Difference between revisions of "SPIS Toolbox - Set Up - Further Readings"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 1: Line 1:
 
 
= Further Reading, Links and Tools =
 
= Further Reading, Links and Tools =
  
Line 6: Line 5:
 
“IRRIG8QUICK Irrigation Calibration Quick Test - Guidelines for Drip Micro Irrigation” by Page Blomer Associates (2009) at:
 
“IRRIG8QUICK Irrigation Calibration Quick Test - Guidelines for Drip Micro Irrigation” by Page Blomer Associates (2009) at:
  
[http://www.claw.net.nz/resources/irrigation/ [1]] (08/13/2015)
+
[http://www.claw.net.nz/resources/irrigation/ ''www.claw.net.nz/resources/irrigation''] (08/13/2015)
  
 
“Solar-Powered Irrigation Systems – Stocktaking and Analysis Report” by German Technical Cooperation Agency (GIZ) (2015)
 
“Solar-Powered Irrigation Systems – Stocktaking and Analysis Report” by German Technical Cooperation Agency (GIZ) (2015)
Line 30: Line 29:
 
'''MAINTAIN 03-''' Water application uniformity test: that should be implemented directly after setting up the system 
 
'''MAINTAIN 03-''' Water application uniformity test: that should be implemented directly after setting up the system 
  
 +
[[Category:SPIS_Manual]]
 +
[[Category:Powering_Agriculture]]
 
[[Category:Tools]]
 
[[Category:Tools]]
[[Category:Powering_Agriculture]]
 
[[Category:SPIS_Manual]]
 

Revision as of 12:04, 8 May 2017

Further Reading, Links and Tools

Links

“IRRIG8QUICK Irrigation Calibration Quick Test - Guidelines for Drip Micro Irrigation” by Page Blomer Associates (2009) at:

www.claw.net.nz/resources/irrigation (08/13/2015)

“Solar-Powered Irrigation Systems – Stocktaking and Analysis Report” by German Technical Cooperation Agency (GIZ) (2015)

Schultz and Suryani, 2015. EnDev2 Indonesia: Inspection Guide for Photovoltaic Village Power (PVVP) Systems. GIZ

 

SPIS tools

SET UP 01 – PV Acceptance Test: Guideline to compare the installed with the actual capacity of the pump

SET UP 02 – Workmanship Quality Checklist: Checklist for inspecting and verifying the workmanship quality

 

The following tools that are assigned to other Modules are also relevant:

PROMOTE 01- SPIS Rapid Assessment: on the analysis of the market for service provision

DESIGN 03- Pump Sizing Tool: to verify SPIS acceptance testing

MAINTAIN 03- Water application uniformity test: that should be implemented directly after setting up the system