Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Saguling

From energypedia
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.


Back to the Hydropower Sites Database

General Information

Country: Indonesia
City/Town: Bandung
Coordinates (Powerhouse): 6° 54' 45.36" S, 107° 21' 58.68" E
Year of Commission: 1986
Basin Name:
Stream Name: Citarum
Developer:
Operator: PT Indonesia Power GBU Saguling.
Project Status: Completed
Any other uses of the water source:
Contact:
Comment:
Link to Photos:

Technical Information

Power: (kW) 700,000
Energy (kWh/a): 2,156,000,000
Capacity Factor (%): 35.15
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s):
Minimum Flow of the Stream (m³/s):
Head (m):
Turbine Type: Vertical axis Francis
Turbine Manufacturer: Toshiba Japan
Generator Type:
Generator Capacity (kW):
Generator Manufacturer: Melco Japan
Comment:

Mini/Island Grid Information

Mini Grid: No
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m):
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment: Regional Grid - PT PLN (Persero)

Dam Information

Dam Type:

Dam on river with reservoir
Dam Construction Material: Rock-fill Dam with Concrete Facing
Dam Height [m]: 99
Length of Dam [m]: 301.3
Storage Volume of Reservoir (m³): 881,000,000
Flood Storage of Reservoir:
Channel Material:
Comment: 200,000,000m lost to sedimentation

Economic Information

Cost (€):
Donor/Financier & Percentage:
Tariff Levels:
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown: