Difference between revisions of "SPIS Toolbox - Set Up - Further Readings"
***** (***** | *****) m |
***** (***** | *****) m |
||
Line 1: | Line 1: | ||
− | |||
= Further Reading, Links and Tools = | = Further Reading, Links and Tools = | ||
Line 6: | Line 5: | ||
“IRRIG8QUICK Irrigation Calibration Quick Test - Guidelines for Drip Micro Irrigation” by Page Blomer Associates (2009) at: | “IRRIG8QUICK Irrigation Calibration Quick Test - Guidelines for Drip Micro Irrigation” by Page Blomer Associates (2009) at: | ||
− | [http://www.claw.net.nz/resources/irrigation/ | + | [http://www.claw.net.nz/resources/irrigation/ ''www.claw.net.nz/resources/irrigation''] (08/13/2015) |
“Solar-Powered Irrigation Systems – Stocktaking and Analysis Report” by German Technical Cooperation Agency (GIZ) (2015) | “Solar-Powered Irrigation Systems – Stocktaking and Analysis Report” by German Technical Cooperation Agency (GIZ) (2015) | ||
Line 30: | Line 29: | ||
'''MAINTAIN 03-''' Water application uniformity test: that should be implemented directly after setting up the system | '''MAINTAIN 03-''' Water application uniformity test: that should be implemented directly after setting up the system | ||
+ | [[Category:SPIS_Manual]] | ||
+ | [[Category:Powering_Agriculture]] | ||
[[Category:Tools]] | [[Category:Tools]] | ||
− | |||
− |
Revision as of 12:04, 8 May 2017
Further Reading, Links and Tools
Links
“IRRIG8QUICK Irrigation Calibration Quick Test - Guidelines for Drip Micro Irrigation” by Page Blomer Associates (2009) at:
www.claw.net.nz/resources/irrigation (08/13/2015)
“Solar-Powered Irrigation Systems – Stocktaking and Analysis Report” by German Technical Cooperation Agency (GIZ) (2015)
Schultz and Suryani, 2015. EnDev2 Indonesia: Inspection Guide for Photovoltaic Village Power (PVVP) Systems. GIZ
SPIS tools
SET UP 01 – PV Acceptance Test: Guideline to compare the installed with the actual capacity of the pump
SET UP 02 – Workmanship Quality Checklist: Checklist for inspecting and verifying the workmanship quality
The following tools that are assigned to other Modules are also relevant:
PROMOTE 01- SPIS Rapid Assessment: on the analysis of the market for service provision
DESIGN 03- Pump Sizing Tool: to verify SPIS acceptance testing
MAINTAIN 03- Water application uniformity test: that should be implemented directly after setting up the system