - Audits & Verification Services
Technology Solar Photovoltaic (PV)
Wind
Hybrid
Connection Type



Solar Wind