Difference between revisions of "Hydro - FAQ"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 1: Line 1:
<span style="color: rgb(255, 0, 0);">goto third tab &lt;Edit&gt;   and </span><span style="color: rgb(255, 0, 0);">ask your question question here </span><span style="color: rgb(255, 0, 0);">!</span>
+
==== go to third tab &lt;Edit&gt; and ask your question question here ====
  
Answer the questions here ...  
+
<br> Answer the questions here ...  
  
 
<br>  
 
<br>  
  
  <span style="color: rgb(255, 0, 0);">Question?</span>
+
==== What use can a hydropower installation satisfy? ====
  
Answer...
+
*Direct drive of machinery
 +
*Electricity production for local use
 +
*Electricity feed into grid for revenue<br>
  
<br>  
+
<br>
 +
 
 +
==== How many people can be supplied? ====
 +
 
 +
*Available <u>share per household (hh) depends on local hydro potential and type of use</u> (lighting, TV, machinery, ...)
 +
*Required power for <u>lighting</u> depends on no. and type of lamps used (3 - 5 Watt energy saving lamps are existing)<br>
 +
*Machinery needs usually several kW (often machinery's power is given in HP (metrical Horsepower) 10 HP = 7.36 kW)<br>A motors starting power can be 50% higher than its regularly stated power.&nbsp;There are technical possibilities to address these (soft start).
 +
*Electrical heating requires very high power. E.g. has a typical water heater ~ 3 kW. Within an isolated grid, electrical heating / cooking / oven&nbsp; is usually not practicable. Hot water can be produced centrally from the ballast load.<br>
 +
*Electrical cooling is possible.&nbsp;
 +
*Electrical fan ~ 200 Watt.
 +
*Radio / DVD ~ 10 W / 2 W
 +
*Water pump&nbsp; ~ 1 kW
 +
*TV 50 -150 W (depending on type and size)
 +
 
 +
<br>
 +
 
 +
'''What are typical difficulties'''<br>
 +
 
 +
*financial coverage<br>
 +
*remote location<br>
 +
*specific conditions<br>
 +
*uncertain outcome<br>
 +
 
 +
<br>
 +
 
 +
*'''Price range: '''depends on size of potential site, ranges from 2000 - 5000 USD/kW
 +
*'''Material needed: '''Turbine, generator, controller come from a specialist &nbsp;
 +
*'''Suitable geographic area: '''usual hilly and all year round water flow, also irrigation canals can have good hydropower potential
 +
*'''Required competencies: '''Experience in mhp feasibility for pre-study and planning, patience in cooperation with the local entities'''<br>'''
 +
*'''How Long does it take: '''Ideally flow measurements should be taken over several years to ensure safe data. A must is the measurement of the minimal flow during dry season. From there on a mhp plant can be installed within one year. Accessibility of remote location, delivery times for turbine and generator and social setup usually take longer than estimated.&nbsp;
  
 
<br>  
 
<br>  
Line 16: Line 47:
  
 
[[Category:Hydro]]
 
[[Category:Hydro]]
 +
 +
<br>

Revision as of 10:30, 18 June 2010

go to third tab <Edit> and ask your question question here


Answer the questions here ...


What use can a hydropower installation satisfy?

  • Direct drive of machinery
  • Electricity production for local use
  • Electricity feed into grid for revenue


How many people can be supplied?

  • Available share per household (hh) depends on local hydro potential and type of use (lighting, TV, machinery, ...)
  • Required power for lighting depends on no. and type of lamps used (3 - 5 Watt energy saving lamps are existing)
  • Machinery needs usually several kW (often machinery's power is given in HP (metrical Horsepower) 10 HP = 7.36 kW)
    A motors starting power can be 50% higher than its regularly stated power. There are technical possibilities to address these (soft start).
  • Electrical heating requires very high power. E.g. has a typical water heater ~ 3 kW. Within an isolated grid, electrical heating / cooking / oven  is usually not practicable. Hot water can be produced centrally from the ballast load.
  • Electrical cooling is possible. 
  • Electrical fan ~ 200 Watt.
  • Radio / DVD ~ 10 W / 2 W
  • Water pump  ~ 1 kW
  • TV 50 -150 W (depending on type and size)


What are typical difficulties

  • financial coverage
  • remote location
  • specific conditions
  • uncertain outcome


  • Price range: depends on size of potential site, ranges from 2000 - 5000 USD/kW
  • Material needed: Turbine, generator, controller come from a specialist  
  • Suitable geographic area: usual hilly and all year round water flow, also irrigation canals can have good hydropower potential
  • Required competencies: Experience in mhp feasibility for pre-study and planning, patience in cooperation with the local entities
  • How Long does it take: Ideally flow measurements should be taken over several years to ensure safe data. A must is the measurement of the minimal flow during dry season. From there on a mhp plant can be installed within one year. Accessibility of remote location, delivery times for turbine and generator and social setup usually take longer than estimated. 


back to hydro section