Difference between revisions of "National Approaches to Electrification – Non-Financial Interventions"
***** (***** | *****) m |
***** (***** | *****) m |
||
Line 361: | Line 361: | ||
| style="width: 10px; background-color: rgb(49, 49, 152);" | <br/> | | style="width: 10px; background-color: rgb(49, 49, 152);" | <br/> | ||
| | | | ||
− | * | + | *<span style="font-size: 16pt; font-family: "Calibri Light";">AFREPREN (</span><span style="font-size: 16pt; font-family: "Calibri Light";">Karekezi</span><span style="font-size: 16pt; font-family: "Calibri Light";">, </span><span style="font-size: 16pt; font-family: "Calibri Light";">Kimani</span><span style="font-size: 16pt; font-family: "Calibri Light";">) Status of Power Sector Reform in Africa: Impact on the Poor </span><span style="font-size: 16pt; font-family: "Calibri Light";">[http://www.sciencedirect.com/science/article/pii/S0301421502000484 www.sciencedirect.com/science/article/pii/S0301421502000484]</span><span style="font-size: 16pt; font-family: "Calibri Light";"><br/></span> |
− | * | + | *<span style="font-size: 16pt; font-family: "Calibri Light";">AIMS Energy (2015</span><span style="font-size: 16pt; font-family: "Calibri Light";">), Reforms </span><span style="font-size: 16pt; font-family: "Calibri Light";">for the expansion of electricity access and rural electrification in small island developing </span><span style="font-size: 16pt; font-family: "Calibri Light";">states </span><span style="font-size: 16pt; font-family: "Calibri Light";">[http://www.aimspress.com/fileOther/PDF/energy/201503463.pdf http://]</span><span style="font-size: 16pt; font-family: "Calibri Light";">[http://www.aimspress.com/fileOther/PDF/energy/201503463.pdf www.aimspress.com/fileOther/PDF/energy/201503463.pdf]</span><u><span style="font-size: 16pt; font-family: "Calibri Light";"></span></u> |
+ | *<span style="font-size: 16pt; font-family: "Calibri Light";">EUEI PDF (2014), Mini-grid Policy Toolkit: Policy and Business Frameworks for Successful Mini-grid Roll-outs </span><span style="font-size: 16pt; font-family: "Calibri Light";">[http://www.euei-pdf.org/sites/default/files/field_publication_file/RECP_MiniGrid_Policy_Toolkit_1pageview_(pdf,_17.6MB,_EN_0.pdf http://www.euei-pdf.org/sites/default/files/field_publication_file/RECP_mini-grid_Policy_Toolkit_1pageview_(pdf,_17.6MB,_EN_0.pdf]</span> | ||
|} | |} |
Revision as of 10:35, 26 June 2018
Non-Financial Interventions: Actions taken to support or facilitate electricity access
Interventions should be regarded as part of a National Electrification Approache only if they are integral to governement electrification policy/strategy
Direct Energy Access Provision
Definition: |
Direct action by an implementing authority (such as a Rural Energy Agency or national utility) to provide or take part in the provision of electricity directly, rather than by funding, incentivizing or facilitating provision by others. This may include providing:
|
Internactions wiht other NAE Categories:
Technology |
Grid extension is often directly provided, but direct provision may also be used for mini-grids and standalone systems. | |
Delivery Models
|
Direct provision sits naturally with a public delivery model where all the elements along the supply chain are undertaken by public entities. Where the public sector wishes to take on only some roles along the chain, a public-private partnership may be more appropriate. Direct provision through a purely private model is difficult to envisage. | |
Legual Basis |
Direct provision may be on a national concession monopoly basis, with oversight and control being through the organisational hierarchy (though a transparent regulatory system would still be best practice). Where direct provision is applied to only one part of electricity access and or to only some elements of the supply chain, it is important that the regulatory basis is clear so that other market participants can understand it and so that any potential threat to them is reduced. | |
Price/Tariff Regulation | ||
Finance
|
Private finance is unlikely to be used to fund direct provision, though it will probably be used in the private elements of a public-private partnership arrangement including direct provision (and could be leveraged by the direct provision elements). Some form of public funding is very likely to be involved in direct provision, though since this may be within the public sector it may be implicit rather than through explicit grants or subsidies. Direct provision may also draw on cross-subsidies and hence on charges on existing users to subsidise provision to new users. | |
Other Forms of Non-Financial Interventions
|
National energy planning will establish the optimum mix of technologies to meet electrification needs across the country, but not how they are best provided. Direct provision will often take place within existing structures, however Institutional restructuring may be needed to provide a focus for provision – eg by a Rural Energy Agency – and capacity building or technical assistance for this new organisation may be merited. Direct provision may also be accompanied by measures such as demand promotion and technology adoption. |
Advantages and Disadvantages
Direct provision will generally use existing institutions, capabilities and systems and where these are strong may bring advantages. By drawing on these strengths it can bring economies of scale (eg through bulk purchasing). However, this will often be accompanied by entrenched ways of working and be inflexible and slow moving. Direct provision also has the potential to bring in other participants (for instance by offering standalone system providers a simple way to distribute their products), but carries the risk of distorting and crowding others out of the energy access provision. |
Further Information and Guidance
|
Relevante Case Studies:
Institutional Restructuring
Definition: |
Reorganising and reassigning responsibilities between government departments, agencies, utilities and other organisations charged with managing the sector and delivering electricity access. In many countries, the national electricity utility has historically been the sole provider of electricity and responsible for all electrification efforts. The motivation for institutional reform is generally some combination of poor performance or inefficiency of existing institutions (often the national utility) and a wish to accelerate extension of electricity access, to introduce new forms of electricity provision, to bring in new (often private) funding and investment or to create greater transparency and accountability. |
Internactions wiht other NAE Categories:
Technology
|
Institutional reform will have an impact on all approaches to electrification and the associated technology categories. For grid extension, existing institutions have extensive experience of practices that may no longer be most appropriate for electrification in more areas. New practices may be required to increase levels of efficiency in order to make further grid extension a viable option, new expertise and knowledge may be needed to support adoption of new forms of electricity provision, and cultural change may be needed to achieve increased focus on supplying new users alongside serving existing customers. mini-grids, whether isolated or integrated with the grid, require different support structures to be effective, reliable and commercially viable. Stand-alone systems again offer a different approach to the aims of electrification, with the satisfaction of basic needs being the principle driver, rather than a full power service. This too requires a different institutional perspective, skills and understanding that can only be delivered through the reform of existing support structures. | |
Delivery Models
|
The institutions originally established to deal with power generation and supply were almost exclusively public sector, centred upon the national electricity utility. With the increasing cost of reaching more remote areas, the need for upfront investment has become a serious constraint to network expansion. Rural electrification also raises new challenges regarding the need for more intensive community interaction and closer management of the local operations. Consequently, the resources that can more readily be offered by the private sector – including the scale of investment and commercial management in order to make sufficient returns – are increasingly required. There is a growing need for private models and public-private-partnerships, which face the barrier of public institutions that have experience of a single method of providing access to electricity. The reform of these institutions, taking account of private sector interests, can thereby create opportunities for partnerships that will bring mutual benefits to all involved. | |
Legual Basis
|
Establishment of either or concessions or licenses for electricity provider implies a wish to bring in private or public-private electricity provision. Setting up these arrangements will require competent institutions with responsibility for managing them, and institutional restructuring is a likely response to this need and a first step in establishing new legal arrangements for electricity provision. | |
Price/Tariff Regulation
|
Similarly any form of price/tariff regulation requires a regulator. A regulator independent from | |
Finance
|
An institutional structure convincing to private sector businesses and investors is key to attracting private finance. It is also through this institutional structure that the interests of users are protected and the portion of funding provided by users set. The institutional structure also governs how any grant/subsidy, cross-subsidy, tax exemptions and guarantee arrangements are set up and implemented. | |
Other Forms of Non-Financial Interventions
|
The institutions charged with managing the sector and delivering electricity access will also be responsible for designing and managing non-financial interventions. One key element of institutional change will be to match the capabilities of staff to new requirements. Training to familiarise staff with new approaches, and to transfer the new skills required to provide the associated support will be an important requirement for any lasting reform process (and, if fulfilled adequately, will also incur a significant cost due to the large size of the institutions involved and the broad range of their activities – this should be budgeted in advance to set clear expectations). A first step in this process will be to educate staff regarding the need for reform, to convince them of the benefits, and so secure ownership and commitment to the change process. In the case that existing staff are unable or unwilling to adapt their approach, or when new skills are required to support modern demands, then the recruitment of new staff should be considered to establish the target capacity). Having raised the awareness and understanding of staff, they will become more receptive to the transfer of skills, equipping the institution with sufficient capacity to move forward, with minimum disruption. |
Advantages and Disadvantages
The main benefit from institutional reform is to improve the operation and therefore the efficiency of current organisations involved with the expansion of electrification and to align them with new models and approaches to electrification. The electricity industry has usually been centred upon a national power utility, whose focus has been exclusively on grid-extension. With the increasing cost of electrification to remote areas, alternatives to the central grid have become more relevant, but the utility is often not structured in a way that can consider and react to these alternatives. The reform of the utility, and related state structures, can increase the ability of the sector to consider and react more positively to new electrification approaches. An immediate disadvantage from such reform is the impact of change. Such change is often disruptive and will initially require additional resources to introduce unfamiliar systems and there may be significant costs associated with new infrastructure and systems. There will also be the need to support capacity building for operators who have been involved with previous systems, and possibly the introduction of new staff to enable sustainable reform processes. Given these costs it is important to be sure that institutional restructuring is necessary and not just a distraction from the real challenges of extending electrification. However it is usually a one-off, upfront cost to put changes into effect; this can then be compensated over time from the improved efficiencies and more cost-effective output. |
Further Information and Guidance
|
Relevante Case Studies:
Regulatory Reform
Definition: |
Reform of laws and regulations governing the generation, distribution and sale of electricity, and of related processes and procedures. Because electricity is such an essential service, most countries have some regulation of who may provide and sell electricity, and on what terms, to protect both providers and users. Often these have in the past been based on the assumption that electricity will be provided through a national grid system. As new options for electricity provision emerge, regulatory reform may be needed to enable their implementation, to create incentives for private and public sector power utilities to provide electricity, both through the extension of electricity networks and decentralized power provision, and to protect users. |
Internactions wiht other NAE Categories:
Technology
|
Regulation of the grid system is generally well established. Reform may be required in order to allow for privatisation and introduction of private finance, creation of grid connected distribution systems or introduction of grid connected mini-grids or Independent Power Plants. Regulatory reform may also be needed to allow and incentivize isolated mini-grids. Standalone systems have in the past generally been unregulated, but as these become a more significant element in electricity provision, reform may be undertaken to bring them under regulatory control and to create incentives for their supply. In particular it may be necessary in order to allow pay-as-you-go arrangements to be established. | |
Delivery Model
|
Within a public delivery model, regulatory reform will generally be a matter of improving efficiency and transparency. Reform is likely, however, be fundamental to allowing private and public-private partnership models for electricity delivery. The regulatory structure which is the outcome of this reform will form the basis of the development of these models and how they deliver electricity access. | |
Legual Basis
|
The current regulatory framework must be the stating point for any reform. In many cases this will be a monopoly (nation-wide concession) for the national utility. The fundamental requirement to allow private sector participation is to make it legal. This may achieved simply by change in the law allowing all to generate and sell electricity, but authorities generally wish to maintain some level of oversight, over larger mini-grids at least, and so require their operators to be licensed. Alternatively, concession areas may be established, creating local monopolies for which electricity businesses can compete, with the terms of the concession agreement setting out the concessionaires rights and obligations. Standalone system providers are not usually covered by any utility monopoly (since it is the means of accessing electricity rather than electricity itself which they are selling), but as they become a more significant element in electricity provision, and particularly to allow pay-as-you-go arrangements, their regulation may be appropriate. Regulatory reform will be required to introduce such regulatory approaches, or to transition between one approach and another according to experience under local conditions. | |
Price/Tariff Regulation
|
Regulatory reform is also central to establishing regulation of prices and tariffs. Appropriate price/tariff regulation is important to to protect users and incentivize suppliers. To see further information on different forms of price/tariff regulation, please go to the Uniform Price/Tariff and Individual Price/Tariff category descriptions. | |
Finance
|
The most usual motives for regulatory reform are to allow and encourage private, commercial, investment in electricity provision and to protect users and limit the requirement for user finance through price/tariff regulation. Reform to financial and tax regulation may also be needed to allow pay-as-you-go arrangements and to establish any tax exemptions. While grants, subsidies and guarantees are less directly linked to regulatory reform, it is important that they be aligned with the regulatory framework established. | |
Other Forms of Non-Financial Interventions
|
Institutional Restructuring frequently accompanies Regulatory Reform, particularly where |
Advantages and Disadvantages
Regulatory reform is an essential pre-requisite to many National Electrification Approaches. Its main disadvantages are the costs and resources used in reform, and the risk that the regulatory system designed may not, in practice, support the intended objectives and that over-regulation may hamper rather than assist improvements in electricity access. |
Further Information and Guidance
|
Relevante Case Studies:
Policy & Target Setting
Definition: |
Finance provided by investors or lenders in the expectation of financial returns (profit). Private finance will be input on commercial terms, meaning that the investor or lender will expect to receive returns that exceed the original investment or loan and at a level that reflects the risks involved. Factors considered by financiers may include risks to implementation, delivery and technology performance, risks of cost escalation, market/demand and credit/payment risks, regulatory and macro-economic risks and external risks such as policy framework and weather. Any financier will require clear information on forecast revenues and potential risks before providing funding. It may be difficult for new electricity businesses working in new markets, and for users without a formal credit-record, to give commercial funders the confidence they require. Finance for electrification may come in the form of equity investment, or capital asset or working capital loans, and may be provided to a business as a whole, to a specific project or to end-users. Equity - Any equity investment implies partial business ownership, with the investor taking the risk of losing their investment if the electricity venture fails, but also expecting to receive bonus returns if forecast targets are exceeded. Early stage investment in new businesses often relies on finance from entrepreneurial individuals, angel investors or venture capitalists who are willing to take large risks but expect to receive high returns on their investment if it’s successful. Sources of finance - Often both international and local finance is required to support electrification – particularly where capital equipment or products are imported. The scale of funding needed for electrification may require international finance, and international financiers may have greater familiarity with, and hence be more comfortable with, some of the issues associated with the energy sector, particularly if their funding is channelled through an international company. However, local private funders will be more familiar with the national context and be more confident in resolving, and hence charge less premium for, risks associated with it. Exchange rate, and hence macro-economic, risks will always be an issue for private financiers where any of the electrification costs are in foreign currency. This issue will be greater where international funding is used to cover more than just import costs, and international funders will be very reluctant to provide finance if repatriation of funds is constrained. |
Internactions wiht other NAE Categories:
Technology
|
Most national grid systems are constructed using public funds, though private finance can be introduced through privatisation of existing assets, inviting private generators to feed into the national grid, or establishment of distribution/grid-connected mini-grid concessions. For instance, the introduction of feed-in tariffs (e.g. in Tanzania) has provided the basis for private investment in generation. Mini-grids are more frequently, though by no means always, financed by the private sector since the smaller investment and shorter payback period can reduce the risks and provides a more manageable business opportunity. Stand-alone systems offer even greater opportunities for market-based finance since the relatively short period between purchase and sale to the user means that that only business establishment and a small amount of equipment capital investment is at risk. | |
Delivery Models
|
Application of market-based finance, by definition, requires private sector ownership or a public-private partnership (PPP). PPPs are often an effective way to attract private finance since the public-sector element can offer funding and offset the risk associated with financing of electrification. Any private or PPP financing will require a business model with clear investment requirements and projections of income that provide expected return on investment over an acceptable timeframe, and with acceptable levels of risk and uncertainty. | |
Legual Basis
|
