|BSP Project Name=Kindergarten No. 5 Uliastai soum - Thermo-technical retrofitting of public buildings  
+
|BSP Project Name=Kindergarten No. 5 Uliastai soum - Thermo-technical retrofitting of public buildings
 
|BSP Project Desc=Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
 
|BSP Project Desc=Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
 +
|BSP Project Budget=247.900.000,00 MNT
 
|BSP Project Status=Completed
 
|BSP Project Status=Completed
 +
|BSP Project Start=22.07.2014
 
|BSP Project Type=other
 
|BSP Project Type=other
 +
|BSP Project End=06.10.2014
 +
|BSP Project Picture=Za Kg 5.png
 
|BSP Province Name=Zavkhan
 
|BSP Province Name=Zavkhan
|BSP Province=46.862496, 103.846656
+
|BSP Province=47.736236, 96.854103
 
|BSP Organization=GIZ
 
|BSP Organization=GIZ
 
|BSP Tag Building=Building improvement
 
|BSP Tag Building=Building improvement
 
|BSP Tag Efficient=Efficient use of resources
 
|BSP Tag Efficient=Efficient use of resources
 
}}
 
}}
Building data and geometry
 
  
    Construction year: 1975
+
==== Building data and geometry<br/> ====
    Cross volume: 3,276.8 m³
 
    Thermal envelope: 1,730.3 m²
 
    Net volume: 2,835 m³
 
    Net floor area: 799.3 m²
 
  
Implemented measures:
+
*Construction year: 1975<br/>
 +
*Cross volume: 3,276.8 m³<br/>
 +
*Thermal envelope: 1,730.3 m²<br/>
 +
*Net volume: 2,835 m³<br/>
 +
*Net floor area: 799.3 m²<br/>
  
    Roof insulation with 20cm EPS- hard foam and waterproofing
+
==== Implemented measures:<br/> ====
    Wall insulation with 15cm EPS- hard foam
 
    New windows with 5-chamber plastic frame and double glazing
 
    New exterior doors
 
    Rehabilitation of the heating system
 
    Contracting company: Tulgat bagana LLC
 
  
Energy consumption
+
*Roof insulation with 20cm EPS- hard foam and waterproofing<br/>
 +
*Wall insulation with 15cm EPS- hard foam<br/>
 +
*Floorinsulation mit 10 cm EPS- hard foam and new flooring
 +
*New windows with 5-chamber plastic frame and double glazing<br/>
 +
*New exterior doors<br/>
 +
*Rehabilitation of the heating system<br/>
 +
*Contracting company: Tsagaanseer LLC<br/>
  
    Before: 522 kWh/(m2 a) {calculated}
+
==== Energy consumption<br/> ====
    After: 140 kWh /(m2 a) {metred}
+
 
    Energy saving per year: 305,332 kWh
+
*Before: 551 kWh/(m2 a) {calculated}<br/>
    Coal equivalent saving: 75,020 kg / 75 t
+
*After: 170 kWh /(m2 a) {metred}<br/>
    CO2 emission savings per year: 206 t CO2 {Estimated}
+
*Energy saving per year: 304,533 kWh<br/>
 +
*Coal equivalent saving: 77,823 kg / 75 t<br/>
 +
*CO<sub>2</sub> emission savings per year: 206 t CO<sub>2 </sub>{Estimated}

Latest revision as of 06:23, 23 November 2017

► Back to the Main Page

Key Project Data

Name
Kindergarten No. 5 Uliastai soum - Thermo-technical retrofitting of public buildings
Description
Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
Project No.
Total Budget
247.900.000,00 MNT
Status
Icon Completed.png Completed
Timeframe
22.07.2014 - 06.10.2014
Type
other
Project Picture
Click to download picture

Location in Mongolia

Province
Zavkhan
Loading map...

Further Information

Website
Factsheet
Organization
GIZ

Tagging

Publications

Currently, there are no publications related to this project.

Events

Currently, there are no events organized by this project.

Additional Comments



Building data and geometry

  • Construction year: 1975
  • Cross volume: 3,276.8 m³
  • Thermal envelope: 1,730.3 m²
  • Net volume: 2,835 m³
  • Net floor area: 799.3 m²

Implemented measures:

  • Roof insulation with 20cm EPS- hard foam and waterproofing
  • Wall insulation with 15cm EPS- hard foam
  • Floorinsulation mit 10 cm EPS- hard foam and new flooring
  • New windows with 5-chamber plastic frame and double glazing
  • New exterior doors
  • Rehabilitation of the heating system
  • Contracting company: Tsagaanseer LLC

Energy consumption

  • Before: 551 kWh/(m2 a) {calculated}
  • After: 170 kWh /(m2 a) {metred}
  • Energy saving per year: 304,533 kWh
  • Coal equivalent saving: 77,823 kg / 75 t
  • CO2 emission savings per year: 206 t CO2 {Estimated}