Description
English: This is a simulated operation plan of the power system in Germany by March 2025. All types of renewable energy power plants were allowed in the control reserve market, thus 100% renewable energy operation was possible at certain period of time.
Source

Own Work

Date

2019-10-29

Author

*****

Permission

See license tag below.


Licensing

I, the copyright holder of this work, hereby publish it under the following license:
⧼wm-license-cc-wiki-link⧽
attribution share alike
This file is licensed under the Creative CommonsAttribution-Share Alike 3.0 Unported license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work


Under the following conditions:
  • attribution – You must attribute the work in the manner specified by the author or licensor (but not in any way that suggests that they endorse you or your use of the work).
  • share alike – If you alter, transform, or build upon this work, you may distribute the resulting work only under the same or similar license to this one.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current18:44, 1 November 2019Thumbnail for version as of 18:44, 1 November 20191,875 × 468 (0 bytes)***** (***** | *****)User created page with UploadWizard

The following page uses this file: