Difference between revisions of "SPIS Toolbox - Assess Financial Viability"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
(4 intermediate revisions by one other user not shown)
Line 1: Line 1:
 
{{SPIS Design}}
 
{{SPIS Design}}
 +
 
{| cellpadding="1"
 
{| cellpadding="1"
 
|-
 
|-
 
| {{Back to SPIS Toolbox 2}}
 
| {{Back to SPIS Toolbox 2}}
|
+
|  
 
| {{Back to Design}}
 
| {{Back to Design}}
|
+
|  
| style="width: 150px; background-color: rgb(222, 226, 192);" | <span style="color:#000000;"><span style="font-size: 90%">'''[[SPIS_Toolbox_-_Pre-select_Potential_Suppliers|►Go to the Next Chapter]]</span></span>
+
| style="width: 150px; background-color: rgb(222, 226, 192);" | <span style="color:#000000;"><span style="font-size: 90%">'''[[SPIS Toolbox - Pre-select Potential Suppliers|►Go to the Next Chapter]]'''</span></span>
 
|}
 
|}
  
Line 13: Line 14:
 
Solar Powered Irrigation Systems have become a financially viable alternative to electric and diesel water pumps for irrigation of agriculture crops. This is mainly due to the fact that:
 
Solar Powered Irrigation Systems have become a financially viable alternative to electric and diesel water pumps for irrigation of agriculture crops. This is mainly due to the fact that:
  
*PV module costs have declined in recent years;<br/>
+
*PV module costs have declined in recent years;
*PV systems are more reliable and cost effective;<br/>
+
*PV systems are more reliable and cost effective;
*PV equipment is more accessible in many parts of the world, including expertise for setup and maintenance.
+
*PV equipment is more accessible in many parts of the world, including expertise for set up and maintenance.
 +
 
 +
The tools '''INVEST – Farm Analysis Tool''' and '''INVEST – Payback Tool''' (under the '''[[SPIS Invest|INVEST]]''' Module) are both designed to assist in determining financial viability of the SPIS. While the former allows for assessing the profitability of the farm enterprise, the latter compares that payback potential of different irrigation technologies.
 +
 
 +
{| style="width: 100%" cellspacing="1" cellpadding="1" border="0"
 +
|-
 +
| style="background-color: rgb(225, 229, 205)" |
 +
Note: cost estimates needed for these tools should be secured from technology and service suppliers.
 +
 
 +
|}
  
 
The following key indicators and financial statements help to assess the financial viability:
 
The following key indicators and financial statements help to assess the financial viability:
Line 42: Line 52:
 
<br/>
 
<br/>
  
Assessing the financial viability of the SPIS is a complex procedure which should be accompanied by financial experts. This part of the module only gives an overview of key data and indicators to be generated. Note that all projections and calculations:
+
Assessing the financial viability of a SPIS is a complex procedure, which should be discussed with financial experts. This module only gives an overview of key data required. Note that all calculations:
  
*need to be based on prices which can be determined but also on estimates and assumptions;<br/>
+
*need to be based on prices which can be determined but also on estimates and assumptions;
*will be contemplating the current situation and future scenarios;
+
*will have to consider the current situation and future scenarios;
*should compare options for alternative pumping systems (electric, diesel).<br/>
+
*should compare options for alternative pumping systems (electric, diesel).
  
 
The financial analysis builds on three major inputs:<br/>
 
The financial analysis builds on three major inputs:<br/>
Line 56: Line 66:
 
</ol>
 
</ol>
  
2. '''Capital expenditure (CAPEX)'''= long term, one-time, investments in non-consumable parts of the business, like<br/>
+
2. '''Capital expenditure (CAPEX)''': long term, one-time, investments in non-consumable parts of the business, like<br/>
 
<ol style="list-style-type:lower-alpha;">
 
<ol style="list-style-type:lower-alpha;">
 
<li>costs for solar pumping system, reservoir, irrigation system;</li>
 
<li>costs for solar pumping system, reservoir, irrigation system;</li>
Line 64: Line 74:
 
