Difference between revisions of "Quality of PicoPV Systems"

From energypedia
***** (***** | *****)
(Created page with "Experience in development cooperation shows that one thing must be avoided at the outset: that users of cheap and inadequate devices should become so disillusioned that the entir...")
 
***** (***** | *****)
Line 1: Line 1:
Experience in development cooperation shows that one thing must be avoided at the outset: that users of cheap and inadequate devices should become so disillusioned that the entire technology is discredited.  
+
Experience in development cooperation shows that one thing must be avoided at the outset: that users of cheap and inadequate devices should become so disillusioned that the entire technology is discredited.<br>
  
Therefore different Lab-Tests were accomplished in order to evaluate the PicoPV systems:
+
Therefore, quality control is one of the most urgent tasks. This could be achieved via a simple, two- pronged approach:  
 
 
&nbsp;
 
 
 
*[[Solar Laterns Test|Solar Laterns Test: Shades of Light (GTZ, 2009)]]
 
*[[Lighting Africa Outstanding Products|Lighting Africa 2010 Outstanding Product Awards]]
 
  
 +
*cooperation between test labs, institutes and universities to apply the simple testing procedures developed by Fraunhofer institute with funding from GTZ and WBG,and
 +
*national awareness campaigns for PicoPV among private and public sector, as well as future users.
  
  
  
 +
Already accomplished Laboratory Tests in order to evaluate the PicoPV systems are as follows:
  
 +
*[[Solar Laterns Test|Solar Laterns Test: Shades of Light (GTZ, 2009)]]
 +
*[[Lighting Africa Outstanding Products|Lighting Africa 2010 Outstanding Product Awards]]<br>
  
 +
<br>
  
[[Category:Solar]][[Category:PicoPV]]
+
[[Category:Solar]] [[Category:PicoPV]]

Revision as of 14:46, 9 December 2010

Experience in development cooperation shows that one thing must be avoided at the outset: that users of cheap and inadequate devices should become so disillusioned that the entire technology is discredited.

Therefore, quality control is one of the most urgent tasks. This could be achieved via a simple, two- pronged approach:

  • cooperation between test labs, institutes and universities to apply the simple testing procedures developed by Fraunhofer institute with funding from GTZ and WBG,and
  • national awareness campaigns for PicoPV among private and public sector, as well as future users.


Already accomplished Laboratory Tests in order to evaluate the PicoPV systems are as follows: