Difference between revisions of "Turbines in Private Sector Participation (PSP) Hydro Rwanda"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m (Wiki Gardener moved page Turbines in PSP Hydro Rwanda to Turbines in Private Sector Participation (PSP) Hydro Rwanda without leaving a redirect)
 
(No difference)

Latest revision as of 16:09, 7 August 2014

Overview

Private Sector Participation (PSP) in Micro-Hydro Power Supply for Rural Development, Rwanda (PSP Hydro)

Concretely, PSP Hydro envisages supporting five private Rwandan Project Developers financially and with ongoing training. The intervention is realized under the umbrella of the Dutch-German Energy Partnership Energising Development (EnDev).



Hydro Sites in Rwanda

Three hydro sites are currently under development in the EnDev project PSP Hydro in Rwanda.

Here is some date about the turbines and generators that will be installed in the projects:

Project site
project developer
capazity Turbine Manufacturer
[kW]
Murunda REPRO 96 generator: Ossberger (new)

turbine: Ossberger (old)

Masimeru and Maruruma ENNy 250

generator + turbine Kochendörfer (new)

Musarara SOGEMR 438

generator + turbine Ossberger (new)


Further Information


References