Any private finance provider will consider the legal basis of electrification in terms of the risk profile it presents to them. The lower the risk and the greater certainty, the more likelihood that private finance will be available and at a lower cost. The most fundamental requirement for any private investment in fixed assets is clarity around the legality of operating and selling electricity. This may be provided explicitly through a concession or license, or through a general exclusion of certain types of electricity provision (e.g. mini-grids below a certain size) from the need to be licensed. Without this basic regulatory clarity, and so with the risk that future introduction of regulation may undermine their business and restrict their levels of income, it will be extremely difficult to attract private finance for electrification. | |
Price/Tariff Regulation
|
Is a critical factor for private investment in electrification, with inadequate or inappropriate price/tariff regulation often cited as the key barrier to such finance. Whatever form of price/tariff regulation is used the critical requirement is that it is clear and transparent, as without this, private financiers will see a significant risk of political pressure reducing prices or tariffs to the point below which they fail to cover investment costs. | |
Other Forms of Finance
|
In many cases some other form(s) of public finance such as grants, subsidies, concessionary loans, tax exemptions or guarantees (to reduce investment risks) will be needed alongside private finance to overcome the lack of user spending power and the high costs of early market development. User Finance – Charges paid by users provide the means to repay electricity providers’ loans and equity investments and pay interest and return on capital. Where upfront charges are imposed on users, they may in turn seek to borrow to cover these charges and then repay the loan over time. Alternatively the electricity provider may seek additional finance in order to reduce up-front charges and so minimize barriers to users accessing their services. | |
Non-Financial Interventions
|
Most support activities to assist national electrification will reduce the perceived financial risk and so help to attract private sector investment and sustainable market development. Providing policies and targets, standards and technical assistance for new electrification initiatives will all increase the private financier’s certainty regarding the likely outcomes and so reduce the risk of investment. Market information, capacity building and customer engagement through promotional activity will all have a similar positive effect. |
Advantages and Disadvantages
If private finance is attracted, it can support rapid electrification at a large scale, and can free up public funding to be used for other things. If market conditions are such as to attract purely private finance, this indicates that the electrification process will be self-sustaining without dependence upon external grants or subsidies from the government or donor organisations. Where customers are able to pay for electricity at a level that allows the supply to be maintained under market conditions, there is no concern over the withdrawal of public funding that may then prevent continued access to electricity. Experience also indicates that involvement of private finance can drive innovation and efficiencies in electrification as in other sectors. Private finance, however, requires clear evidence that revenues will provide returns on investment, and this may be an insurmountable barrier, particularly for forms of electrification such as grid and mini-grid systems which have high upfront capital costs that will be recovered over long periods (perhaps 20 years). Even where macro-economic conditions are stable, regulatory frameworks and prices/tariffs transparent, and users able to afford electricity, financiers may be reluctant to provide support in the absence of established companies with a track record of performance. Much time and effort may be expended in the attempt to attract sufficient private finance without the required results. Furthermore, private finance is usually more expensive than general government borrowing and this will particularly be the case for programmes that are seen by the financiers as carrying significant levels of risk. |
Further Information and Guidance
|
Relevante Case Studies:
Quality/Technical Standards
Definition: |
Finance provided by investors or lenders in the expectation of financial returns (profit). Private finance will be input on commercial terms, meaning that the investor or lender will expect to receive returns that exceed the original investment or loan and at a level that reflects the risks involved. Factors considered by financiers may include risks to implementation, delivery and technology performance, risks of cost escalation, market/demand and credit/payment risks, regulatory and macro-economic risks and external risks such as policy framework and weather. Any financier will require clear information on forecast revenues and potential risks before providing funding. It may be difficult for new electricity businesses working in new markets, and for users without a formal credit-record, to give commercial funders the confidence they require. Finance for electrification may come in the form of equity investment, or capital asset or working capital loans, and may be provided to a business as a whole, to a specific project or to end-users. Equity - Any equity investment implies partial business ownership, with the investor taking the risk of losing their investment if the electricity venture fails, but also expecting to receive bonus returns if forecast targets are exceeded. Early stage investment in new businesses often relies on finance from entrepreneurial individuals, angel investors or venture capitalists who are willing to take large risks but expect to receive high returns on their investment if it’s successful. Sources of finance - Often both international and local finance is required to support electrification – particularly where capital equipment or products are imported. The scale of funding needed for electrification may require international finance, and international financiers may have greater familiarity with, and hence be more comfortable with, some of the issues associated with the energy sector, particularly if their funding is channelled through an international company. However, local private funders will be more familiar with the national context and be more confident in resolving, and hence charge less premium for, risks associated with it. Exchange rate, and hence macro-economic, risks will always be an issue for private financiers where any of the electrification costs are in foreign currency. This issue will be greater where international funding is used to cover more than just import costs, and international funders will be very reluctant to provide finance if repatriation of funds is constrained. |
Internactions wiht other NAE Categories:
Technology
|
Most national grid systems are constructed using public funds, though private finance can be introduced through privatisation of existing assets, inviting private generators to feed into the national grid, or establishment of distribution/grid-connected mini-grid concessions. For instance, the introduction of feed-in tariffs (e.g. in Tanzania) has provided the basis for private investment in generation. Mini-grids are more frequently, though by no means always, financed by the private sector since the smaller investment and shorter payback period can reduce the risks and provides a more manageable business opportunity. Stand-alone systems offer even greater opportunities for market-based finance since the relatively short period between purchase and sale to the user means that that only business establishment and a small amount of equipment capital investment is at risk. | |
Delivery Models
|
Application of market-based finance, by definition, requires private sector ownership or a public-private partnership (PPP). PPPs are often an effective way to attract private finance since the public-sector element can offer funding and offset the risk associated with financing of electrification. Any private or PPP financing will require a business model with clear investment requirements and projections of income that provide expected return on investment over an acceptable timeframe, and with acceptable levels of risk and uncertainty. | |
Legual Basis
|
Any private finance provider will consider the legal basis of electrification in terms of the risk profile it presents to them. The lower the risk and the greater certainty, the more likelihood that private finance will be available and at a lower cost. The most fundamental requirement for any private investment in fixed assets is clarity around the legality of operating and selling electricity. This may be provided explicitly through a concession or license, or through a general exclusion of certain types of electricity provision (e.g. mini-grids below a certain size) from the need to be licensed. Without this basic regulatory clarity, and so with the risk that future introduction of regulation may undermine their business and restrict their levels of income, it will be extremely difficult to attract private finance for electrification. | |
Price/Tariff Regulation
|
Is a critical factor for private investment in electrification, with inadequate or inappropriate price/tariff regulation often cited as the key barrier to such finance. Whatever form of price/tariff regulation is used the critical requirement is that it is clear and transparent, as without this, private financiers will see a significant risk of political pressure reducing prices or tariffs to the point below which they fail to cover investment costs. | |
Other Forms of Finance
|
In many cases some other form(s) of public finance such as grants, subsidies, concessionary loans, tax exemptions or guarantees (to reduce investment risks) will be needed alongside private finance to overcome the lack of user spending power and the high costs of early market development. User Finance – Charges paid by users provide the means to repay electricity providers’ loans and equity investments and pay interest and return on capital. Where upfront charges are imposed on users, they may in turn seek to borrow to cover these charges and then repay the loan over time. Alternatively the electricity provider may seek additional finance in order to reduce up-front charges and so minimize barriers to users accessing their services. | |
Non-Financial Interventions
|
Most support activities to assist national electrification will reduce the perceived financial risk and so help to attract private sector investment and sustainable market development. Providing policies and targets, standards and technical assistance for new electrification initiatives will all increase the private financier’s certainty regarding the likely outcomes and so reduce the risk of investment. Market information, capacity building and customer engagement through promotional activity will all have a similar positive effect. |
