Difference between revisions of "Thermo-technical retrofitting of public buildings 2"

From energypedia
***** (***** | *****)
***** (***** | *****)
 
Line 1: Line 1:
 
{{Biogas Project Database
 
{{Biogas Project Database
|BSP Project Name=Thermo-technical retrofitting of a health center  
+
|BSP Project Name=Thermo-technical retrofitting of a health center
 
|BSP Project Desc=Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
 
|BSP Project Desc=Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
 
|BSP Project Budget=174,100,000.00 MNT
 
|BSP Project Budget=174,100,000.00 MNT
Line 8: Line 8:
 
|BSP Project End=07.09.2015
 
|BSP Project End=07.09.2015
 
|BSP Project Picture=Khovd Duut.png
 
|BSP Project Picture=Khovd Duut.png
|BSP Province=46.862496, 103.846656
+
|BSP Province Name=Khovd
 +
|BSP Province=47.520961, 91.630275
 +
|BSP Organization=GIZ
 
|BSP Tag Building=Building improvement
 
|BSP Tag Building=Building improvement
 
|BSP Tag Efficient=Efficient use of resources
 
|BSP Tag Efficient=Efficient use of resources
Line 16: Line 18:
  
 
*Construction year: 1975<br/>
 
*Construction year: 1975<br/>
*Cross volume: 3,276.8 m³<br/>
+
*Cross volume: 1,909.1 m³<br/>
*Thermal envelope: 1,730.3 m²<br/>
+
*Thermal envelope: 1,489.9 m²<br/>
*Net volume: 2,835 m³<br/>
+
*Net volume: 1,261.2 m³<br/>
*Net floor area: 799.3 m²<br/>
+
*Net floor area: 441.3 m²<br/>
  
 
==== Implemented measures:<br/> ====
 
==== Implemented measures:<br/> ====
Line 26: Line 28:
 
*Wall insulation with 15cm EPS- hard foam<br/>
 
*Wall insulation with 15cm EPS- hard foam<br/>
 
*New windows with 5-chamber plastic frame and double glazing<br/>
 
*New windows with 5-chamber plastic frame and double glazing<br/>
*New exterior doors<br/>
+
*New exterior doors
*Rehabilitation of the heating system<br/>
+
 
*Contracting company: Tulgat bagana LLC<br/>
+
Contracting company: '''Buyantiin Borgio LLC'''
  
 
==== Energy consumption<br/> ====
 
==== Energy consumption<br/> ====
  
*Before: 522 kWh/(m2 a) {calculated}<br/>
+
*Before: 473 kWh/(m2 a) {calculated}<br/>
*After: 140 kWh /(m2 a) {metred}<br/>
+
*After: 242 kWh /(m2 a) {metred}<br/>
*Energy saving per year: 305,332 kWh<br/>
+
*Energy saving per year: 101,871 kWh<br/>
*Coal equivalent saving: 75,020 kg / 75 t<br/>
+
*Coal equivalent saving: 25,029 kg / 25 t<br/>
*CO<sub>2</sub> emission savings per year: 206 t CO<sub>2 </sub>{Estimated}
+
*CO<sub>2</sub> emission savings per year: 68.8 t CO<sub>2 </sub>{Estimated}

Latest revision as of 06:43, 23 November 2017

► Back to the Main Page

Key Project Data

Name
Thermo-technical retrofitting of a health center
Description
Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
Project No.
Total Budget
174,100,000.00 MNT
Status
Icon Completed.png Completed
Timeframe
01.07.2015 - 07.09.2015
Type
other
Project Picture
Click to download picture

Location in Mongolia

Province
Khovd {{#display_point: coordinates=47.520961, 91.630275|zoom=4|height=150|width=250|service=openlayers}}

Further Information

Website
Factsheet
Organization
GIZ

Tagging

Publications

Currently, there are no publications related to this project.

Events

Currently, there are no events organized by this project.

Additional Comments



Building data and geometry

  • Construction year: 1975
  • Cross volume: 1,909.1 m³
  • Thermal envelope: 1,489.9 m²
  • Net volume: 1,261.2 m³
  • Net floor area: 441.3 m²

Implemented measures:

  • Roof insulation with 20cm EPS- hard foam and waterproofing
  • Wall insulation with 15cm EPS- hard foam
  • New windows with 5-chamber plastic frame and double glazing
  • New exterior doors

Contracting company: Buyantiin Borgio LLC

Energy consumption

  • Before: 473 kWh/(m2 a) {calculated}
  • After: 242 kWh /(m2 a) {metred}
  • Energy saving per year: 101,871 kWh
  • Coal equivalent saving: 25,029 kg / 25 t
  • CO2 emission savings per year: 68.8 t CO2 {Estimated}