Difference between revisions of "Solar Operation and Maintenance Best Practices in Mexico"
***** (***** | *****) |
***** (***** | *****) |
||
Line 5: | Line 5: | ||
− | = Description = | + | |
+ | = Data & Monitoring requirements best practices Description = | ||
<span style="color: rgb(84, 89, 95); font-family: Roboto, sans-serif; font-size: 14px; background-color: rgb(255, 255, 255);">The Spanish-language Mexican edition of the O&M Best Practices Guidelines, is based on </span>[http://www.solarpowereurope.org/operations-maintenance-best-practices-guidelines-version-2-0/ Version 2.0 of the O&M Best Practices Guidelines]<span style="color: rgb(84, 89, 95); font-family: Roboto, sans-serif; font-size: 14px; background-color: rgb(255, 255, 255);"> and addresses the specificities of the Mexican solar market. It was prepared in collaboration between SolarPower Europe and ASOLMEX and is supported by the “Large Scale Solar Energy Program” of the German-Mexican bilateral cooperation, implemented by the Mexican Secretariat of Energy (SENER) and the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH on behalf of the German Ministry for Economic Cooperation and Development (BMZ).</span> | <span style="color: rgb(84, 89, 95); font-family: Roboto, sans-serif; font-size: 14px; background-color: rgb(255, 255, 255);">The Spanish-language Mexican edition of the O&M Best Practices Guidelines, is based on </span>[http://www.solarpowereurope.org/operations-maintenance-best-practices-guidelines-version-2-0/ Version 2.0 of the O&M Best Practices Guidelines]<span style="color: rgb(84, 89, 95); font-family: Roboto, sans-serif; font-size: 14px; background-color: rgb(255, 255, 255);"> and addresses the specificities of the Mexican solar market. It was prepared in collaboration between SolarPower Europe and ASOLMEX and is supported by the “Large Scale Solar Energy Program” of the German-Mexican bilateral cooperation, implemented by the Mexican Secretariat of Energy (SENER) and the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH on behalf of the German Ministry for Economic Cooperation and Development (BMZ).</span> | ||
Line 52: | Line 53: | ||
9:15 - 9:35 | 9:15 - 9:35 | ||
− | ! scope="col" style="width: 238px;" | <sub>Risk mitigation, bankability and O&M | + | ! scope="col" style="width: 238px;" | <sub>Risk mitigation, bankability and O&M</sub> |
! scope="col" style="width: 418px;" | | ! scope="col" style="width: 418px;" | | ||
<sub><sup>Nelsy Santiago</sup></sub><br/> | <sub><sup>Nelsy Santiago</sup></sub><br/> | ||
Line 58: | Line 59: | ||
<sub><sup>Ulrike Jahn</sup></sub><br/> | <sub><sup>Ulrike Jahn</sup></sub><br/> | ||
− | + | <sup><sub>TÜV Rheinland</sub></sup> | |
|- | |- | ||
! scope="row" style="width: 88px;" | 9:35 - 9:55 | ! scope="row" style="width: 88px;" | 9:35 - 9:55 | ||
− | ! scope="col" style="width: 238px;" | <sub>Contractual framework for bankable O&M services | + | ! scope="col" style="width: 238px;" | <sub>Contractual framework for bankable O&M services </sub> |
! scope="col" style="width: 418px;" | | ! scope="col" style="width: 418px;" | | ||
<sup><sub>Neil Bautista</sub></sup> | <sup><sub>Neil Bautista</sub></sup> | ||
Line 74: | Line 75: | ||
*<sub>What are the specificities of the Mexican O&M market and jurisdiction?</sub><br/> | *<sub>What are the specificities of the Mexican O&M market and jurisdiction?</sub><br/> | ||
− | * | + | *<sub>Mexico in the "Install & Forget" phase?</sub> |
! scope="col" style="width: 418px;" | | ! scope="col" style="width: 418px;" | | ||
Line 87: | Line 88: | ||
! scope="col" style="width: 238px;" rowspan="1" colspan="2" | Coffee Break | ! scope="col" style="width: 238px;" rowspan="1" colspan="2" | Coffee Break | ||
|- | |- | ||
− | ! scope="row" style="width: 88px;" | <br/> | + | ! scope="row" style="width: 88px;" colspan="3" | Session 3: Best practice requirements in solar power plant operations, maintenance, monitoring and module cleaning |
− | ! scope="col" style="width: 238px;" | <br/> | + | |- |
− | ! scope="col" style="width: 418px;" | <br/> | + | ! scope="row" style="width: 88px;" | 11:00 - 11:20 |
+ | ! scope="col" style="width: 238px;" | <sub>Best Practices in Power Plant Operations and Power Plant Maintenance </sub> | ||