Advantages and Disadvantages
If private finance is attracted, it can support rapid electrification at a large scale, and can free up public funding to be used for other things. If market conditions are such as to attract purely private finance, this indicates that the electrification process will be self-sustaining without dependence upon external grants or subsidies from the government or donor organisations. Where customers are able to pay for electricity at a level that allows the supply to be maintained under market conditions, there is no concern over the withdrawal of public funding that may then prevent continued access to electricity. Experience also indicates that involvement of private finance can drive innovation and efficiencies in electrification as in other sectors. Private finance, however, requires clear evidence that revenues will provide returns on investment, and this may be an insurmountable barrier, particularly for forms of electrification such as grid and mini-grid systems which have high upfront capital costs that will be recovered over long periods (perhaps 20 years). Even where macro-economic conditions are stable, regulatory frameworks and prices/tariffs transparent, and users able to afford electricity, financiers may be reluctant to provide support in the absence of established companies with a track record of performance. Much time and effort may be expended in the attempt to attract sufficient private finance without the required results. Furthermore, private finance is usually more expensive than general government borrowing and this will particularly be the case for programmes that are seen by the financiers as carrying significant levels of risk. |
Further Information and Guidance
|
Relevante Case Studies:
Technical Assistance
Definition: |
Finance provided by investors or lenders in the expectation of financial returns (profit). Private finance will be input on commercial terms, meaning that the investor or lender will expect to receive returns that exceed the original investment or loan and at a level that reflects the risks involved. Factors considered by financiers may include risks to implementation, delivery and technology performance, risks of cost escalation, market/demand and credit/payment risks, regulatory and macro-economic risks and external risks such as policy framework and weather. Any financier will require clear information on forecast revenues and potential risks before providing funding. It may be difficult for new electricity businesses working in new markets, and for users without a formal credit-record, to give commercial funders the confidence they require. Finance for electrification may come in the form of equity investment, or capital asset or working capital loans, and may be provided to a business as a whole, to a specific project or to end-users. Equity - Any equity investment implies partial business ownership, with the investor taking the risk of losing their investment if the electricity venture fails, but also expecting to receive bonus returns if forecast targets are exceeded. Early stage investment in new businesses often relies on finance from entrepreneurial individuals, angel investors or venture capitalists who are willing to take large risks but expect to receive high returns on their investment if it’s successful. Sources of finance - Often both international and local finance is required to support electrification – particularly where capital equipment or products are imported. The scale of funding needed for electrification may require international finance, and international financiers may have greater familiarity with, and hence be more comfortable with, some of the issues associated with the energy sector, particularly if their funding is channelled through an international company. However, local private funders will be more familiar with the national context and be more confident in resolving, and hence charge less premium for, risks associated with it. Exchange rate, and hence macro-economic, risks will always be an issue for private financiers where any of the electrification costs are in foreign currency. This issue will be greater where international funding is used to cover more than just import costs, and international funders will be very reluctant to provide finance if repatriation of funds is constrained. |
Internactions wiht other NAE Categories:
Technology
|
Most national grid systems are constructed using public funds, though private finance can be introduced through privatisation of existing assets, inviting private generators to feed into the national grid, or establishment of distribution/grid-connected mini-grid concessions. For instance, the introduction of feed-in tariffs (e.g. in Tanzania) has provided the basis for private investment in generation. Mini-grids are more frequently, though by no means always, financed by the private sector since the smaller investment and shorter payback period can reduce the risks and provides a more manageable business opportunity. Stand-alone systems offer even greater opportunities for market-based finance since the relatively short period between purchase and sale to the user means that that only business establishment and a small amount of equipment capital investment is at risk. | |
Delivery Models
|
Application of market-based finance, by definition, requires private sector ownership or a public-private partnership (PPP). PPPs are often an effective way to attract private finance since the public-sector element can offer funding and offset the risk associated with financing of electrification. Any private or PPP financing will require a business model with clear investment requirements and projections of income that provide expected return on investment over an acceptable timeframe, and with acceptable levels of risk and uncertainty. | |
Legual Basis
|
Any private finance provider will consider the legal basis of electrification in terms of the risk profile it presents to them. The lower the risk and the greater certainty, the more likelihood that private finance will be available and at a lower cost. The most fundamental requirement for any private investment in fixed assets is clarity around the legality of operating and selling electricity. This may be provided explicitly through a concession or license, or through a general exclusion of certain types of electricity provision (e.g. mini-grids below a certain size) from the need to be licensed. Without this basic regulatory clarity, and so with the risk that future introduction of regulation may undermine their business and restrict their levels of income, it will be extremely difficult to attract private finance for electrification. | |
Price/Tariff Regulation
|
Is a critical factor for private investment in electrification, with inadequate or inappropriate price/tariff regulation often cited as the key barrier to such finance. Whatever form of price/tariff regulation is used the critical requirement is that it is clear and transparent, as without this, private financiers will see a significant risk of political pressure reducing prices or tariffs to the point below which they fail to cover investment costs. | |
Other Forms of Finance
|
In many cases some other form(s) of public finance such as grants, subsidies, concessionary loans, tax exemptions or guarantees (to reduce investment risks) will be needed alongside private finance to overcome the lack of user spending power and the high costs of early market development. User Finance – Charges paid by users provide the means to repay electricity providers’ loans and equity investments and pay interest and return on capital. Where upfront charges are imposed on users, they may in turn seek to borrow to cover these charges and then repay the loan over time. Alternatively the electricity provider may seek additional finance in order to reduce up-front charges and so minimize barriers to users accessing their services. | |
Non-Financial Interventions
|
Most support activities to assist national electrification will reduce the perceived financial risk and so help to attract private sector investment and sustainable market development. Providing policies and targets, standards and technical assistance for new electrification initiatives will all increase the private financier’s certainty regarding the likely outcomes and so reduce the risk of investment. Market information, capacity building and customer engagement through promotional activity will all have a similar positive effect. |
Advantages and Disadvantages
If private finance is attracted, it can support rapid electrification at a large scale, and can free up public funding to be used for other things. If market conditions are such as to attract purely private finance, this indicates that the electrification process will be self-sustaining without dependence upon external grants or subsidies from the government or donor organisations. Where customers are able to pay for electricity at a level that allows the supply to be maintained under market conditions, there is no concern over the withdrawal of public funding that may then prevent continued access to electricity. Experience also indicates that involvement of private finance can drive innovation and efficiencies in electrification as in other sectors. Private finance, however, requires clear evidence that revenues will provide returns on investment, and this may be an insurmountable barrier, particularly for forms of electrification such as grid and mini-grid systems which have high upfront capital costs that will be recovered over long periods (perhaps 20 years). Even where macro-economic conditions are stable, regulatory frameworks and prices/tariffs transparent, and users able to afford electricity, financiers may be reluctant to provide support in the absence of established companies with a track record of performance. Much time and effort may be expended in the attempt to attract sufficient private finance without the required results. Furthermore, private finance is usually more expensive than general government borrowing and this will particularly be the case for programmes that are seen by the financiers as carrying significant levels of risk. |
Further Information and Guidance
|
Relevante Case Studies:
Capacity Building/Awarness Raising
Definition: |
Finance provided by investors or lenders in the expectation of financial returns (profit). Private finance will be input on commercial terms, meaning that the investor or lender will expect to receive returns that exceed the original investment or loan and at a level that reflects the risks involved. Factors considered by financiers may include risks to implementation, delivery and technology performance, risks of cost escalation, market/demand and credit/payment risks, regulatory and macro-economic risks and external risks such as policy framework and weather. Any financier will require clear information on forecast revenues and potential risks before providing funding. It may be difficult for new electricity businesses working in new markets, and for users without a formal credit-record, to give commercial funders the confidence they require. Finance for electrification may come in the form of equity investment, or capital asset or working capital loans, and may be provided to a business as a whole, to a specific project or to end-users. Equity - Any equity investment implies partial business ownership, with the investor taking the risk of losing their investment if the electricity venture fails, but also expecting to receive bonus returns if forecast targets are exceeded. Early stage investment in new businesses often relies on finance from entrepreneurial individuals, angel investors or venture capitalists who are willing to take large risks but expect to receive high returns on their investment if it’s successful. Sources of finance - Often both international and local finance is required to support electrification – particularly where capital equipment or products are imported. The scale of funding needed for electrification may require international finance, and international financiers may have greater familiarity with, and hence be more comfortable with, some of the issues associated with the energy sector, particularly if their funding is channelled through an international company. However, local private funders will be more familiar with the national context and be more confident in resolving, and hence charge less premium for, risks associated with it. Exchange rate, and hence macro-economic, risks will always be an issue for private financiers where any of the electrification costs are in foreign currency. This issue will be greater where international funding is used to cover more than just import costs, and international funders will be very reluctant to provide finance if repatriation of funds is constrained. |
Internactions wiht other NAE Categories:
Technology
|
Most national grid systems are constructed using public funds, though private finance can be introduced through privatisation of existing assets, inviting private generators to feed into the national grid, or establishment of distribution/grid-connected mini-grid concessions. For instance, the introduction of feed-in tariffs (e.g. in Tanzania) has provided the basis for private investment in generation. Mini-grids are more frequently, though by no means always, financed by the private sector since the smaller investment and shorter payback period can reduce the risks and provides a more manageable business opportunity. Stand-alone systems offer even greater opportunities for market-based finance since the relatively short period between purchase and sale to the user means that that only business establishment and a small amount of equipment capital investment is at risk. | |
Delivery Models
|
Application of market-based finance, by definition, requires private sector ownership or a public-private partnership (PPP). PPPs are often an effective way to attract private finance since the public-sector element can offer funding and offset the risk associated with financing of electrification. Any private or PPP financing will require a business model with clear investment requirements and projections of income that provide expected return on investment over an acceptable timeframe, and with acceptable levels of risk and uncertainty. | |
Legual Basis
|
Any private finance provider will consider the legal basis of electrification in terms of the risk profile it presents to them. The lower the risk and the greater certainty, the more likelihood that private finance will be available and at a lower cost. The most fundamental requirement for any private investment in fixed assets is clarity around the legality of operating and selling electricity. This may be provided explicitly through a concession or license, or through a general exclusion of certain types of electricity provision (e.g. mini-grids below a certain size) from the need to be licensed. Without this basic regulatory clarity, and so with the risk that future introduction of regulation may undermine their business and restrict their levels of income, it will be extremely difficult to attract private finance for electrification. | |
Price/Tariff Regulation
|
Is a critical factor for private investment in electrification, with inadequate or inappropriate price/tariff regulation often cited as the key barrier to such finance. Whatever form of price/tariff regulation is used the critical requirement is that it is clear and transparent, as without this, private financiers will see a significant risk of political pressure reducing prices or tariffs to the point below which they fail to cover investment costs. | |
Other Forms of Finance
|
In many cases some other form(s) of public finance such as grants, subsidies, concessionary loans, tax exemptions or guarantees (to reduce investment risks) will be needed alongside private finance to overcome the lack of user spending power and the high costs of early market development. User Finance – Charges paid by users provide the means to repay electricity providers’ loans and equity investments and pay interest and return on capital. Where upfront charges are imposed on users, they may in turn seek to borrow to cover these charges and then repay the loan over time. Alternatively the electricity provider may seek additional finance in order to reduce up-front charges and so minimize barriers to users accessing their services. | |
Non-Financial Interventions
|
Most support activities to assist national electrification will reduce the perceived financial risk and so help to attract private sector investment and sustainable market development. Providing policies and targets, standards and technical assistance for new electrification initiatives will all increase the private financier’s certainty regarding the likely outcomes and so reduce the risk of investment. Market information, capacity building and customer engagement through promotional activity will all have a similar positive effect. |
Advantages and Disadvantages
If private finance is attracted, it can support rapid electrification at a large scale, and can free up public funding to be used for other things. If market conditions are such as to attract purely private finance, this indicates that the electrification process will be self-sustaining without dependence upon external grants or subsidies from the government or donor organisations. Where customers are able to pay for electricity at a level that allows the supply to be maintained under market conditions, there is no concern over the withdrawal of public funding that may then prevent continued access to electricity. Experience also indicates that involvement of private finance can drive innovation and efficiencies in electrification as in other sectors. Private finance, however, requires clear evidence that revenues will provide returns on investment, and this may be an insurmountable barrier, particularly for forms of electrification such as grid and mini-grid systems which have high upfront capital costs that will be recovered over long periods (perhaps 20 years). Even where macro-economic conditions are stable, regulatory frameworks and prices/tariffs transparent, and users able to afford electricity, financiers may be reluctant to provide support in the absence of established companies with a track record of performance. Much time and effort may be expended in the attempt to attract sufficient private finance without the required results. Furthermore, private finance is usually more expensive than general government borrowing and this will particularly be the case for programmes that are seen by the financiers as carrying significant levels of risk. |
Further Information and Guidance
|
Relevante Case Studies:
Market Information
Definition: |
Finance provided by investors or lenders in the expectation of financial returns (profit). Private finance will be input on commercial terms, meaning that the investor or lender will expect to receive returns that exceed the original investment or loan and at a level that reflects the risks involved. Factors considered by financiers may include risks to implementation, delivery and technology performance, risks of cost escalation, market/demand and credit/payment risks, regulatory and macro-economic risks and external risks such as policy framework and weather. Any financier will require clear information on forecast revenues and potential risks before providing funding. It may be difficult for new electricity businesses working in new markets, and for users without a formal credit-record, to give commercial funders the confidence they require. Finance for electrification may come in the form of equity investment, or capital asset or working capital loans, and may be provided to a business as a whole, to a specific project or to end-users. Equity - Any equity investment implies partial business ownership, with the investor taking the risk of losing their investment if the electricity venture fails, but also expecting to receive bonus returns if forecast targets are exceeded. Early stage investment in new businesses often relies on finance from entrepreneurial individuals, angel investors or venture capitalists who are willing to take large risks but expect to receive high returns on their investment if it’s successful. Sources of finance - Often both international and local finance is required to support electrification – particularly where capital equipment or products are imported. The scale of funding needed for electrification may require international finance, and international financiers may have greater familiarity with, and hence be more comfortable with, some of the issues associated with the energy sector, particularly if their funding is channelled through an international company. However, local private funders will be more familiar with the national context and be more confident in resolving, and hence charge less premium for, risks associated with it. Exchange rate, and hence macro-economic, risks will always be an issue for private financiers where any of the electrification costs are in foreign currency. This issue will be greater where international funding is used to cover more than just import costs, and international funders will be very reluctant to provide finance if repatriation of funds is constrained. |
Internactions wiht other NAE Categories:
Technology
|
Most national grid systems are constructed using public funds, though private finance can be introduced through privatisation of existing assets, inviting private generators to feed into the national grid, or establishment of distribution/grid-connected mini-grid concessions. For instance, the introduction of feed-in tariffs (e.g. in Tanzania) has provided the basis for private investment in generation. Mini-grids are more frequently, though by no means always, financed by the private sector since the smaller investment and shorter payback period can reduce the risks and provides a more manageable business opportunity. Stand-alone systems offer even greater opportunities for market-based finance since the relatively short period between purchase and sale to the user means that that only business establishment and a small amount of equipment capital investment is at risk. | |
Delivery Models
|
Application of market-based finance, by definition, requires private sector ownership or a public-private partnership (PPP). PPPs are often an effective way to attract private finance since the public-sector element can offer funding and offset the risk associated with financing of electrification. Any private or PPP financing will require a business model with clear investment requirements and projections of income that provide expected return on investment over an acceptable timeframe, and with acceptable levels of risk and uncertainty. | |
Legual Basis
|
Any private finance provider will consider the legal basis of electrification in terms of the risk profile it presents to them. The lower the risk and the greater certainty, the more likelihood that private finance will be available and at a lower cost. The most fundamental requirement for any private investment in fixed assets is clarity around the legality of operating and selling electricity. This may be provided explicitly through a concession or license, or through a general exclusion of certain types of electricity provision (e.g. mini-grids below a certain size) from the need to be licensed. Without this basic regulatory clarity, and so with the risk that future introduction of regulation may undermine their business and restrict their levels of income, it will be extremely difficult to attract private finance for electrification. | |
Price/Tariff Regulation
|
Is a critical factor for private investment in electrification, with inadequate or inappropriate price/tariff regulation often cited as the key barrier to such finance. Whatever form of price/tariff regulation is used the critical requirement is that it is clear and transparent, as without this, private financiers will see a significant risk of political pressure reducing prices or tariffs to the point below which they fail to cover investment costs. | |
Other Forms of Finance
|
In many cases some other form(s) of public finance such as grants, subsidies, concessionary loans, tax exemptions or guarantees (to reduce investment risks) will be needed alongside private finance to overcome the lack of user spending power and the high costs of early market development. User Finance – Charges paid by users provide the means to repay electricity providers’ loans and equity investments and pay interest and return on capital. Where upfront charges are imposed on users, they may in turn seek to borrow to cover these charges and then repay the loan over time. Alternatively the electricity provider may seek additional finance in order to reduce up-front charges and so minimize barriers to users accessing their services. | |
Non-Financial Interventions
|
Most support activities to assist national electrification will reduce the perceived financial risk and so help to attract private sector investment and sustainable market development. Providing policies and targets, standards and technical assistance for new electrification initiatives will all increase the private financier’s certainty regarding the likely outcomes and so reduce the risk of investment. Market information, capacity building and customer engagement through promotional activity will all have a similar positive effect. |
Advantages and Disadvantages
If private finance is attracted, it can support rapid electrification at a large scale, and can free up public funding to be used for other things. If market conditions are such as to attract purely private finance, this indicates that the electrification process will be self-sustaining without dependence upon external grants or subsidies from the government or donor organisations. Where customers are able to pay for electricity at a level that allows the supply to be maintained under market conditions, there is no concern over the withdrawal of public funding that may then prevent continued access to electricity. Experience also indicates that involvement of private finance can drive innovation and efficiencies in electrification as in other sectors. Private finance, however, requires clear evidence that revenues will provide returns on investment, and this may be an insurmountable barrier, particularly for forms of electrification such as grid and mini-grid systems which have high upfront capital costs that will be recovered over long periods (perhaps 20 years). Even where macro-economic conditions are stable, regulatory frameworks and prices/tariffs transparent, and users able to afford electricity, financiers may be reluctant to provide support in the absence of established companies with a track record of performance. Much time and effort may be expended in the attempt to attract sufficient private finance without the required results. Furthermore, private finance is usually more expensive than general government borrowing and this will particularly be the case for programmes that are seen by the financiers as carrying significant levels of risk. |
Further Information and Guidance
|
Relevante Case Studies:
Demand Promotion
Definition: |
Finance provided by investors or lenders in the expectation of financial returns (profit). Private finance will be input on commercial terms, meaning that the investor or lender will expect to receive returns that exceed the original investment or loan and at a level that reflects the risks involved. Factors considered by financiers may include risks to implementation, delivery and technology performance, risks of cost escalation, market/demand and credit/payment risks, regulatory and macro-economic risks and external risks such as policy framework and weather. Any financier will require clear information on forecast revenues and potential risks before providing funding. It may be difficult for new electricity businesses working in new markets, and for users without a formal credit-record, to give commercial funders the confidence they require. Finance for electrification may come in the form of equity investment, or capital asset or working capital loans, and may be provided to a business as a whole, to a specific project or to end-users. Equity - Any equity investment implies partial business ownership, with the investor taking the risk of losing their investment if the electricity venture fails, but also expecting to receive bonus returns if forecast targets are exceeded. Early stage investment in new businesses often relies on finance from entrepreneurial individuals, angel investors or venture capitalists who are willing to take large risks but expect to receive high returns on their investment if it’s successful. Sources of finance - Often both international and local finance is required to support electrification – particularly where capital equipment or products are imported. The scale of funding needed for electrification may require international finance, and international financiers may have greater familiarity with, and hence be more comfortable with, some of the issues associated with the energy sector, particularly if their funding is channelled through an international company. However, local private funders will be more familiar with the national context and be more confident in resolving, and hence charge less premium for, risks associated with it. Exchange rate, and hence macro-economic, risks will always be an issue for private financiers where any of the electrification costs are in foreign currency. This issue will be greater where international funding is used to cover more than just import costs, and international funders will be very reluctant to provide finance if repatriation of funds is constrained. |
Internactions wiht other NAE Categories:
Technology
|
Most national grid systems are constructed using public funds, though private finance can be introduced through privatisation of existing assets, inviting private generators to feed into the national grid, or establishment of distribution/grid-connected mini-grid concessions. For instance, the introduction of feed-in tariffs (e.g. in Tanzania) has provided the basis for private investment in generation. Mini-grids are more frequently, though by no means always, financed by the private sector since the smaller investment and shorter payback period can reduce the risks and provides a more manageable business opportunity. Stand-alone systems offer even greater opportunities for market-based finance since the relatively short period between purchase and sale to the user means that that only business establishment and a small amount of equipment capital investment is at risk. | |
Delivery Models
|
Application of market-based finance, by definition, requires private sector ownership or a public-private partnership (PPP). PPPs are often an effective way to attract private finance since the public-sector element can offer funding and offset the risk associated with financing of electrification. Any private or PPP financing will require a business model with clear investment requirements and projections of income that provide expected return on investment over an acceptable timeframe, and with acceptable levels of risk and uncertainty. | |
Legual Basis
|
Any private finance provider will consider the legal basis of electrification in terms of the risk profile it presents to them. The lower the risk and the greater certainty, the more likelihood that private finance will be available and at a lower cost. The most fundamental requirement for any private investment in fixed assets is clarity around the legality of operating and selling electricity. This may be provided explicitly through a concession or license, or through a general exclusion of certain types of electricity provision (e.g. mini-grids below a certain size) from the need to be licensed. Without this basic regulatory clarity, and so with the risk that future introduction of regulation may undermine their business and restrict their levels of income, it will be extremely difficult to attract private finance for electrification. | |
Price/Tariff Regulation
|
Is a critical factor for private investment in electrification, with inadequate or inappropriate price/tariff regulation often cited as the key barrier to such finance. Whatever form of price/tariff regulation is used the critical requirement is that it is clear and transparent, as without this, private financiers will see a significant risk of political pressure reducing prices or tariffs to the point below which they fail to cover investment costs. | |