</ol>
 
</ol>
  
3. '''Operating expenses (OPEX)'''= ongoing operational and maintenance costs (fixed and variable)<br/>
+
3. '''Operating expenses (OPEX)''': ongoing operational and maintenance costs (fixed and variable)<br/>
 
<ol style="list-style-type:lower-alpha;">
 
<ol style="list-style-type:lower-alpha;">
 
<li>seeds, fertilizer, pesticides and other inputs for production;<br/></li>
 
<li>seeds, fertilizer, pesticides and other inputs for production;<br/></li>
Line 73: Line 83:
 
</ol>
 
</ol>
  
==== '''<span style="color:#879637;">Outcome/Product</span>''' ====  
+
==== '''<span style="color:#879637;">Outcome/Product</span>''' ====
  
 
*Cash flow projections;
 
*Cash flow projections;
Line 81: Line 91:
 
*Total life cycle costs of the SPIS investment.
 
*Total life cycle costs of the SPIS investment.
  
==== '''<span style="color:#879637;">Data Requirements</span>''' ====  
+
==== '''<span style="color:#879637;">Data Requirements</span>''' ====
  
 
===== '''Research, collect, analyze, cross-check:''' =====
 
===== '''Research, collect, analyze, cross-check:''' =====
Line 88: Line 98:
 
*capital expenditures / initial capital investment (i.e. prices for components to be financed) for solar and alternative options
 
*capital expenditures / initial capital investment (i.e. prices for components to be financed) for solar and alternative options
 
*sales revenues (market prices);
 
*sales revenues (market prices);
*operating and maintenance costs (prices);
+
*operating and maintenance costs;
 
*macroeconomic variables (inflation, interest rates, etc.);
 
*macroeconomic variables (inflation, interest rates, etc.);
 
*tax policies (corporate income taxes, VAT dynamics, etc.);
 
*tax policies (corporate income taxes, VAT dynamics, etc.);
Line 98: Line 108:
 
*CAPEX (capital expenditure); i.e. total/annual sum for financing investment in SPIS (and alternative system).
 
*CAPEX (capital expenditure); i.e. total/annual sum for financing investment in SPIS (and alternative system).
  
==== '''<span style="color:#879637;">People/Stakeholders</span>''' ====  
+
==== '''<span style="color:#879637;">People/Stakeholders</span>''' ====
  
 
*Agricultural service provider;
 
*Agricultural service provider;
Line 106: Line 116:
 
*Market analysts/consultants;
 
*Market analysts/consultants;
  
==== '''<span style="color:#879637;">Important Issues</span>''' ====  
+
==== '''<span style="color:#879637;">Important Issues</span>''' ====
  
 
When comparing PV systems to diesel or electric pumping systems the following statements apply:
 
When comparing PV systems to diesel or electric pumping systems the following statements apply:
Line 117: Line 127:
  
 
These factors influence the financial viability of the different options; hence, different scenarios should be elaborated before taking a decision.
 
These factors influence the financial viability of the different options; hence, different scenarios should be elaborated before taking a decision.
 +
 +
 +
{| cellpadding="1"
 +
|-
 +
| {{Back to SPIS Toolbox 2}}
 +
|
 +
| {{Back to Design}}
 +
|
 +
| style="width: 150px; background-color: rgb(222, 226, 192);" | <span style="color:#000000;"><span style="font-size: 90%">'''[[SPIS Toolbox - Pre-select Potential Suppliers|►Go to the Next Chapter]]'''</span></span>
 +
|}
 
{{SPIS Reference}}
 
{{SPIS Reference}}

Revision as of 15:17, 3 April 2018

Get informedPromote & InitiateSafeguard WaterMarketInvestFinanceDesignSet UpIrrigateMaintainDesign.svg
►Back to the Start Page ►Back to the Module Page ►Go to the Next Chapter

6. Assess Financial Viability

Solar Powered Irrigation Systems have become a financially viable alternative to electric and diesel water pumps for irrigation of agriculture crops. This is mainly due to the fact that:

  • PV module costs have declined in recent years;
  • PV systems are more reliable and cost effective;
  • PV equipment is more accessible in many parts of the world, including expertise for set up and maintenance.

The tools INVEST – Farm Analysis Tool and INVEST – Payback Tool (under the INVEST Module) are both designed to assist in determining financial viability of the SPIS. While the former allows for assessing the profitability of the farm enterprise, the latter compares that payback potential of different irrigation technologies.

Note: cost estimates needed for these tools should be secured from technology and service suppliers.

The following key indicators and financial statements help to assess the financial viability:

Assessment criteria Used as it shows:
cf - Cash flow analysis ...if a project generates enough cash in order to stay liquid; i.e. it can pay all cash.
PP - Payback Period ...how long it takes for the cost of an investment to be recovered; very basic calculation.
NPV – Net Present Value
...if a project generates sufficient income (and surplus) to finance the employed capital and interest on that capital.
IRR – Internal Rate of Return
...the estimated profit rate generated by the project / investment over its life-span.
Total life cycle cost
...differences in costs between project alternatives over the entire life cycle of these alternatives.


Assessing the financial viability of a SPIS is a complex procedure, which should be discussed with financial experts. This module only gives an overview of key data required. Note that all calculations:

  • need to be based on prices which can be determined but also on estimates and assumptions;
  • will have to consider the current situation and future scenarios;
  • should compare options for alternative pumping systems (electric, diesel).

The financial analysis builds on three major inputs:

1. the revenues from

  1. direct: selling goods/services;
  2. indirect: avoided payments (e.g. consumption of food produced, or energy costs).

2. Capital expenditure (CAPEX): long term, one-time, investments in non-consumable parts of the business, like

  1. costs for solar pumping system, reservoir, irrigation system;
  2. (opportunity cost for) labor for construction and set up;
  3. equipment for processing, storage;
  4. reinvestment costs.

3. Operating expenses (OPEX): ongoing operational and maintenance costs (fixed and variable)

  1. seeds, fertilizer, pesticides and other inputs for production;
  2. costs for processing such as cleaning, packaging, quality control;
  3. maintenance, transport and advertising costs;
  4. labor costs, incl. opportunity cost for producers own work;
  5. depreciation and maybe credit costs to pay back a loan.

Outcome/Product

  • Cash flow projections;
  • Payback Period (pp);
  • Net Present Value (NPV);
  • Internal Rate of Return (IRR);
  • Total life cycle costs of the SPIS investment.

Data Requirements

Research, collect, analyze, cross-check:
  • project/SPIS functional lifetime;
  • capital expenditures / initial capital investment (i.e. prices for components to be financed) for solar and alternative options
  • sales revenues (market prices);
  • operating and maintenance costs;
  • macroeconomic variables (inflation, interest rates, etc.);
  • tax policies (corporate income taxes, VAT dynamics, etc.);
Compute, prepare:
  • water unit cost;
  • annual revenue and operating expenses (OPEX) and annual gross margin of production (current and future + other energy options);
  • CAPEX (capital expenditure); i.e. total/annual sum for financing investment in SPIS (and alternative system).

People/Stakeholders

  • Agricultural service provider;
  • Financial service providers;
  • Public entities promoting or/and subsidizing SPIS initiatives;
  • Farmers, associations of producers / potential lenders;
  • Market analysts/consultants;

Important Issues

When comparing PV systems to diesel or electric pumping systems the following statements apply:

  • CAPEX: Initial capital costs needed for a Diesel-based system are lower than PV solutions; however replacement costs for Diesel systems occur more frequently.
  • OPEX + cash flow:
    • diesel and electric systems have higher regular operating expenses (petrol cost + transport/energy price + grid connection) than PV;
    • maintenance costs for the PV system are low (see MAINTAIN module);
    • due to the high initial investment of PV systems they risk having higher regular financing costs (loan instalments and interest rate payments) when compared to diesel-based systems.

These factors influence the financial viability of the different options; hence, different scenarios should be elaborated before taking a decision.


►Back to the Start Page ►Back to the Module Page ►Go to the Next Chapter