Difference between revisions of "SPIS Toolbox - Set Up - Further Readings"

From energypedia
***** (***** | *****)
(Created page with " ")
 
***** (***** | *****)
m
Line 1: Line 1:
  
 +
= Further Reading, Links and Tools =
 +
 +
 +
 +
'''Links'''
 +
 +
“IRRIG8QUICK Irrigation Calibration Quick Test - Guidelines for Drip Micro Irrigation” by Page Blomer Associates (2009) at:
 +
 +
 +
 +
“Solar-Powered Irrigation Systems – Stocktaking and Analysis Report” by German Technical Cooperation Agency (GIZ) (2015)
 +
 +
Schultz and Suryani, 2015. EnDev2 Indonesia: Inspection Guide for Photovoltaic Village Power (PVVP) Systems. GIZ
 +
 +
 
 +
 +
'''SPIS tools'''
 +
 +
'''SET UP 01''' – PV Acceptance Test: Guideline to compare the installed with the actual capacity of the pump
 +
 +
'''SET UP 02''' – Workmanship Quality Checklist: Checklist for inspecting and verifying the workmanship quality
 +
 +
 
 +
 +
The following tools that are assigned to other Modules are also relevant:
 +
 +
'''PROMOTE 01'''- SPIS Rapid Assessment: on the analysis of the market for service provision
 +
 +
'''DESIGN 03'''- Pump Sizing Tool: to verify SPIS acceptance testing
 +
 +
'''MAINTAIN 03-''' Water application uniformity test: that should be implemented directly after setting up the system 
 +
 +
[[Category:SPIS_Manual]]
 +
[[Category:Powering_Agriculture]]
 +
[[Category:Tools]]

Revision as of 12:00, 8 May 2017

Further Reading, Links and Tools

Links

“IRRIG8QUICK Irrigation Calibration Quick Test - Guidelines for Drip Micro Irrigation” by Page Blomer Associates (2009) at:


“Solar-Powered Irrigation Systems – Stocktaking and Analysis Report” by German Technical Cooperation Agency (GIZ) (2015)

Schultz and Suryani, 2015. EnDev2 Indonesia: Inspection Guide for Photovoltaic Village Power (PVVP) Systems. GIZ

 

SPIS tools

SET UP 01 – PV Acceptance Test: Guideline to compare the installed with the actual capacity of the pump

SET UP 02 – Workmanship Quality Checklist: Checklist for inspecting and verifying the workmanship quality

 

The following tools that are assigned to other Modules are also relevant:

PROMOTE 01- SPIS Rapid Assessment: on the analysis of the market for service provision

DESIGN 03- Pump Sizing Tool: to verify SPIS acceptance testing

MAINTAIN 03- Water application uniformity test: that should be implemented directly after setting up the system