Other Forms of Finance
|
In many cases some other form(s) of public finance such as grants, subsidies, concessionary loans, tax exemptions or guarantees (to reduce investment risks) will be needed alongside private finance to overcome the lack of user spending power and the high costs of early market development. User Finance – Charges paid by users provide the means to repay electricity providers’ loans and equity investments and pay interest and return on capital. Where upfront charges are imposed on users, they may in turn seek to borrow to cover these charges and then repay the loan over time. Alternatively the electricity provider may seek additional finance in order to reduce up-front charges and so minimize barriers to users accessing their services. | |
Non-Financial Interventions
|
Most support activities to assist national electrification will reduce the perceived financial risk and so help to attract private sector investment and sustainable market development. Providing policies and targets, standards and technical assistance for new electrification initiatives will all increase the private financier’s certainty regarding the likely outcomes and so reduce the risk of investment. Market information, capacity building and customer engagement through promotional activity will all have a similar positive effect. |
Advantages and Disadvantages
If private finance is attracted, it can support rapid electrification at a large scale, and can free up public funding to be used for other things. If market conditions are such as to attract purely private finance, this indicates that the electrification process will be self-sustaining without dependence upon external grants or subsidies from the government or donor organisations. Where customers are able to pay for electricity at a level that allows the supply to be maintained under market conditions, there is no concern over the withdrawal of public funding that may then prevent continued access to electricity. Experience also indicates that involvement of private finance can drive innovation and efficiencies in electrification as in other sectors. Private finance, however, requires clear evidence that revenues will provide returns on investment, and this may be an insurmountable barrier, particularly for forms of electrification such as grid and mini-grid systems which have high upfront capital costs that will be recovered over long periods (perhaps 20 years). Even where macro-economic conditions are stable, regulatory frameworks and prices/tariffs transparent, and users able to afford electricity, financiers may be reluctant to provide support in the absence of established companies with a track record of performance. Much time and effort may be expended in the attempt to attract sufficient private finance without the required results. Furthermore, private finance is usually more expensive than general government borrowing and this will particularly be the case for programmes that are seen by the financiers as carrying significant levels of risk. |
Further Information and Guidance
|
Relevante Case Studies:
Technology Development/Adoption
Definition: |
Finance provided by investors or lenders in the expectation of financial returns (profit). Private finance will be input on commercial terms, meaning that the investor or lender will expect to receive returns that exceed the original investment or loan and at a level that reflects the risks involved. Factors considered by financiers may include risks to implementation, delivery and technology performance, risks of cost escalation, market/demand and credit/payment risks, regulatory and macro-economic risks and external risks such as policy framework and weather. Any financier will require clear information on forecast revenues and potential risks before providing funding. It may be difficult for new electricity businesses working in new markets, and for users without a formal credit-record, to give commercial funders the confidence they require. Finance for electrification may come in the form of equity investment, or capital asset or working capital loans, and may be provided to a business as a whole, to a specific project or to end-users. Equity - Any equity investment implies partial business ownership, with the investor taking the risk of losing their investment if the electricity venture fails, but also expecting to receive bonus returns if forecast targets are exceeded. Early stage investment in new businesses often relies on finance from entrepreneurial individuals, angel investors or venture capitalists who are willing to take large risks but expect to receive high returns on their investment if it’s successful. Sources of finance - Often both international and local finance is required to support electrification – particularly where capital equipment or products are imported. The scale of funding needed for electrification may require international finance, and international financiers may have greater familiarity with, and hence be more comfortable with, some of the issues associated with the energy sector, particularly if their funding is channelled through an international company. However, local private funders will be more familiar with the national context and be more confident in resolving, and hence charge less premium for, risks associated with it. Exchange rate, and hence macro-economic, risks will always be an issue for private financiers where any of the electrification costs are in foreign currency. This issue will be greater where international funding is used to cover more than just import costs, and international funders will be very reluctant to provide finance if repatriation of funds is constrained. |
Internactions wiht other NAE Categories:
Technology
|
Most national grid systems are constructed using public funds, though private finance can be introduced through privatisation of existing assets, inviting private generators to feed into the national grid, or establishment of distribution/grid-connected mini-grid concessions. For instance, the introduction of feed-in tariffs (e.g. in Tanzania) has provided the basis for private investment in generation. Mini-grids are more frequently, though by no means always, financed by the private sector since the smaller investment and shorter payback period can reduce the risks and provides a more manageable business opportunity. Stand-alone systems offer even greater opportunities for market-based finance since the relatively short period between purchase and sale to the user means that that only business establishment and a small amount of equipment capital investment is at risk. | |
Delivery Models
|
Application of market-based finance, by definition, requires private sector ownership or a public-private partnership (PPP). PPPs are often an effective way to attract private finance since the public-sector element can offer funding and offset the risk associated with financing of electrification. Any private or PPP financing will require a business model with clear investment requirements and projections of income that provide expected return on investment over an acceptable timeframe, and with acceptable levels of risk and uncertainty. | |
Legual Basis
|
Any private finance provider will consider the legal basis of electrification in terms of the risk profile it presents to them. The lower the risk and the greater certainty, the more likelihood that private finance will be available and at a lower cost. The most fundamental requirement for any private investment in fixed assets is clarity around the legality of operating and selling electricity. This may be provided explicitly through a concession or license, or through a general exclusion of certain types of electricity provision (e.g. mini-grids below a certain size) from the need to be licensed. Without this basic regulatory clarity, and so with the risk that future introduction of regulation may undermine their business and restrict their levels of income, it will be extremely difficult to attract private finance for electrification. | |
Price/Tariff Regulation
|
Is a critical factor for private investment in electrification, with inadequate or inappropriate price/tariff regulation often cited as the key barrier to such finance. Whatever form of price/tariff regulation is used the critical requirement is that it is clear and transparent, as without this, private financiers will see a significant risk of political pressure reducing prices or tariffs to the point below which they fail to cover investment costs. | |
Other Forms of Finance
|
In many cases some other form(s) of public finance such as grants, subsidies, concessionary loans, tax exemptions or guarantees (to reduce investment risks) will be needed alongside private finance to overcome the lack of user spending power and the high costs of early market development. User Finance – Charges paid by users provide the means to repay electricity providers’ loans and equity investments and pay interest and return on capital. Where upfront charges are imposed on users, they may in turn seek to borrow to cover these charges and then repay the loan over time. Alternatively the electricity provider may seek additional finance in order to reduce up-front charges and so minimize barriers to users accessing their services. | |
Non-Financial Interventions
|
Most support activities to assist national electrification will reduce the perceived financial risk and so help to attract private sector investment and sustainable market development. Providing policies and targets, standards and technical assistance for new electrification initiatives will all increase the private financier’s certainty regarding the likely outcomes and so reduce the risk of investment. Market information, capacity building and customer engagement through promotional activity will all have a similar positive effect. |
Advantages and Disadvantages
If private finance is attracted, it can support rapid electrification at a large scale, and can free up public funding to be used for other things. If market conditions are such as to attract purely private finance, this indicates that the electrification process will be self-sustaining without dependence upon external grants or subsidies from the government or donor organisations. Where customers are able to pay for electricity at a level that allows the supply to be maintained under market conditions, there is no concern over the withdrawal of public funding that may then prevent continued access to electricity. Experience also indicates that involvement of private finance can drive innovation and efficiencies in electrification as in other sectors. Private finance, however, requires clear evidence that revenues will provide returns on investment, and this may be an insurmountable barrier, particularly for forms of electrification such as grid and mini-grid systems which have high upfront capital costs that will be recovered over long periods (perhaps 20 years). Even where macro-economic conditions are stable, regulatory frameworks and prices/tariffs transparent, and users able to afford electricity, financiers may be reluctant to provide support in the absence of established companies with a track record of performance. Much time and effort may be expended in the attempt to attract sufficient private finance without the required results. Furthermore, private finance is usually more expensive than general government borrowing and this will particularly be the case for programmes that are seen by the financiers as carrying significant levels of risk. |
Further Information and Guidance
|
Relevante Case Studies:
National Energy Planning
Definition: |
Finance provided by investors or lenders in the expectation of financial returns (profit). Private finance will be input on commercial terms, meaning that the investor or lender will expect to receive returns that exceed the original investment or loan and at a level that reflects the risks involved. Factors considered by financiers may include risks to implementation, delivery and technology performance, risks of cost escalation, market/demand and credit/payment risks, regulatory and macro-economic risks and external risks such as policy framework and weather. Any financier will require clear information on forecast revenues and potential risks before providing funding. It may be difficult for new electricity businesses working in new markets, and for users without a formal credit-record, to give commercial funders the confidence they require. Finance for electrification may come in the form of equity investment, or capital asset or working capital loans, and may be provided to a business as a whole, to a specific project or to end-users. Equity - Any equity investment implies partial business ownership, with the investor taking the risk of losing their investment if the electricity venture fails, but also expecting to receive bonus returns if forecast targets are exceeded. Early stage investment in new businesses often relies on finance from entrepreneurial individuals, angel investors or venture capitalists who are willing to take large risks but expect to receive high returns on their investment if it’s successful. Sources of finance - Often both international and local finance is required to support electrification – particularly where capital equipment or products are imported. The scale of funding needed for electrification may require international finance, and international financiers may have greater familiarity with, and hence be more comfortable with, some of the issues associated with the energy sector, particularly if their funding is channelled through an international company. However, local private funders will be more familiar with the national context and be more confident in resolving, and hence charge less premium for, risks associated with it. Exchange rate, and hence macro-economic, risks will always be an issue for private financiers where any of the electrification costs are in foreign currency. This issue will be greater where international funding is used to cover more than just import costs, and international funders will be very reluctant to provide finance if repatriation of funds is constrained. |
Internactions wiht other NAE Categories:
Technology
|
Most national grid systems are constructed using public funds, though private finance can be introduced through privatisation of existing assets, inviting private generators to feed into the national grid, or establishment of distribution/grid-connected mini-grid concessions. For instance, the introduction of feed-in tariffs (e.g. in Tanzania) has provided the basis for private investment in generation. Mini-grids are more frequently, though by no means always, financed by the private sector since the smaller investment and shorter payback period can reduce the risks and provides a more manageable business opportunity. Stand-alone systems offer even greater opportunities for market-based finance since the relatively short period between purchase and sale to the user means that that only business establishment and a small amount of equipment capital investment is at risk. | |
Delivery Models
|
Application of market-based finance, by definition, requires private sector ownership or a public-private partnership (PPP). PPPs are often an effective way to attract private finance since the public-sector element can offer funding and offset the risk associated with financing of electrification. Any private or PPP financing will require a business model with clear investment requirements and projections of income that provide expected return on investment over an acceptable timeframe, and with acceptable levels of risk and uncertainty. | |
Legual Basis
|
Any private finance provider will consider the legal basis of electrification in terms of the risk profile it presents to them. The lower the risk and the greater certainty, the more likelihood that private finance will be available and at a lower cost. The most fundamental requirement for any private investment in fixed assets is clarity around the legality of operating and selling electricity. This may be provided explicitly through a concession or license, or through a general exclusion of certain types of electricity provision (e.g. mini-grids below a certain size) from the need to be licensed. Without this basic regulatory clarity, and so with the risk that future introduction of regulation may undermine their business and restrict their levels of income, it will be extremely difficult to attract private finance for electrification. | |
Price/Tariff Regulation
|
Is a critical factor for private investment in electrification, with inadequate or inappropriate price/tariff regulation often cited as the key barrier to such finance. Whatever form of price/tariff regulation is used the critical requirement is that it is clear and transparent, as without this, private financiers will see a significant risk of political pressure reducing prices or tariffs to the point below which they fail to cover investment costs. | |
Other Forms of Finance
|
In many cases some other form(s) of public finance such as grants, subsidies, concessionary loans, tax exemptions or guarantees (to reduce investment risks) will be needed alongside private finance to overcome the lack of user spending power and the high costs of early market development. User Finance – Charges paid by users provide the means to repay electricity providers’ loans and equity investments and pay interest and return on capital. Where upfront charges are imposed on users, they may in turn seek to borrow to cover these charges and then repay the loan over time. Alternatively the electricity provider may seek additional finance in order to reduce up-front charges and so minimize barriers to users accessing their services. | |
Non-Financial Interventions
|
Most support activities to assist national electrification will reduce the perceived financial risk and so help to attract private sector investment and sustainable market development. Providing policies and targets, standards and technical assistance for new electrification initiatives will all increase the private financier’s certainty regarding the likely outcomes and so reduce the risk of investment. Market information, capacity building and customer engagement through promotional activity will all have a similar positive effect. |
Advantages and Disadvantages
If private finance is attracted, it can support rapid electrification at a large scale, and can free up public funding to be used for other things. If market conditions are such as to attract purely private finance, this indicates that the electrification process will be self-sustaining without dependence upon external grants or subsidies from the government or donor organisations. Where customers are able to pay for electricity at a level that allows the supply to be maintained under market conditions, there is no concern over the withdrawal of public funding that may then prevent continued access to electricity. Experience also indicates that involvement of private finance can drive innovation and efficiencies in electrification as in other sectors. Private finance, however, requires clear evidence that revenues will provide returns on investment, and this may be an insurmountable barrier, particularly for forms of electrification such as grid and mini-grid systems which have high upfront capital costs that will be recovered over long periods (perhaps 20 years). Even where macro-economic conditions are stable, regulatory frameworks and prices/tariffs transparent, and users able to afford electricity, financiers may be reluctant to provide support in the absence of established companies with a track record of performance. Much time and effort may be expended in the attempt to attract sufficient private finance without the required results. Furthermore, private finance is usually more expensive than general government borrowing and this will particularly be the case for programmes that are seen by the financiers as carrying significant levels of risk. |
Further Information and Guidance
|
Relevante Case Studies:
References
Authors
Authors: Mary Willcox, Dean Cooper
Acknowledgements
The Review was prepared by Mary Willcox and Dean Cooper of Practical Action Consulting working with Hadley Taylor, Silvia Cabriolu-Poddu and Christina Stuart of the EU Energy Initiative Partnership Dialogue Facility (EUEIPDF) and Michael Koeberlein and Caspar Priesemann of the Energising Development Programme (EnDev). It is based on a literature review, stakeholder consultations. The categorization framework in the review tool is based on the EUEI/PDF / Practical Action publication "Building Energy Access Markets - A Value Chain Analysis of Key Energy Market Systems".
A wider range of stakeholders were consulted during its preparation and we would particularly like to thank the following for their valuable contributions and insights: - Jeff Felten, AfDB - Marcus Wiemann and other members, ARE - Guilherme Collares Pereira, EdP - David Otieno Ochieng, EUEI-PDF - Silvia Luisa Escudero Santos Ascarza, EUEI-PDF - Nico Peterschmidt, Inensus - John Tkacik, REEEP - Khorommbi Bongwe, South Africa: Department of Energy - Rashid Ali Abdallah, African Union Commission - Nicola Bugatti, ECREEE - Getahun Moges Kifle, Ethiopian Energy Authority - Mario Merchan Andres, EUEI-PDF - Tatjana Walter-Breidenstein, EUEI-PDF - Rebecca Symington, Mlinda Foundation - Marcel Raats, RVO.NL - Nico Tyabji, Sunfunder -
Any feedback would be very welcome. If you have any comments or enquires please contact: mary.willcox@practicalaction.org.uk, benjamin.attigah@euei-pdf.org, or caspar.priesemann@giz.de.
Download the Tool as a Power Point: https://energypedia.info/images/a/aa/National_Approaches_to_Electrification_-_Review_of_Options.pptx