Difference between revisions of "Kindergarten No. 5 Uliastai soum - Thermo-technical retrofitting of public buildings"

From energypedia
***** (***** | *****)
***** (***** | *****)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
|BSP Project Name=Kindergarten No. 5 Uliastai soum - Thermo-technical retrofitting of public buildings
 
|BSP Project Name=Kindergarten No. 5 Uliastai soum - Thermo-technical retrofitting of public buildings
 
|BSP Project Desc=Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
 
|BSP Project Desc=Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
 +
|BSP Project Budget=247.900.000,00 MNT
 
|BSP Project Status=Completed
 
|BSP Project Status=Completed
 +
|BSP Project Start=22.07.2014
 
|BSP Project Type=other
 
|BSP Project Type=other
 +
|BSP Project End=06.10.2014
 +
|BSP Project Picture=Za Kg 5.png
 
|BSP Province Name=Zavkhan
 
|BSP Province Name=Zavkhan
|BSP Province=46.862496, 103.846656
+
|BSP Province=47.736236, 96.854103
 
|BSP Organization=GIZ
 
|BSP Organization=GIZ
 
|BSP Tag Building=Building improvement
 
|BSP Tag Building=Building improvement
Line 23: Line 27:
 
*Roof insulation with 20cm EPS- hard foam and waterproofing<br/>
 
*Roof insulation with 20cm EPS- hard foam and waterproofing<br/>
 
*Wall insulation with 15cm EPS- hard foam<br/>
 
*Wall insulation with 15cm EPS- hard foam<br/>
 +
*Floorinsulation mit 10 cm EPS- hard foam and new flooring
 
*New windows with 5-chamber plastic frame and double glazing<br/>
 
*New windows with 5-chamber plastic frame and double glazing<br/>
 
*New exterior doors<br/>
 
*New exterior doors<br/>
 
*Rehabilitation of the heating system<br/>
 
*Rehabilitation of the heating system<br/>
*Contracting company: Tulgat bagana LLC<br/>
+
*Contracting company: Tsagaanseer LLC<br/>
  
 
==== Energy consumption<br/> ====
 
==== Energy consumption<br/> ====
  
*Before: 522 kWh/(m2 a) {calculated}<br/>
+
*Before: 551 kWh/(m2 a) {calculated}<br/>
*After: 140 kWh /(m2 a) {metred}<br/>
+
*After: 170 kWh /(m2 a) {metred}<br/>
*Energy saving per year: 305,332 kWh<br/>
+
*Energy saving per year: 304,533 kWh<br/>
*Coal equivalent saving: 75,020 kg / 75 t<br/>
+
*Coal equivalent saving: 77,823 kg / 75 t<br/>
 
*CO<sub>2</sub> emission savings per year: 206 t CO<sub>2 </sub>{Estimated}
 
*CO<sub>2</sub> emission savings per year: 206 t CO<sub>2 </sub>{Estimated}

Latest revision as of 06:23, 23 November 2017

► Back to the Main Page

Key Project Data

Name
Kindergarten No. 5 Uliastai soum - Thermo-technical retrofitting of public buildings
Description
Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
Project No.
Total Budget
247.900.000,00 MNT
Status
Icon Completed.png Completed
Timeframe
22.07.2014 - 06.10.2014
Type
other
Project Picture
Click to download picture

Location in Mongolia

Province
Zavkhan
Loading map...

Further Information

Website
Factsheet
Organization
GIZ

Tagging

Publications

Currently, there are no publications related to this project.

Events

Currently, there are no events organized by this project.

Additional Comments



Building data and geometry

  • Construction year: 1975
  • Cross volume: 3,276.8 m³
  • Thermal envelope: 1,730.3 m²
  • Net volume: 2,835 m³
  • Net floor area: 799.3 m²

Implemented measures:

  • Roof insulation with 20cm EPS- hard foam and waterproofing
  • Wall insulation with 15cm EPS- hard foam
  • Floorinsulation mit 10 cm EPS- hard foam and new flooring
  • New windows with 5-chamber plastic frame and double glazing
  • New exterior doors
  • Rehabilitation of the heating system
  • Contracting company: Tsagaanseer LLC

Energy consumption

  • Before: 551 kWh/(m2 a) {calculated}
  • After: 170 kWh /(m2 a) {metred}
  • Energy saving per year: 304,533 kWh
  • Coal equivalent saving: 77,823 kg / 75 t
  • CO2 emission savings per year: 206 t CO2 {Estimated}