+ | ! scope="col" style="width: 418px;" | | ||
+ | <sup><sub>Carlos Salas<br/></sub></sup> | ||
+ | |||
+ | <sup><sub>Enel Green Power</sub></sup> | ||
+ | |||
+ | |- | ||
+ | ! scope="row" style="width: 88px;" | 11:20 - 11:40 | ||
+ | ! scope="col" style="width: 238px;" | <sup><sub></sub></sup><sub>Data & Monitoring requirements best practices and key performance indicators (KPIs)</sub><sup><sub><br/></sub></sup> | ||
+ | ! scope="col" style="width: 418px;" | | ||
+ | <sub><sup>Paul Nist<br/></sup></sub> | ||
+ | |||
+ | <sub><sup>QOS Energy</sup></sub> | ||
+ | |||
+ | |- | ||
+ | ! scope="row" style="width: 88px;" | 11:40 - 12:00 | ||
+ | ! scope="col" style="width: 238px;" | <sub>Module cleaning best practices</sub> | ||
+ | ! scope="col" style="width: 418px;" | | ||
+ | <sub><sup>Steve Williams<br/></sup></sub> | ||
+ | |||
+ | <sub><sup>Clean Solar Solutions</sup></sub> | ||
+ | |||
+ | |- | ||
+ | ! scope="row" style="width: 88px;" | 12:00 - 12:30 | ||
+ | ! scope="col" style="width: 238px;" | <p style="font-weight: 700; text-align: center; background-color: rgb(255, 255, 255);"><sub>Panel discussion and Q&A</sub><br/></p> | ||
+ | *<sub>How can be the best practices be adapted to the Mexican market?</sub><br/> | ||
+ | *<sub>How are the monitoring solutions evolving to help the O&M market?</sub> | ||
+ | |||
+ | ! scope="col" style="width: 418px; text-align: left;" | | ||
+ | *<sup><sub>Carlos Salas</sub></sup> | ||
+ | *<sup><sub>Paul Nist</sub></sup> | ||
+ | *<sup><sub>Steve Williams</sub></sup> | ||
+ | *<sup><sub>Julian Willenbrock</sub></sup> | ||
+ | *<sup><sub>Carla Ortiz</sub></sup> | ||
+ | |||
|- | |- | ||
− | ! scope="row" style="width: 88px;" | | + | ! scope="row" style="width: 88px;" | 12:30 - 12:45 |
− | ! scope="col" style="width: 238px;" | < | + | ! scope="col" style="width: 238px;" | <sub>Closing remarks</sub> |
− | ! scope="col" style="width: 418px;" | <br/> | + | ! scope="col" style="width: 418px;" | |
+ | Héctor Olea<br/> | ||
+ | |||
+ | Aurélie Beauvais | ||
+ | |||
+ | Joscha Rosenbusch | ||
+ | |||
|} | |} | ||
Revision as of 01:01, 11 September 2018
Data & Monitoring requirements best practices Description
The Spanish-language Mexican edition of the O&M Best Practices Guidelines, is based on Version 2.0 of the O&M Best Practices Guidelines and addresses the specificities of the Mexican solar market. It was prepared in collaboration between SolarPower Europe and ASOLMEX and is supported by the “Large Scale Solar Energy Program” of the German-Mexican bilateral cooperation, implemented by the Mexican Secretariat of Energy (SENER) and the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH on behalf of the German Ministry for Economic Cooperation and Development (BMZ).
AGENDA | ||
---|---|---|
8:00 - 8:15 |
Registration and welcome coffee |
|
Session 1: Introduction O&M in Europe and Mexico.
| ||
8:30 - 8:45 |
Overview presentation of the SolarPower Europe O&M Best Practices Guidelines
|
Máté Heisz Solar Power Europe |
8:45 - 9:00 | Utility-scale solar O&M in Mexico |
Félix Arroyo Atlas Renewable Energy Mexico |
9:00 - 9:15 | O&M in distributed solar in Mexico |
Arturo Duhart Asolmex |
Session 2: Bankability of solar power plants and O&M Services
| ||
9:15 - 9:35 |
Risk mitigation, bankability and O&M |
Nelsy Santiago Ulrike Jahn TÜV Rheinland |
9:35 - 9:55 | Contractual framework for bankable O&M services |
Neil Bautista BayWa r.e. |
10:00 - 10:30 |
Panel discussion and Q&A
|
|
10:30 - 11:00 | Coffee Break | |
Session 3: Best practice requirements in solar power plant operations, maintenance, monitoring and module cleaning | ||
11:00 - 11:20 | Best Practices in Power Plant Operations and Power Plant Maintenance |
Carlos Salas Enel Green Power |
11:20 - 11:40 | Data & Monitoring requirements best practices and key performance indicators (KPIs) |
Paul Nist QOS Energy |
11:40 - 12:00 | Module cleaning best practices |
Steve Williams Clean Solar Solutions |
12:00 - 12:30 | Panel discussion and Q&A
|
|
12:30 - 12:45 | Closing remarks |
Héctor Olea Aurélie Beauvais Joscha Rosenbusch |
Presentations
The presentations of the programme can be downloaded on the links below