Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

File:Simulated Operation Plan in Germany by March 2025, without flexible VRE.png

From energypedia

Original file(1,875 × 468 pixels, file size: 0 bytes, MIME type: image/png)

Summary

Description
English: This is a simulated operation plan of the power system in Germany by March 2025. Renewable energy power plants were not allowed in the control reserve market, so there existed a level of "system must run" that conventional power plants had to provide constantly.
Source

Own Work

Date

2019-10-29

Author

*****

Permission

See license tag below.


Licensing

I, the copyright holder of this work, hereby publish it under the following license:
⧼wm-license-cc-wiki-link⧽
attribution share alike
This file is licensed under the Creative CommonsAttribution-Share Alike 3.0 Unported license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work


Under the following conditions:
  • attribution – You must attribute the work in the manner specified by the author or licensor (but not in any way that suggests that they endorse you or your use of the work).
  • share alike – If you alter, transform, or build upon this work, you may distribute the resulting work only under the same or similar license to this one.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current18:44, 1 November 2019Thumbnail for version as of 18:44, 1 November 20191,875 × 468 (0 bytes)***** (***** | *****)User created page with UploadWizard

The following page uses this file: