Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "SPIS Toolbox - Contract Supplier"

From energypedia
***** (***** | *****)
***** (***** | *****)
(12 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<div>
+
{{SPIS Design}}
 +
{| cellpadding="1"
 +
|-
 +
| {{Back to SPIS Toolbox 2}}
 +
|
 +
| {{Back to Design}}
 +
|
 +
| style="width: 150px; background-color: rgb(222, 226, 192);" | <span style="color:#000000;"><span style="font-size: 90%">'''[[SPIS_Toolbox_-_Select_Suitable_Installer|►Go to the Next Chapter]]</span></span>
 +
|}
  
= Contract Supplier =
+
=== '''<span style="color:#879637;">9. Contract Supplier</span>''' ===
  
 
In a final step, the best system provider needs to be selected based on cost-quality considerations. In a meeting of the producer, the agricultural service provider and the shortlisted candidates, the following topics should be addressed:
 
In a final step, the best system provider needs to be selected based on cost-quality considerations. In a meeting of the producer, the agricultural service provider and the shortlisted candidates, the following topics should be addressed:
Line 13: Line 21:
 
*contract details and payment conditions.
 
*contract details and payment conditions.
  
The contract should only be concluded once allopen questions have been clarified.
+
The contract should only be concluded once all open questions have been clarified.  
  
 
In the '''negotiations''' with the supplier it is important to:
 
In the '''negotiations''' with the supplier it is important to:
Line 24: Line 32:
 
*make a final summary.
 
*make a final summary.
  
== Outcome / Product ==
+
====  '''<span style="color:#879637;">Outcome/Product</span>''' ====  
  
 
*Ultimate quality provider with the best cost-quality ratio;
 
*Ultimate quality provider with the best cost-quality ratio;
 
*Supply contract, including after- sale services.
 
*Supply contract, including after- sale services.
  
== Data Requirements ==
+
====  '''<span style="color:#879637;">Data Requirements</span>''' ====  
  
 
*Technical and financial quotations / offers;
 
*Technical and financial quotations / offers;
Line 36: Line 44:
 
*Clarification of open questions during negotiation.
 
*Clarification of open questions during negotiation.
  
== People / Stakeholders ==
+
====  '''<span style="color:#879637;">People/Stakeholders</span>''' ====  
  
 
*Producers;
 
*Producers;
Line 42: Line 50:
 
*Suppliers / system integrators.
 
*Suppliers / system integrators.
  
== Important issues ==
+
====  '''<span style="color:#879637;">Important Issues</span>''' ====  
  
*Quotations/offers often deviate from technical specifications;
+
*Quotations / offers often deviate from technical specifications;
 
*Significant differences exist between bidders in terms of services and warranty.
 
*Significant differences exist between bidders in terms of services and warranty.
 
*Implementation scheduling needs to be firm and agreed upon.
 
*Implementation scheduling needs to be firm and agreed upon.
 
*Negotiate with the supplier.
 
*Negotiate with the supplier.
 +
{{SPIS Reference}}
  
[[Category:SPIS_Module]]
+
 
[[Category:Powering_Agriculture]]
+
{| cellpadding="1"
[[Category:Tools]]
+
|-
 +
| {{Back to SPIS Toolbox 2}}
 +
|
 +
| {{Back to Design}}
 +
|
 +
| style="width: 150px; background-color: rgb(222, 226, 192);" | <span style="color:#000000;"><span style="font-size: 90%">'''[[SPIS_Toolbox_-_Select_Suitable_Installer|►Go to the Next Chapter]]</span></span>
 +
|}

Revision as of 15:18, 3 April 2018

Get informedPromote & InitiateSafeguard WaterMarketInvestFinanceDesignSet UpIrrigateMaintainDesign.svg
►Back to the Start Page ►Back to the Module Page ►Go to the Next Chapter

9. Contract Supplier

In a final step, the best system provider needs to be selected based on cost-quality considerations. In a meeting of the producer, the agricultural service provider and the shortlisted candidates, the following topics should be addressed:

  • detailed presentation of offer and the SPIS experience by provider;
  • explanation of design procedure and tools to be used (e.g. computer-based sizing);
  • product quality and safety certificates;
  • warranty, after-sale services and spare part supply (e.g. maintenance contracts);
  • final negotiation on price, if required;
  • implementation schedule;
  • contract details and payment conditions.

The contract should only be concluded once all open questions have been clarified.

In the negotiations with the supplier it is important to:

  • define your goals;
  • identify negotiation areas;
  • look for win-win situations;
  • make realistic proposals;
  • clear up misunderstandings;
  • make a final summary.

Outcome/Product

  • Ultimate quality provider with the best cost-quality ratio;
  • Supply contract, including after- sale services.

Data Requirements

  • Technical and financial quotations / offers;
  • Shortlisted candidates;
  • Structured comparison of qualified bids;
  • Clarification of open questions during negotiation.

People/Stakeholders

  • Producers;
  • Agricultural service providers;
  • Suppliers / system integrators.

Important Issues

  • Quotations / offers often deviate from technical specifications;
  • Significant differences exist between bidders in terms of services and warranty.
  • Implementation scheduling needs to be firm and agreed upon.
  • Negotiate with the supplier.


►Back to the Start Page ►Back to the Module Page ►Go to the Next Chapter